Assuming the project is considered viable, the road system serving the proposed site is not fit for purpose on the basis that the movement of materials to and from the site will use mainly heavy trucks. The two village bypass of the A12 passing around Stratford St Andrew and Farnham must be completed before work starts. The use of the A1094 to access the site will not allow two trucks to pass one another due to road width. The project should provide for an adequate road width or a one way system using a circular route from the A12 at Friday Street to Leiston and then north to Theberton and Yoxford, rejoining the A12. This would require better temporary service roads across the site to connect to the B1122.