-
6.2.13.37 Environmental Statement - Figure 13.37 - Danish VMS Effort (days) by Sandeel Trawlers
(PDF, 817KB)
O East Anglia TWO Limited
-
6.3.22.6 Environmental Statement - Appendix 22.6 - Bat Survey Report
(PDF, 7MB)
O East Anglia TWO Limited
-
6.2.13.28 Environmental Statement - Figure 13.28 - Trawling Grounds of UK Local Fishermen
(PDF, 1MB)
O East Anglia TWO Limited
-
6.2.13.26 Environmental Statement - Figure 13.26 - UK Landings Value by Species
(PDF, 1MB)
O East Anglia TWO Limited
-
6.2.13.27 Environmental Statement - Figure 13.27 - Potting Grounds of UK Local Fishermen
(PDF, 1MB)
O East Anglia TWO Limited
-
6.3.22.5 Environmental Statement - Appendix 22.5 - Water Vole and Otter Presence or Absence Survey Report
(PDF, 11MB)
O East Anglia TWO Limited
-
6.3.26.6 Environmental Statement - Appendix 26.6 - Suffolk - Lorry Route Network (extract) and Highways England - Heavy and High Routes (extract)
(PDF, 3MB)
O East Anglia TWO Limited
-
6.2.13.24 Environmental Statement - Figure 13.24 - Belgian VMS Effort (days) by Demersal Trawlers
(PDF, 752KB)
O East Anglia TWO Limited
-
6.2.13.25 Environmental Statement - Figure 13.25 - UK Landings Value by Method
(PDF, 1MB)
O East Anglia TWO Limited
-
6.3.26.22 Environmental Statement - Appendix 26.22 - Derivation of Construction Material Quantities and Associated HDV Demand (Scenario 1)
(PDF, 264KB)
O East Anglia TWO Limited
-
6.3.23.1 Environmental Statement - Appendix 23.1 - Onshore Ornithology Consultation Response
(PDF, 263KB)
O East Anglia TWO Limited
-
6.2.13.39 Environmental Statement - Figure 13.39 - German Vessel Density
(PDF, 761KB)
O East Anglia TWO Limited
-
6.2.13.40 -Environmental Statement - Figure 13.40 - Location of other projects or activities included in the cumulative assessment
(PDF, 2MB)
O East Anglia TWO Limited
-
6.3.26.19 Environmental Statement - Appendix 26.19 - Junction Modelling Outputs and Turning Count Diagrams
(PDF, 9MB)
O East Anglia TWO Limited
-
6.3.26.20 Environmental Statement - Appendix 26.20 - Link Capacity Modelling
(PDF, 87KB)
O East Anglia TWO Limited
-
6.3.26.4 Environmental Statement - Appendix 26.4 - Swept Path Assessment of Known Pinch Point on Heavy Load Route
(PDF, 10MB)
O East Anglia TWO Limited
-
6.3.26.5 Environmental Statement - Appendix 26.5 - A1094-B1069 Widening for Abnormal Indivisible Load
(PDF, 300KB)
O East Anglia TWO Limited
-
6.2.13.38 Environmental Statement - Figure 13.38 - Danish VMS Effort (days) by Pelagic Trawl
(PDF, 824KB)
O East Anglia TWO Limited
-
6.2.13.4 Environmental Statement - Figure 13.4 - Historical Fishing Rights
(PDF, 1MB)
O East Anglia TWO Limited
-
6.3.26.7 Environmental Statement - Appendix 26.7 - Summary of Commissioned Traffic Counts
(PDF, 3MB)
O East Anglia TWO Limited
-
6.2.13.43 Environmental Statement - Figure 13.43 - Other projects or activities included in the cumulative assessment and Dutch beam trawls VMS effort (average 2014 - 2018)
(PDF, 870KB)
O East Anglia TWO Limited
-
6.2.13.45 Environmental Statement - Figure 13.45 - Other projects or activities included in the cumulative assessment and Dutch Seine Net VMS value (average 2014 - 2018)
(PDF, 841KB)
O East Anglia TWO Limited
-
6.3.26.23 Environmental Statement - Appendix 26.23 - HGV and LCV Traffic Assigned to the Construction Programme (Scenario 1)
(PDF, 382KB)
O East Anglia TWO Limited
-
6.3.26.24 Environmental Statement - Appendix 26.24 - Assignment of HGV and LCV Traffic to the Highway Network (Scenario 1)
(PDF, 128KB)
O East Anglia TWO Limited
-
6.3.26.8 Environmental Statement - Appendix 26.8 - Recorded Personal Injury Collision Locations
(PDF, 5MB)
O East Anglia TWO Limited
-
6.3.27.1 Environmental Statement - Appendix 27.1 - Human Health Consultation Responses
(PDF, 304KB)
O East Anglia TWO Limited
-
6.2.13.30 Environmental Statement - Figure 13.30 - Netting Grounds of UK Local Fishermen
(PDF, 1MB)
O East Anglia TWO Limited
-
6.2.13.32 Environmental Statement - Figure 13.32 - UK VMS Effort (hours) by Beam Trawlers
(PDF, 791KB)
O East Anglia TWO Limited
-
6.2.13.34 Environmental Statement - Figure 13.34 - French Fishing Effort (hours) by Demersal Trawl
(PDF, 563KB)
O East Anglia TWO Limited
-
6.2.13.36 Environmental Statement - Figure 13.36 - French Effort by Pelagic and Demersal Trawlers
(PDF, 553KB)
O East Anglia TWO Limited
-
6.3.26.18 Environmental Statement - Appendix 26.18 - Proposed Preliminary Access Concepts
(PDF, 4MB)
O East Anglia TWO Limited
-
6.3.26.3 Environmental Statement - Appendix 26.3 - Abnormal Indivisible Load Access to the Proposed East Anglia TWO and Proposed East Anglia ONE North Offshore Windfarm Substation
(PDF, 17MB)
O East Anglia TWO Limited
-
6.2.13.41 Environmental Statement - Figure 13.41 - Location of other projects or activities in the proximity of the proposed East Anglia TWO project
(PDF, 2MB)
O East Anglia TWO Limited
-
6.3.26.2 Environmental Statement - Appendix 26.2 - Traffic and Transport Cumulative Impact Assessment with the Proposed East Anglia ONE North Project
(PDF, 482KB)
O East Anglia TWO Limited
-
6.3.26.21 Environmental Statement - Appendix 26.21 - Swept Path Analysis, Sensitive Junctions
(PDF, 660KB)
O East Anglia TWO Limited
-
6.3.26.25 Environmental Statement - Appendix 26.25 - Diagram of Traffic Movements Assigned to the Highway Network (Scenario 1)
(PDF, 252KB)
O East Anglia TWO Limited
-
6.3.26.26 Environmental Statement - Appendix 26.26 - Inter-relationships
(PDF, 375KB)
O East Anglia TWO Limited
-
6.2.13.53 Environmental Statement - Figure 13.53 - Other projects or activities included in the CIA and Fishing Effort in 2014 by French Demersal and Pelagic Trawlers
(PDF, 2MB)
O East Anglia TWO Limited
-
6.2.13.7 Environmental Statement - Figure 13.7 - Dutch VMS Values for Beam Trawls
(PDF, 782KB)
O East Anglia TWO Limited
-
6.2.13.9 Environmental Statement - Figure 13.9 - Voluntary No Fishing Zone for Dutch Pulse Trawlers
(PDF, 1MB)
O East Anglia TWO Limited
-
6.2.16.5 Environmental Statement - Figure 16.5 - Intertidal Heritage Assets and Recorded Losses
(PDF, 1MB)
O East Anglia TWO Limited
-
6.2.13.5 Environmental Statement - Figure 13.5 - Dutch landing Values by Method
(PDF, 1MB)
O East Anglia TWO Limited
-
6.2.13.51 Environmental Statement - Figure 13.51 - Other projects or activities included in the cumulative assessment and fishing effort in 2008 by French Demersal Otter Trawlers
(PDF, 878KB)
O East Anglia TWO Limited
-
6.2.16.3 Environmental Statement - Figure 16.3 - Seabed Features of Archaeological Potential (East Anglia TWO Windfarm Site)
(PDF, 1MB)
O East Anglia TWO Limited
-
6.2.16.4 Environmental Statement - Figure 16.4 - Seabed Features of Archaeological Potential (East Anglia TWO Offshore Cable Corridor)
(PDF, 5MB)
O East Anglia TWO Limited
-
6.2.13.46 Environmental Statement - Figure 13.46 - Other projects or activities included in the cumulative assessment and Belgian beam trawls VMS value (average 2014-2018)
(PDF, 869KB)
O East Anglia TWO Limited
-
6.2.13.48 Environmental Statement - Figure 13.48 - Other projects or activities included in the cumulative assessment and UK beam trawls VMS value (average 2013-2017)
(PDF, 922KB)
O East Anglia TWO Limited
-
6.2.14.6 Environmental Statement - Figure 14.6 - Cumulative Projects Within 100nm
(PDF, 309KB)
O East Anglia TWO Limited
-
6.2.16.1 Environmental Statement - Figure 16.1 - Palaeographic Features of Archaeological Potential (East Anglia TWO Windfarm Site)
(PDF, 690KB)
O East Anglia TWO Limited
-
6.2.14.2 Environmental Statement - Figure 14.2 - Overview of AIS and Radar Data within Shipping and Navigation Study Area Excluding Temporary tracks (14 Days Summer 2017)
(PDF, 446KB)
O East Anglia TWO Limited
-
6.2.14.4 Environmental Statement - Figure 14.4 - Overview of AIS and Radar Data within Shipping and Navigation Study Area Excluding Temporary tracks (14 Days Summer 2018)
(PDF, 428KB)
O East Anglia TWO Limited
-
6.3.11.2 Environmental Statement - Appendix 11.2 - Marine Mammal Information and Survey Report
(PDF, 11MB)
O East Anglia TWO Limited
-
6.3.11.3 Environmental Statement - Appendix 11.3 - Marine Mammal Cumulative Impact Assessment (CIA) Screening
(PDF, 2MB)
O East Anglia TWO Limited
-
6.2.17.1 Environmental Statement - Figure 17.1 - Offshore Windfarm Developments
(PDF, 3MB)
O East Anglia TWO Limited
-
6.3.10.3 Environmental Statement - Appendix 10.3 - Stationary Modelling Appendix
(PDF, 29MB)
O East Anglia TWO Limited
-
6.3.11.1 Environmental Statement - Appendix 11.1 - Marine Mammals Consultation Responses
(PDF, 481KB)
O East Anglia TWO Limited
-
6.2.13.50 Environmental Statement - Figure 13.50 - Other projects or activities included in the cumulative assessment and fishing effort 2008 by French Demersal Otter Trawlers and Pelagic Trawlers
(PDF, 881KB)
O East Anglia TWO Limited
-
6.2.9.9 Environmental Statement - Figure 9.9a-b - Epifaunal Abundance
(PDF, 3MB)
O East Anglia TWO Limited
-
6.3.12.1 Environmental Statement - Appendix 12.1 - Offshore Ornithology Consultation Responses
(PDF, 1MB)
O East Anglia TWO Limited
-
6.3.22.3 Environmental Statement - Appendix 22.3 - Extended Phase 1 Habitat Survey (Part 2 of 2)
(PDF, 14MB)
O East Anglia TWO Limited
-
6.2.14.1 Environmental Statement - Figure 14.1 - Navigational Features Overview
(PDF, 1MB)
O East Anglia TWO Limited
-
6.3.11.4 Environmental Statement - Appendix 11.4 - Underwater Noise Assessment
(PDF, 4MB)
O East Anglia TWO Limited
-
6.3.22.2 Environmental Statement - Appendix 22.2 - Onshore Ecology Cumulative Impact Assessment with the Proposed East Anglia ONE North Project
(PDF, 180KB)
O East Anglia TWO Limited
-
6.3.22.3 Environmental Statement - Appendix 22.3 - Extended Phase 1 Habitat Survey (Part 1 of 2)
(PDF, 42MB)
O East Anglia TWO Limited
-
6.2.13.47 Environmental Statement - Figure 13.47 - Other projects or activities included in the cumulative assessment and Belgian beam trawls VMS effort (average 2014-2018)
(PDF, 876KB)
O East Anglia TWO Limited
-
6.3.10.1 Environmental Statement - Appendix 10.1 - Fish and Shellfish Ecology Consultation Response
(PDF, 220KB)
O East Anglia TWO Limited
-
6.3.10.2 Environmental Statement - Appendix 10.2 - Fish and Shellfish Ecology Technical Appendix
(PDF, 7MB)
O East Anglia TWO Limited
-
6.2.13.6 Environmental Statement - Figure 13.6 - Dutch landing Values by Species
(PDF, 1MB)
O East Anglia TWO Limited
-
6.2.13.8 Environmental Statement - Figure 13.8 - Dutch VMS Effort (days) for Beam Trawls
(PDF, 780KB)
O East Anglia TWO Limited
-
6.2.14.3 Environmental Statement - Figure 14.3 - Overview of AIS and Radar Data within Shipping and Navigation Study Area Excluding Temporary tracks (14 Days Winter 2017)
(PDF, 428KB)
O East Anglia TWO Limited
-
6.3.12.2 Environmental Statement - Appendix 12.2 - Ornithology Technical Appendix
(PDF, 11MB)
O East Anglia TWO Limited
-
6.3.14.4 Environmental Statement - Appendix 14.4 - Cumulative Impact Assessment Screening
(PDF, 801KB)
O East Anglia TWO Limited
-
6.2.13.49 Environmental Statement - Figure 13.49 - Other projects or activities included in the cumulative assessment and UK beam trawl VMS effort (average 2013-2017)
(PDF, 907KB)
O East Anglia TWO Limited
-
6.2.14.5 Environmental Statement - Figure 14.5 - RYA Coastal Atlas (2016)
(PDF, 1MB)
O East Anglia TWO Limited
-
6.2.15.1 Environmental Statement - Figure 15.1 - Civil Aviation and Radar in the Vicinity of the Offshore Development Area
(PDF, 2MB)
O East Anglia TWO Limited
-
6.3.13.1 Environmental Statement - Appendix 13.1 - Commercial Fisheries Consultation Responses
(PDF, 280KB)
O East Anglia TWO Limited
-
6.2.13.52 Environmental Statement - Figure 13.52 - Other projects or activities included in the CIA and Fishing Effort in 2014 by French Demersal Otter Trawlers
(PDF, 2MB)
O East Anglia TWO Limited
-
6.2.16.2 Environmental Statement - Figure 16.2 - Palaeographic Features of Archaeological Potential (East Anglia TWO Offshore Cable Corridor)
(PDF, 1MB)
O East Anglia TWO Limited
-
6.3.14.3 Environmental Statement - Appendix 14.3 - Hazard Log
(PDF, 884KB)
O East Anglia TWO Limited
-
6.3.12.3 Environmental Statement - Appendix 12.3 - Information for the Cumulative Assessment
(PDF, 1MB)
O East Anglia TWO Limited
-
6.3.14.1 Environmental Statement - Appendix 14.1 - Shipping and Navigation Consultation Responses
(PDF, 157KB)
O East Anglia TWO Limited
-
6.3.13.2 Environmental Statement - Appendix 13.2 - Commercial Fisheries Technical Report
(PDF, 13MB)
O East Anglia TWO Limited
-
6.3.14.2 Environmental Statement - Appendix 14.2 - Navigation Risk Assessment
(PDF, 42MB)
O East Anglia TWO Limited
-
6.2.17.5 Environmental Statement - Figure 17.5 - Aggregates Licensed Areas and Potential Resource
(PDF, 3MB)
O East Anglia TWO Limited
-
6.2.18.2 Environmental Statement - Figure 18.2 - Bedrock Geology
(PDF, 6MB)
O East Anglia TWO Limited
-
6.2.18.3 Environmental Statement - Figure 18.3 - Superficial Geology
(PDF, 6MB)
O East Anglia TWO Limited
-
6.3.20.5 Environmental Statement - Appendix 20.5 - Geomorphological Baseline
(PDF, 2MB)
O East Anglia TWO Limited
-
6.2.19.6 Environmental Statement - Figure 19.6 - Road Network Considered in the Cumulative Impact assessment with Sizewell C New Nuclear Power Station Road Option
(PDF, 5MB)
O East Anglia TWO Limited
-
6.2.20.2 Environmental Statement - Figure 20.2 - Environment Agency Flood Zones
(PDF, 5MB)
O East Anglia TWO Limited
-
6.3.21.2 Environmental Statement - Appendix 21.2 - Land Use Cumulative Impact Assessment with the Proposed East Anglia ONE North Project
(PDF, 435KB)
O East Anglia TWO Limited
-
6.3.22.1 Environmental Statement - Appendix 22.1 - Onshore Ecology Consultation Responses
(PDF, 340KB)
O East Anglia TWO Limited
-
6.2.19.2 Environmental Statement - Figure 19.2 - Air Quality Management Area Monitoring Locations
(PDF, 6MB)
O East Anglia TWO Limited
-
6.2.19.4 Environmental Statement - Figure 19.4 - Sensitive Ecological Receptors
(PDF, 6MB)
O East Anglia TWO Limited
-
6.2.17.2 Environmental Statement - Figure 17.2 - Other Offshore Infrastructure
(PDF, 2MB)
O East Anglia TWO Limited
-
6.2.17.4 Environmental Statement - Figure 17.4 - Marine Disposal Activity
(PDF, 2MB)
O East Anglia TWO Limited
-
6.2.17.3 Environmental Statement - Figure 17.3 - EDF Offshore Infastructure and Management Areas
(PDF, 1MB)
O East Anglia TWO Limited
-
6.2.18.5 Environmental Statement - Figure 18.5 - Sensitive Land Uses
(PDF, 4MB)
O East Anglia TWO Limited
-
6.2.18.7 Environmental Statement - Figure 18.7 - Potential Contamination Sources
(PDF, 6MB)
O East Anglia TWO Limited
-
6.2.18.1 Environmental Statement - Figure 18.1 - Study Area
(PDF, 6MB)
O East Anglia TWO Limited
-
6.2.21.1 Environmental Statement - Figure 21.1 - Direct Impact Study Area
(PDF, 6MB)
O East Anglia TWO Limited