- The disruption and destruction entailed in an AONB with some SSSI’s is totally acceptable. 2. This disruption is not necessary as the power should be brought in at Sizewell which has the infrastructure in place and has already had its character destroyed by the power stations. 33. The social disruption is unacceptable when the power could be brought into Sizewell whichwpould have much less disruption.