View examination library (PDF, 1MB) containing document reference numbers
-
6.3.12.9 Environmental Statement Figure 12.9 - Breeding Bird Survey Plan (May 2020)
(PDF, 2MB)
From London Resort Company Holdings
-
6.3.12.11 Environmental Statement Figure 12.11 - Breeding Bird Survey Plan (July 2020)
(PDF, 2MB)
From London Resort Company Holdings
-
6.3.11.15 Environmental Statement Figure 11.15 - Illustrative Landscape Masterplan
(PDF, 11MB)
From London Resort Company Holdings
-
6.3.12.5 Environmental Statement Figure 12.5 - Rare Plants Species Population Plan
(PDF, 461KB)
From London Resort Company Holdings
-
6.3.12.7 Environmental Statement Figure 12.7 - River Ebbsfleet River Habitat Survey Sections and Results
(PDF, 409KB)
From London Resort Company Holdings
-
6.3.12.23 Environmental Statement Figure 12.23 - Harvest Mouse Survey Plan
(PDF, 515KB)
From London Resort Company Holdings
-
6.3.10.1 Environmental Statement Figure 10.1 - NRA - Extent of Assessment
(PDF, 3MB)
From London Resort Company Holdings
-
6.3.12.54 Environmental Statement Figure 12.54 - Water Vole Receptor – Design
(PDF, 749KB)
From London Resort Company Holdings
-
6.3.12.56 Environmental Statement Figure 12.56 - Tree Constraints Plan
(PDF, 27MB)
From London Resort Company Holdings
-
6.3.12.13 Environmental Statement Figure 12.13 - Preliminary Roost Assessment of Buildings
(PDF, 20MB)
From London Resort Company Holdings
-
6.3.12.15 Environmental Statement Figure 12.15 - Bat Transect Survey Results
(PDF, 2MB)
From London Resort Company Holdings
-
6.3.11.10 Environmental Statement Figure 11.10 - Photoviewpoint Locations
(PDF, 3MB)
From London Resort Company Holdings
-
6.3.11.12 Environmental Statement Figure 11.12 - Photoviewpoints
(PDF, 72MB)
From London Resort Company Holdings
-
6.3.11.6 Environmental Statement Figure 11.6 - Local Landscape Character Areas
(PDF, 755KB)
From London Resort Company Holdings
-
6.3.11.8 Environmental Statement Figure 11.8 - ZTV of the Site in its Current Form
(PDF, 710KB)
From London Resort Company Holdings
-
6.3.13.5 Environmental Statement Figure 13.5 - Structures within the Kent Project Site and interaction with intertidal and subtidal habitats
(PDF, 2MB)
From London Resort Company Holdings
-
6.3.14.2 Environmental Statement Figure 14.2 - The Essex Project Site and Designated Heritage Assets within 1km Study Area
(PDF, 3MB)
From London Resort Company Holdings
-
6.3.12.25 Environmental Statement Figure 12.25 - Reptile Survey Plan and Previous Records
(PDF, 503KB)
From London Resort Company Holdings
-
6.3.11.2 Environmental Statement Figure 11.2 - Landscape Designations and Other Considerations
(PDF, 805KB)
From London Resort Company Holdings
-
6.3.11.4 Environmental Statement Figure 11.4 - National Character Areas
(PDF, 730KB)
From London Resort Company Holdings
-
6.3.13.1 Environmental Statement Figure 13.1 - Order Limits
(PDF, 3MB)
From London Resort Company Holdings
-
6.3.14.10 Environmental Statement Figure 14.10 - Maritime Heritage Assets at the Kent Project Site
(PDF, 3MB)
From London Resort Company Holdings
-
6.3.14.12 Environmental Statement Figure 14.12 - Non-designated Built Heritage Assets discussed within the Built Heritage Statement
(PDF, 2MB)
From London Resort Company Holdings
-
6.3.12.27 Environmental Statement Figure 12.27 - Aquatic Macroinvertebrate Sample Locations (standing waterbodies)
(PDF, 581KB)
From London Resort Company Holdings
-
6.3.17.10 Environmental Statement Figure 17.10 - Kent Project Site access roads existing catchments
(PDF, 427KB)
From London Resort Company Holdings
-
6.3.14.6 Environmental Statement Figure 14.6 - Undesignated Heritage Assets within the Kent Project site (monument points) excluding findspots (south)
(PDF, 2MB)
From London Resort Company Holdings
-
6.3.14.8 Environmental Statement Figure 14.8 - Undesignated Heritage Assets within the Kent Project site (all records excluding findspots) (west)
(PDF, 2MB)
From London Resort Company Holdings
-
6.3.12.29 Environmental Statement Figure 12.29 - Aquatic Macroinvertebrate Survey Results (River Ebbsfleet) Autumn 2020
(PDF, 406KB)
From London Resort Company Holdings
-
6.3.12.31 Environmental Statement Figure 12.31 - Statutory Designations Recognised for Their Importance to Overwintering Birds
(PDF, 413KB)
From London Resort Company Holdings
-
6.3.14.4 Environmental Statement Figure 14.4 - Undesignated Heritage Assets within the Kent Project site (monument points) excluding findspots (north)
(PDF, 2MB)
From London Resort Company Holdings
-
6.3.16.4 Environmental Statement Figure 16.4 - Ecological Receptors 2km from Point Source
(PDF, 459KB)
From London Resort Company Holdings
-
6.3.16.6 Environmental Statement Figure 16.6 - Model Verification Sites and Zones
(PDF, 538KB)
From London Resort Company Holdings
-
6.3.16.8 Environmental Statement Figure 16.8 - Nearby Monitoring Sites
(PDF, 524KB)
From London Resort Company Holdings
-
6.3.17.26 Environmental Statement Figure 17.26 - Option A
(PDF, 329KB)
From London Resort Company Holdings
-
6.3.17.28 Environmental Statement Figure 17.28 - Option C
(PDF, 308KB)
From London Resort Company Holdings
-
6.3.12.30 Environmental Statement Figure 12.30 - Site Location Plan and Core Count Zones for Low and High Tide Surveys
(PDF, 422KB)
From London Resort Company Holdings
-
6.3.16.5 Environmental Statement Figure 16.5 - Ecological Receptors 10km from Point Source
(PDF, 537KB)
From London Resort Company Holdings
-
6.3.13.3 Environmental Statement Figure 13.3 - Structures associated with the London Resort within the marine environment Option B
(PDF, 2MB)
From London Resort Company Holdings
-
6.3.15.2 Environmental Statement Figure 15.2 - Likely significant effect NSR assessment groups and construction noise assessment areas
(PDF, 517KB)
From London Resort Company Holdings
-
6.3.16.2 Environmental Statement Figure 16.2 - Modelled Road Network and Ecological Receptors
(PDF, 550KB)
From London Resort Company Holdings
-
6.3.16.14 Environmental Statement Figure 16.14 - PM2.5 Background Concentrations
(PDF, 530KB)
From London Resort Company Holdings
-
6.3.17.22 Environmental Statement Figure 17.22 - Essex Project Site baseline hydrodynamic at peak flood tide
(PDF, 500KB)
From London Resort Company Holdings
-
6.3.17.24 Environmental Statement Figure 17.24 - Essex Project Site baseline predicted patterns of erosion and deposition
(PDF, 1MB)
From London Resort Company Holdings
-
6.3.12.32 Environmental Statement Figure 12.32 - Winter Bird Survey Results – November 2019
(PDF, 448KB)
From London Resort Company Holdings
-
6.3.12.34 Environmental Statement Figure 12.34 - Winter Bird Survey Results – January 2020
(PDF, 439KB)
From London Resort Company Holdings
-
6.3.16.26 Environmental Statement Figure 16.26 - Waste Water Treatment Works and Receptor
(PDF, 386KB)
From London Resort Company Holdings
-
6.3.17.2 Environmental Statement Figure 17.2 - Existing marshes and spot elevations
(PDF, 361KB)
From London Resort Company Holdings
-
6.3.17.18 Environmental Statement Figure 17.18 - Kent Project Site baseline hydrodynamic at peak ebb tide
(PDF, 3MB)
From London Resort Company Holdings
-
6.3.17.20 Environmental Statement Figure 17.20 - Extent of habitat creation used within hydrodynamic assessment
(PDF, 2MB)
From London Resort Company Holdings
-
6.3.16.7 Environmental Statement Figure 16.7 - Nearby Air Quality Management Areas
(PDF, 515KB)
From London Resort Company Holdings
-
6.3.17.23 Environmental Statement Figure 17.23 - Kent Project Site baseline predicted patterns for erosion and deposition
(PDF, 1MB)
From London Resort Company Holdings
-
6.3.17.25 Environmental Statement Figure 17.25 - Proposed marshland strategy
(PDF, 376KB)
From London Resort Company Holdings
-
6.3.16.12 Environmental Statement Figure 16.12 - NO2 Background Concentrations
(PDF, 520KB)
From London Resort Company Holdings
-
6.3.17.12 Environmental Statement Figure 17.12 - EA Flood map zones 1 to 3 Kent Project Site
(PDF, 314KB)
From London Resort Company Holdings
-
6.3.17.14 Environmental Statement Figure 17.14 - Essex Project Site EA Flood Zones
(PDF, 307KB)
From London Resort Company Holdings
-
6.3.17.16 Environmental Statement Figure 17.16 - Location of marine infrastructure on Swanscombe Peninsula
(PDF, 563KB)
From London Resort Company Holdings
-
6.3.12.40 Environmental Statement Figure 12.40 - Vantage Point Survey Results – February 2020
(PDF, 779KB)
From London Resort Company Holdings
-
6.3.16.9 Environmental Statement Figure 16.9 - Thurrock Monitoring Sites
(PDF, 435KB)
From London Resort Company Holdings
-
6.3.16.10 Environmental Statement Figure 16.10 - Dartford Monitoring Sites
(PDF, 477KB)
From London Resort Company Holdings
-
6.3.17.11 Environmental Statement Figure 17.11 - Existing drainage pipes and EA main rivers around Essex Project Site
(PDF, 556KB)
From London Resort Company Holdings
-
6.3.17.27 Environmental Statement Figure 17.27 - Option B
(PDF, 311KB)
From London Resort Company Holdings
-
6.3.17.29 Environmental Statement Figure 17.29 - Kent Project Site Option C difference in magnitude at peak ebb tide against baseline
(PDF, 307KB)
From London Resort Company Holdings
-
6.3.16.15 Environmental Statement Figure 16.15 - PM10 Background Concentrations
(PDF, 519KB)
From London Resort Company Holdings
-
6.3.16.16 Environmental Statement Figure 16.16 - Human Receptors (Existing Residential) and Modelled Road Network
(PDF, 598KB)
From London Resort Company Holdings
-
6.3.16.23 Environmental Statement Figure 16.23 - Ecological Receptor Transects Darenth Wood
(PDF, 414KB)
From London Resort Company Holdings
-
6.3.12.36 Environmental Statement Figure 12.36 - Winter Bird Survey Results – March 2020
(PDF, 440KB)
From London Resort Company Holdings
-
6.3.12.38 Environmental Statement Figure 12.38 - Vantage Point Survey Results – December 2019
(PDF, 749KB)
From London Resort Company Holdings
-
6.3.16.13 Environmental Statement Figure 16.13 - NOx Background Concentrations
(PDF, 490KB)
From London Resort Company Holdings
-
6.3.16.25 Environmental Statement Figure 16.25 - Port and Nearby Receptors
(PDF, 433KB)
From London Resort Company Holdings
-
6.3.12.42 Environmental Statement Figure 12.42 - Biodiversity Net Gain Assessment – Existing Habitats
(PDF, 3MB)
From London Resort Company Holdings
-
6.3.17.1 Environmental Statement Figure 17.1 - Surface water quality monitoring locations
(PDF, 308KB)
From London Resort Company Holdings
-
6.3.17.17 Environmental Statement Figure 17.17 - Marine infrastructure at and around Tilbury Docks
(PDF, 1MB)
From London Resort Company Holdings
-
6.3.17.19 Environmental Statement Figure 17.19 - Kent Project Site baseline hydrodynamic at peak flood tide
(PDF, 3MB)
From London Resort Company Holdings
-
6.3.16.21 Environmental Statement Figure 16.21 - Ecological Receptor Transects Ebbsfleet
(PDF, 969KB)
From London Resort Company Holdings
-
6.3.16.22 Environmental Statement Figure 16.22 - Ecological Receptor Transects Jackson and Coombesgreen Wood
(PDF, 387KB)
From London Resort Company Holdings
-
6.3.17.13 Environmental Statement Figure 17.13 - Kent Project Site existing formal flood defence berm
(PDF, 324KB)
From London Resort Company Holdings
-
6.3.17.15 ES Figure 17.15 - Essex Project Site existing flood defences
(PDF, 2MB)
From London Resort Company Holdings
-
6.3.16.17 Environmental Statement Figure 16.17 - Human Receptors (Cumulative Residential) and Modelled Road Network
(PDF, 527KB)
From London Resort Company Holdings
-
6.3.16.18 Environmental Statement Figure 16.18 - Human Receptors (School, Carehomes and Hospitals) and Modelled Road Network
(PDF, 547KB)
From London Resort Company Holdings
-
6.3.16.24 Environmental Statement Figure 16.24 - Ecological Receptor Transects The Thrift and Parkhill
(PDF, 409KB)
From London Resort Company Holdings
-
6.3.17.21 Environmental Statement Figure 17.21 - Essex Project Site baseline hydrodynamic at peak ebb tide
(PDF, 546KB)
From London Resort Company Holdings
-
6.3.16.19 Environmental Statement Figure 16.19 - Construction Receptors and Buffers
(PDF, 488KB)
From London Resort Company Holdings
-
6.3.16.20 Environmental Statement Figure 16.20 - Ecological Receptor Transects Rams Wood
(PDF, 676KB)
From London Resort Company Holdings
-
Adequacy of Consultation Representation
(PDF, 994KB)
From Brentwood Borough Council
-
Adequacy of Consultation Representation
(PDF, 987KB)
From East Sussex County Council
-
Adequacy of Consultation Representation
(PDF, 202KB)
From Dartford Borough Council, Ebbsfleet Development Corporation and Kent County Council
-
Adequacy of Consultation Representation
(PDF, 95KB)
From Castle Point Borough Council
-
Adequacy of Consultation Representation
(PDF, 133KB)
From Surrey County Council
-
Adequacy of Consultation Representation
(PDF, 134KB)
From Tonbridge and Malling Borough Council
-
Representation received during acceptance
(PDF, 1MB)
From Thames Crossing Action Group
-
Adequacy of Consultation Representation
(PDF, 116KB)
From Essex County Council
-
Representation received during acceptance
(PDF, 792KB)
From Kent Wildlife Trust, Buglife and RSPB
-
Adequacy of Consultation Representation
(PDF, 85KB)
From Medway Council
-
Representation received during acceptance
(PDF, 65KB)
From Dan Bramwell
-
Adequacy of Consultation Representation
(PDF, 470KB)
From Gravesham Borough Council
-
Adequacy of Consultation Representation
(PDF, 300KB)
From Thurrock Council
-
Adequacy of Consultation Representation
(PDF, 1MB)
From London Borough of Bexley
-
Representation received during acceptance
(PDF, 7MB)
From Federation of Small Businesses
-
Adopted by the Secretary of State on 28 July 2020
(PDF, 28MB)
From Scoping Opinion
-
Scoping Report submitted to the Secretary of State on 17 June 2020.
(PDF, 35MB)
From London Resort Company Holdings