Representation by Sandra Gage

Date submitted
29 September 2020
Submitted by
Members of the public/businesses

I wish to object to the construction of Sizewell C for the following reasons; 1. The impact on the unique environment at Sizewell and surrounding countryside of both Sizewell C itself and associated buildings & infrastructure to; a) designated AONB b) the area of SSSI c) surrounding parishes where the proposals will be wholly out of character and permanently diminish the character of the area. 2. The lack of consideration of the overall impact on this section of the coastline and countryside of all energy projects proposed or already planned. 3. The lack of consideration of all energy generation in other planned or proposed renewable energy projects in determining the need for Sizewell C. 4.The lack of clarity over the true cost and construction over-run times to build given the actual costs of the same construction of the same reactor in Europe. 5. The lack of true cost calculated on tourism, and local businesses & local communities that rely on the coastline for income. 6. The refusal by EDF to address the repeated significant issues by various Bodies in all stages to date of consultation.