Representation by Alexandra Langdon

Date submitted
28 September 2020
Submitted by
Members of the public/businesses

I wish to raise the following issues of concern about Sizewell C. Site Selection I believe it is the wrong project in the wrong place. It will have an Adverse impact on adjacent internationally designated sites of ecological importance and sites of amenity, cultural heritage and landscape value. Community, Economic and social impacts Unacceptable impacts on local communities -, traffic, significant increases in noise, light pollution and disruption. Transport Road based transport plan not sustainable; enormous and adverse impact on local communities and the visitor economy. HGV numbers are as high as those under “Road-Led” proposals rejected by all statutory consultees in consultations Delay in the construction of new road infrastructure means villages would endure 2-3 years of increased traffic New roads would sever communities, damage the rural footpath system and divide farmland. Rat-running and disruption not adequately considered. Alternative relief road routes with legacy value not adequately assessed by EDF Environment and Landscape Unclear effect on Minsmere Sluice Development would result in pollution from light, noise and traffic Dust management for spoil heaps and stockpiles inadequate Impact of the proposed borrow pits and landfill not fully addressed. Abstraction of water compounds risks to the environment and to protected species. Risks to groundwater levels and surrounding habitats and ecology Flood risk due to the loss of flood storage from the development site Catastrophic impact on landscape character because of locality, design and scale; construction severs the AONB Impossible to compensate for landscape and ecological damage Won’t offset CO2 from construction for at least 6 years. Application I wish to endorse the Relevant Representation submitted by Stop Sizewell C. I wish to state that I consider the Sizewell C application to be totally unsuitable for a digital examination process.