Back to list The London Resort

Representation by Bean Residents Association (Bean Residents Association)

Date submitted
19 February 2021
Submitted by
Non-statutory organisations
  1. That the Highway and Transport Design is inadequate for development of this size. 2. The 85th percentile design basis should be 95% as promised in 2019 A2BE Inquiry 3. The access road does not connect directly to the A2(T) but to a single roundabout. 4. The connection of the access road to the roundabout is not grade separated. 5. A reason given for the minimal design is the limited height under a pylon line 6. A Thames ferry and clipper service are insufficient to reduce traffic on the A2(T) 7. The applicant has not adopted a high capacity light-rail/tram Kent-Essex tunnel 8. Explanations are awaited for including Bean properties in Book of Reference.