View examination library (PDF, 1MB) containing document reference numbers
-
6.2.9.1 Environmental Statement Appendix 9.1 - Transport Assessment - TA-B ProFun Supporting Information (4e of 33)
(PDF, 3MB)
From London Resort Company Holdings
-
6.2.14.5 Environmental Statement Appendix 14.5 - Technical Note 1- People Mover Route - Alignment Options Appraisal, 2020
(PDF, 1MB)
From London Resort Company Holdings
-
6.2.16.4 Environmental Statement Appendix 16.4 - Contour maps
(PDF, 371KB)
From London Resort Company Holdings
-
6.3.12.16 Environmental Statement Figure 12.16 - Bat Activity Results per Species
(PDF, 2MB)
From London Resort Company Holdings
-
6.2.17.2 Environmental Statement Appendix 17.2 - Surface Water Drainage Strategy
(PDF, 9MB)
From London Resort Company Holdings
-
6.2.18.8 Environmental Statement Appendix 18.8 Groundsure Insight Report (2020) (1 of 5)
(PDF, 49MB)
From London Resort Company Holdings
-
6.2.17.1 Environmental Statement Appendix 17.1 - Flood Risk Assessment
(PDF, 28MB)
From London Resort Company Holdings
-
6.2.18.14 Environmental Statement Appendix 18.14 - Minutes from meetings with Environment Agency and local authority regulators
(PDF, 273KB)
From London Resort Company Holdings
-
6.2.19.2 Environmental Statement Appendix 19.2 Outline Construction Waste Management Plan
(PDF, 1MB)
From London Resort Company Holdings
-
6.2.16.1 Environmental Statement Appendix 16.1 - All Receptor Locations
(PDF, 349KB)
From London Resort Company Holdings
-
6.2.16.3 Environmental Statement Appendix 16.3 - Modelled Results (Human Receptors)
(PDF, 1MB)
From London Resort Company Holdings
-
6.2.9.1 Environmental Statement Appendix 9.1 - Transport Assessment - TA-B ProFun Supporting Information (4b of 33)
(PDF, 5MB)
From London Resort Company Holdings
-
6.2.9.1 Environmental Statement Appendix 9.1 - Transport Assessment - TA-B ProFun Supporting Information (4d of 33)
(PDF, 3MB)
From London Resort Company Holdings
-
6.2.14.7 Environmental Statement Appendix 14.7 - Earth Resistivity Tomography and Electromagnetic Induction Survey Report, 2017
(PDF, 7MB)
From London Resort Company Holdings
-
6.2.14.9 Environmental Statement Appendix 14.9 - Historic Environment Framework, December 2020
(PDF, 10MB)
From London Resort Company Holdings
-
6.2.17.4 Environmental Statement Appendix 17.4 - Hydrodynamic and Sedimentary Assessment
(PDF, 34MB)
From London Resort Company Holdings
-
6.2.18.11 Environmental Statement Appendix 18.11 - Peninsula Annual Report
(PDF, 17MB)
From London Resort Company Holdings
-
6.2.18.13 Environmental Statement Appendix 18.13 - Route options across Bakers Hole SSSI
(PDF, 1MB)
From London Resort Company Holdings
-
6.3.12.18 Environmental Statement Figure 12.18 - Dormouse Survey Nest Tube Locations and Previous Records
(PDF, 626KB)
From London Resort Company Holdings
-
6.3.12.17 Environmental Statement Figure 12.17 - Bat Activity Heat Maps
(PDF, 886KB)
From London Resort Company Holdings
-
6.3.12.19 Environmental Statement Figure 12.19 - Dormouse Survey Results 2020
(PDF, 2MB)
From London Resort Company Holdings
-
6.2.15.2 Environmental Statement Appendix 15.2 - Planning policy and technical guide
(PDF, 423KB)
From London Resort Company Holdings
-
6.2.17.5 Environmental Statement Appendix 17.5 - Scoping an PEIR responses
(PDF, 561KB)
From London Resort Company Holdings
-
6.2.18.1 Environmental Statement Appendix 18.1 - Phase 1 Geo-environmental and Geotechnical Risk Assessment (December 2014)
(PDF, 30MB)
From London Resort Company Holdings
-
6.2.18.8 Environmental Statement Appendix 18.8 Groundsure Insight Report (2020) (5 of 5)
(PDF, 5MB)
From London Resort Company Holdings
-
6.2.18.10 Environmental Statement Appendix 18.10 - Bamber Quarry Landfill Report (2019)
(PDF, 9MB)
From London Resort Company Holdings
-
6.3.17.30 Environmental Statement Figure 17.30 - Kent Project Site Option C different in magnitude at peak flood tide against baseline
(PDF, 308KB)
From London Resort Company Holdings
-
6.3.20.3 Environmental Statement Figure 20.3 - Graph showing estimated cumulative GHG emissions associate with operational energy for current land uses
(PDF, 242KB)
From London Resort Company Holdings
-
6.3.17.3 Environmental Statement Figure 17.3 - Existing flood defence alignment and crest levels at Essex Project Site.
(PDF, 625KB)
From London Resort Company Holdings
-
6.3.18.4 Environmental Statement Figure 18.4 - Geology – superficial deposits
(PDF, 1MB)
From London Resort Company Holdings
-
6.2.18.8 Environmental Statement Appendix 18.8 Groundsure Insight Report (2020) (2 of 5)
(PDF, 49MB)
From London Resort Company Holdings
-
6.2.18.8 Environmental Statement Appendix 18.8 Groundsure Insight Report (2020) (3 of 5)
(PDF, 49MB)
From London Resort Company Holdings
-
6.2.17.3 Environmental Statement Appendix 17.3 - Surface Water Quality Testing
(PDF, 12MB)
From London Resort Company Holdings
-
6.2.18.6 Environmental Statement Appendix 18.6 - Phase 1 Geo-environmental Assessment Update - Kent Project Site (Swanscombe Peninsula)
(PDF, 12MB)
From London Resort Company Holdings
-
6.2.15.4 Environmental Statement Appendix 15.4 - Operational noise and vibration assessment
(PDF, 2MB)
From London Resort Company Holdings
-
6.2.19.1 Environmental Statement Appendix 19.1 Outline Operational Waste Management Strategy
(PDF, 1MB)
From London Resort Company Holdings
-
6.2.19.3 Environmental Statement Appendix 19.3 Section 42 consultation
(PDF, 364KB)
From London Resort Company Holdings
-
6.3.17.8 Environmental Statement Figure 17.8 - Existing drainage sub catchments in north of Peninsula
(PDF, 346KB)
From London Resort Company Holdings
-
6.3.18.6 Environmental Statement Figure 18.6 - Area of landfilling within DCO Order Limits
(PDF, 1MB)
From London Resort Company Holdings
-
6.3.18.7 Environmental Statement Figure 18.7 - Illustrative Masterplan
(PDF, 2MB)
From London Resort Company Holdings
-
6.3.18.9 Environmental Statement 18.9 - Earthworks plan for Swanscombe Peninsula
(PDF, 3MB)
From London Resort Company Holdings
-
6.3.19.1 Environmental Statement Figure 19.1 - Zones A-C Land Use Markup
(PDF, 310KB)
From London Resort Company Holdings
-
6.2.18.12 Environmental Statement Appendix 18.12 - Northfleet Landfill Annual Monitoring Report (2019)
(PDF, 2MB)
From London Resort Company Holdings
-
6.2.18.15 Environmental Statement Appendix 18.15 - Specification for groundwater and surface water monitoring
(PDF, 21MB)
From London Resort Company Holdings
-
6.2.18.17 Environmental Statement Appendix 18.17 - Preliminary Tunnel Impact Assessment
(PDF, 13MB)
From London Resort Company Holdings
-
6.2.14.8 Environmental Statement Appendix 14.8 - Land north of Springhead Nursery, Archaeological Evaluation Report, 2017
(PDF, 19MB)
From London Resort Company Holdings
-
6.2.18.5 Environmental Statement Appendix 18.5 - Phase 1 Geo-environmental Assessment - Essex Project site
(PDF, 49MB)
From London Resort Company Holdings
-
6.2.18.7 Environmental Statement Appendix 18.7 Phase 1 Geo-environmental Assessment Update - Kent Project Site (A2 Access Corridor)
(PDF, 10MB)
From London Resort Company Holdings
-
6.2.18.16 Environmental Statement Appendix 18.16 - Water quality monitoring data report
(PDF, 8MB)
From London Resort Company Holdings
-
6.3.20.1 Environmental Statement Figure 20.1 - Diagram showing stage of a lifecycle GHG emission assessment
(PDF, 286KB)
From London Resort Company Holdings
-
6.3.17.5 Environmental Statement Figure 17.5 - Surface water features Essex Project Site
(PDF, 348KB)
From London Resort Company Holdings
-
6.3.17.7 Environmental Statement Figure 17.7 - Existing surface water drainage catchments
(PDF, 439KB)
From London Resort Company Holdings
-
6.3.18.8 Environmental Statement Figure 18.8 - Landscape masterplan
(PDF, 12MB)
From London Resort Company Holdings
-
6.3.18.10 Environmental Statement Figure 18.10 - Highway Plans - General Arrangement - Sheet 2 of 9
(PDF, 8MB)
From London Resort Company Holdings
-
6.2.14.6 Environmental Statement Appendix 14.6 - Detailed Gradiometer Survey, 2017
(PDF, 3MB)
From London Resort Company Holdings
-
6.2.16.5 Environmental Statement Appendix 16.5 - Modelling Results (Ecological Receptors)
(PDF, 350KB)
From London Resort Company Holdings
-
6.2.18.3 Environmental Statement Appendix 18.3 - Geotechnical and Geo-environmental Interpretive Report
(PDF, 12MB)
From London Resort Company Holdings
-
6.3.17.31 Environmental Statement Figure 17.31 - Essex Project Site difference in magnitude at peak ebb tide against baseline
(PDF, 265KB)
From London Resort Company Holdings
-
6.3.17.4 Environmental Statement Figure 17.4 - Surface water features Kent Project Site
(PDF, 439KB)
From London Resort Company Holdings
-
6.3.17.6 Environmental Statement Figure 17.6 - Location of Swanscombe Marine Conservation Zone
(PDF, 911KB)
From London Resort Company Holdings
-
6.3.17.9 Environmental Statement Figure 17.9 - Existing Utilities
(PDF, 712KB)
From London Resort Company Holdings
-
6.3.17.32 Environmental Statement Figure 17.32 - Essex Project Site difference in magnitude at peak flood tide against baseline
(PDF, 266KB)
From London Resort Company Holdings
-
6.3.18.11 Environmental Statement Figure 18.11 - Highway Plans - General Arrangement - Sheet 4 of 9
(PDF, 11MB)
From London Resort Company Holdings
-
6.3.20.2 Environmental Statement Figure 20.2 - Graph showing estimated annual GHG emissions associated with operational energy for current land uses
(PDF, 251KB)
From London Resort Company Holdings
-
6.3.17.33 Environmental Statement Figure 17.33 - Proposed mitigation measures
(PDF, 713KB)
From London Resort Company Holdings
-
6.3.18.2 Environmental Statement Figure 18.2 - Zoning of Kent Project Site (1 of 2)
(PDF, 1MB)
From London Resort Company Holdings
-
6.3.18.3 Environmental Statement Figure 18.3 - Zoning of Kent Project Site (2 of 2)
(PDF, 1MB)
From London Resort Company Holdings
-
6.3.18.5 Environmental Statement Figure 18.5 - Geology – bedrock
(PDF, 2MB)
From London Resort Company Holdings
-
6.3.18.1 Environmental Statement Figure 18.1 - Ground conditions study area
(PDF, 1MB)
From London Resort Company Holdings
-
6.3.18.12 Environmental Statement Figure 18.12 - Highway Plans - General Arrangement - Sheet 5 of 9
(PDF, 8MB)
From London Resort Company Holdings
-
6.3.18.13 Environmental Statement Figure 18.13 - Highway Plans - Proposed Contours, Levels and Alignment Changes - Sheet 2 of 9
(PDF, 7MB)
From London Resort Company Holdings
-
6.3.18.14 Environmental Statement Figure 18.14 - Highway Plans - Proposed Contours, Levels and Alignment Changes - Sheet 4 of 9
(PDF, 11MB)
From London Resort Company Holdings
-
6.3.18.15 Environmental Statement Figure 18.15 - Highway Plans - Proposed Contours, Levels and Alignment Changes - Sheet 5 of 9
(PDF, 8MB)
From London Resort Company Holdings
-
6.3.15.7 Environmental Statement Figure 15.7 - Extent of LAeq,t noise climate changes greater than 3dB from London Resort Access Road general construction activities
(PDF, 430KB)
From London Resort Company Holdings
-
6.3.15.12 Environmental Statement Figure 15.12 - Extent of LAeq,t noise propagation from London Resort passenger
(PDF, 425KB)
From London Resort Company Holdings
-
6.2.9.1 Environmental Statement Appendix 9.1 Transport Assessment: Appendix TA-K Highway Works - General Arrangement Drawings (13 of 33)
(PDF, 10MB)
From London Resort Company Holdings
-
6.2.9.1 Environmental Statement Appendix 9.1 Transport Assessment: Appendix TA-L Parking Proposals (14 of 33)
(PDF, 625KB)
From London Resort Company Holdings
-
6.3.15.8 Environmental Statement Figure 15.8 - Extent of LAeq,t noise climate changes greater than 3dB from London Resort Hotel General Construction activities
(PDF, 431KB)
From London Resort Company Holdings
-
6.3.15.10 Environmental Statement Figure 15.10 - Extent of LAeq,t noise climate changes greater than 3dB from London Resort 2038 traffic predictions
(PDF, 431KB)
From London Resort Company Holdings
-
6.2.9.1 Environmental Statement Appendix 9.1 Transport Assessment: Appendix TA-M Technical Note 1 (TN1) - Trip Generation (15 of 33)
(PDF, 4MB)
From London Resort Company Holdings
-
6.2.9.1 Environmental Statement Appendix 9.1 Transport Assessment: Appendix TA-N Technical Note 2 (TN2) - Trip Distribution (16 of 33)
(PDF, 3MB)
From London Resort Company Holdings
-
6.3.15.6 Environmental Statement Figure 15.6 - Extent of LAeq,t noise climate changes greater than 3dB from general construction activities at infrastructure plant compounds
(PDF, 431KB)
From London Resort Company Holdings
-
6.3.15.11 Environmental Statement Figure 15.11 - Extent of LA,max,f noise propagation from London Resort
(PDF, 433KB)
From London Resort Company Holdings
-
6.3.15.5 Environmental Statement Figure 15.5 - Extent of LAeq,t noise climate changes greater than 3dB from Gate 2 general construction activities
(PDF, 430KB)
From London Resort Company Holdings
-
6.2.8.4 Environmental Statement Appendix 8.4 Literature Review
(PDF, 2MB)
From London Resort Company Holdings
-
6.3.15.9 Environmental Statement Figure 15.9 - Extent of LAeq,t noise climate changes greater than 3dB from Tilbury Car Park general construction activities
(PDF, 433KB)
From London Resort Company Holdings
-
6.2.3.2 Environmental Statement Appendix 3.2 Outline Construction and Environmental Management Plan (CEMP)
(PDF, 1MB)
From London Resort Company Holdings
-
6.2.9.1 Environmental Statement Appendix 9.1 Transport Assessment: Appendix TA-O Technical Note 3 (TN3) - Mode Share (17 of 33)
(PDF, 5MB)
From London Resort Company Holdings
-
6.2.9.1 Environmental Statement Appendix 9.1 Transport Assessment: Appendix TA-P Technical Note 4 (TN4) - Future Mobility (18 of 33)
(PDF, 9MB)
From London Resort Company Holdings
-
6.2.9.1 Environmental Statement Appendix 9.1 Transport Assessment: Appendix TA-S Spreadsheet Modelling Methodology Note (21 of 33)
(PDF, 6MB)
From London Resort Company Holdings
-
6.2.9.1 Environmental Statement Appendix 9.1 Transport Assessment: Appendix TA-T London Road-High Street - Pedestrian-Cycle Crossing (22 of 33)
(PDF, 190KB)
From London Resort Company Holdings
-
6.2.7.6 Environmental Statement Appendix 7.6 Attendance Technical Note
(PDF, 2MB)
From London Resort Company Holdings
-
6.2.7.7 Environmental Statement Appendix 7.7 Outline Employment and Skills Strategy
(PDF, 2MB)
From London Resort Company Holdings
-
6.2.9.1 Environmental Statement Appendix 9.1 Transport Assessment: Appendix TA-U Rail Strategy Plan (23 of 33)
(PDF, 3MB)
From London Resort Company Holdings
-
6.2.9.1 Environmental Statement Appendix 9.1 Transport Assessment: Appendix TA-W Uber Boats by Thames Clipper Operation Proposal (25 of 33)
(PDF, 1MB)
From London Resort Company Holdings
-
6.2.4.1 Environmental Statement Appendix 4.1 Assessment reports for the eleven site options considered by LRCH prior to the selection of Swanscombe Peninsula
(PDF, 495KB)
From London Resort Company Holdings
-
6.2.7.1 Environmental Statement Appendix 7.1 Detailed Policy
(PDF, 782KB)
From London Resort Company Holdings
-
6.2.9.1 Environmental Statement Appendix 9.1 Transport Assessment: TA Figures (2 of 33)
(PDF, 31MB)
From London Resort Company Holdings
-
6.2.9.1 Environmental Statement Appendix 9.1 Transport Assessment: Appendix TA-Q Total Vehicle Trip Distribution (19 of 33)
(PDF, 3MB)
From London Resort Company Holdings
-
6.2.9.1 Environmental Statement Appendix 9.1 Transport Assessment: Appendix TA-R London Resort Traffic Flow Diagrams (20 of 33)
(PDF, 811KB)
From London Resort Company Holdings