1. Section 51 advice
  2. Advice in detail

Advice to Jan Packard

Back to list

Enquiry

From
Jan Packard
Date advice given
21 October 2019
Enquiry type
Email

Dear sirs, We are writing to you as residents of Knodishall whose property and holiday accommodation business is situated contiguous to a section of the cable route/haul road and in close proximity to a proposed site compound. The proposed siting of the Friston sub-station is going to have a devasting effect on our holiday cottage business. Our guests, along with the majority of visitors to the Suffolk Coast, choose our properties for their tranquil location with unspoilt views, dark skies and ease of access. All of this will disappear with the above project and the siting of the haul road and compound within metres of our boundary. Access to our property, will at times be closed off whilst initially constructing the haul road and subsequently very difficult with the continual movement of construction traffic. The impact to routes leading to our property and the Suffolk Coast will be catastrophic. The addition of 100 HGV movements a day along the already overloaded A1094 Aldeburgh Road will be dangerous and off-putting to visitors. Relative ease of access to the Suffolk Coast is a contributing factor to the area being chosen as a destination. Given that EA1N and EA2 are not the only projects proposed for the area, in what seems to be a disjointed and inefficient energy plan, the cumulative effect on people’s lives, tourism and the environment is going to blight our beautiful Suffolk Coast for many years. The location and timing of these and inevitable subsequent projects needs to be carefully considered. We hope all involved are doing this. Yours faithfully Jan Packard and Mark Haines

Advice given

The proposed application is at the Pre-application stage of the Planning Act 2008 process. The Planning Inspectorate is unable to consider representations about the merits of any application until it is accepted for Examination. Further information about the process can be found in the link below to the National Infrastructure Planning website: https://infrastructure.planninginspectorate.gov.uk/application-process/the-process/. Should the application be submitted and accepted the ‘Registration and Relevant Representation form’ will be made available on the project page of the National Infrastructure Planning website during the Pre-examination stage. Further information about registering as an Interested Party can be found in the Planning Inspectorate’s ‘Advice Note 8.2: How to register to participate in an Examination’: https://infrastructure.planninginspectorate.gov.uk/legislation-and-advice/advice-notes/.