View examination library (PDF, 312KB) containing document reference numbers
-
3.1 - ES Appendix 11.2 – Habitats Regulation Assessment Report
(PDF, 11MB)
From WTI/EFW Holdings Ltd
-
3.1 - ES Appendix 11.3 – Ecological Baseline Surveys 2007 - 2009
(PDF, 10MB)
From WTI/EFW Holdings Ltd
-
3.1 - ES Appendix 8.1 – Human Health Baseline
(PDF, 552KB)
From WTI/EFW Holdings Ltd
-
3.1 - ES Appendix 9.1 – Desk Study Ground Conditions Preliminary Risk Assessment
(PDF, 30MB)
From WTI/EFW Holdings Ltd
-
3.1 - ES Appendix 11.7 - Marine Licence Surface Water Outfall to Swale
(PDF, 579KB)
From WTI/EFW Holdings Ltd
-
3.1 - ES Appendix 11.8 - External Lighting
(PDF, 1MB)
From WTI/EFW Holdings Ltd
-
3.1 - ES Appendix 11.5 – Ecological Mitigation Report
(PDF, 2MB)
From WTI/EFW Holdings Ltd
-
3.1 - ES Appendix 11.6 – Natural England Discretionary Advice
(PDF, 312KB)
From WTI/EFW Holdings Ltd
-
3.1 - ES Chapter 5 - Air Quality
(PDF, 9MB)
From WTI/EFW Holdings Ltd
-
3.1 - ES Appendix 5.2 – Air Quality – Stack Height Determination
(PDF, 372KB)
From WTI/EFW Holdings Ltd
-
3.1 - ES Chapter 11 - Ecology
(PDF, 12MB)
From WTI/EFW Holdings Ltd
-
3.1 - ES Appendix 6.2 - Proposed Development Carbon Assessment
(PDF, 2MB)
From WTI/EFW Holdings Ltd
-
3.1 - ES Chapter 7 - Noise and Vibration
(PDF, 19MB)
From WTI/EFW Holdings Ltd
-
3.3 - 2010 ES Volume 2 - Appendices for Chapter 9
(PDF, 65MB)
From WTI/EFW Holdings Ltd
-
3.1 - ES Appendix 5.5 – Air Quality – Traffic Impacts
(PDF, 566KB)
From WTI/EFW Holdings Ltd
-
3.1 - ES Chapter 6 - Climate Change
(PDF, 613KB)
From WTI/EFW Holdings Ltd
-
3.1 - ES Chapter 10 - Water Environment
(PDF, 724KB)
From WTI/EFW Holdings Ltd
-
3.1 - ES Appendix 10.2 – Drainage Design Philosophy
(PDF, 2MB)
From WTI/EFW Holdings Ltd
-
3.1 - ES Appendix 11.4 – Ecological Mitigation and Management Plan
(PDF, 4MB)
From WTI/EFW Holdings Ltd
-
3.1 - ES Appendix 7.2 – Proposed Development Construction Noise Model Input Data
(PDF, 106KB)
From WTI/EFW Holdings Ltd
-
3.1 - ES Appendix 7.4 - Operational Noise Model
(PDF, 102KB)
From WTI/EFW Holdings Ltd
-
4.2 - Planning Statement
(PDF, 23MB)
From WTI/EFW Holdings Ltd
-
3.1 - ES Chapter 8 - Human Health
(PDF, 812KB)
From WTI/EFW Holdings Ltd
-
3.1 - ES Chapter 9 - Ground Conditions
(PDF, 15MB)
From WTI/EFW Holdings Ltd
-
3.3 - 2010 ES - Non Technical Summary
(PDF, 7MB)
From WTI/EFW Holdings Ltd
-
4.1 - Consultation Report - Appendices 1 - 7 (Part 1)
(PDF, 45MB)
From WTI/EFW Holdings Ltd
-
5.9 - Connection and Tie-In Plan
(PDF, 395KB)
From WTI/EFW Holdings Ltd
-
3.3 - 2010 ES Volume 3 - Appendices for Chapter 10 - 11
(PDF, 28MB)
From WTI/EFW Holdings Ltd
-
4.6 - Waste Hierarchy and Fuel Availability Assessment
(PDF, 4MB)
From WTI/EFW Holdings Ltd
-
5.6 - Parameters Plan
(PDF, 1MB)
From WTI/EFW Holdings Ltd
-
6.3 - 2010 Carbon Assessment
(PDF, 2MB)
From WTI/EFW Holdings Ltd
-
6.5 - Supplementary Biodiversity Information
(PDF, 6MB)
From WTI/EFW Holdings Ltd
-
3.3 - 2010 ES Volume 4 - Appendices for Chapter 11 - 16
(PDF, 36MB)
From WTI/EFW Holdings Ltd
-
3.3 - 2010 ES - 2017 Addendum
(PDF, 4MB)
From WTI/EFW Holdings Ltd
-
5.8 - Illustrative Buildings Extents - South Elevation
(PDF, 206KB)
From WTI/EFW Holdings Ltd
-
5.8 - Illustrative Building Extents - East Elevation
(PDF, 177KB)
From WTI/EFW Holdings Ltd
-
6.9 - Employment Strategy
(PDF, 40KB)
From WTI/EFW Holdings Ltd
-
4.4 - Statement of Statutory Nuisances
(PDF, 2MB)
From WTI/EFW Holdings Ltd
-
5.13 - Water Bodies Plan
(PDF, 5MB)
From WTI/EFW Holdings Ltd
-
6.1 - 2010 Planning Supporting Statement
(PDF, 14MB)
From WTI/EFW Holdings Ltd
-
3.1 - ES Appendix 1.1 – Environment Statement Author CV’s
(PDF, 2MB)
From WTI/EFW Holdings Ltd
-
3.1 - ES Appendix 2.1 - Draft Construction Environmental Management Plan (CEMP)
(PDF, 377KB)
From WTI/EFW Holdings Ltd
-
6.7 - Flood Risk Assessment
(PDF, 13MB)
From WTI/EFW Holdings Ltd
-
2.4 - Book of Reference
(PDF, 37KB)
From WTI/EFW Holdings Ltd
-
2.6 - Funding Statement
(PDF, 704KB)
From WTI/EFW Holdings Ltd
-
3.1 - ES Appendix 4.2 – Draft Construction Traffic Management Plan
(PDF, 1MB)
From WTI/EFW Holdings Ltd
-
Figure 4.2D Proposed Building Layout - Rev L
(PDF, 1MB)
From WTI/EFW Holdings Ltd
-
2.1 - Draft Development Consent Order
(PDF, 935KB)
From WTI/EFW Holdings Ltd
-
2.2 - Explanatory Memorandum
(PDF, 849KB)
From WTI/EFW Holdings Ltd
-
3.1 - ES Appendix 3.5 - Applicant Response to S42 Consultation
(PDF, 342KB)
From WTI/EFW Holdings Ltd
-
5.11 - Nature Conservation Designations Plan
(PDF, 20MB)
From WTI/EFW Holdings Ltd
-
1.2 - Application Guide
(PDF, 1MB)
From WTI/EFW Holdings Ltd
-
3.1 - ES Appendix 3.1 - Scoping Report
(PDF, 27MB)
From WTI/EFW Holdings Ltd
-
3.1 - ES Appendix 3.3 - Response to the PINS Scoping Opinion
(PDF, 495KB)
From WTI/EFW Holdings Ltd
-
3.1 - ES Chapter 14 - Summary Tables
(PDF, 395KB)
From WTI/EFW Holdings Ltd
-
3.1 - ES Appendix 3.7 - Applicant Response to S42 Consultation
(PDF, 177KB)
From WTI/EFW Holdings Ltd
-
Figure 4.6D South West Elevation - Rev U
(PDF, 537KB)
From WTI/EFW Holdings Ltd
-
3.3 - 2010 ES Volume 1 - Appendices for Chapter 1 - 8
(PDF, 55MB)
From WTI/EFW Holdings Ltd
-
3.3 - 2010 ES - 2013 Addendum
(PDF, 190KB)
From WTI/EFW Holdings Ltd
-
Figure 4.21D Landscape Masterplan - Rev M
(PDF, 953KB)
From WTI/EFW Holdings Ltd
-
3.1 - ES Appendix 11.1 - Kemsley Ornithological Surveys
(PDF, 15MB)
From WTI/EFW Holdings Ltd
-
3.3 - 2010 ES - 2018 Addendum
(PDF, 4MB)
From WTI/EFW Holdings Ltd
-
4.1 - Consultation Report
(PDF, 2MB)
From WTI/EFW Holdings Ltd
-
Figure 4.26D Proposed Levels - Site Plan - Rev H
(PDF, 1MB)
From WTI/EFW Holdings Ltd
-
Figure 4.28D Fuel Bunker Level +20.000m and Level +36.000m - Rev E
(PDF, 2MB)
From WTI/EFW Holdings Ltd
-
3.2 - ES Non Technical Summary
(PDF, 42MB)
From WTI/EFW Holdings Ltd
-
3.3 - 2010 ES Volume 1 - Chapters 1 - 8
(PDF, 76MB)
From WTI/EFW Holdings Ltd
-
Figure 4.19D Typical Office and Staff Amenities Building (UYA) Floor Plans - Rev H
(PDF, 1MB)
From WTI/EFW Holdings Ltd
-
Figure 4.33D Overall Roof Layout Comparison Drawing - Rev H
(PDF, 1MB)
From WTI/EFW Holdings Ltd
-
Figure 4.35D Illustration 2 of 7 - Rev P
(PDF, 307KB)
From WTI/EFW Holdings Ltd
-
3.1 - ES Chapter 12 - Landscape and Visual Effects
(PDF, 10MB)
From WTI/EFW Holdings Ltd
-
3.1 - ES Chapter 13 - Archaeology and Cultural Heritage
(PDF, 5MB)
From WTI/EFW Holdings Ltd
-
4.1 - Consultation Report - Appendices 8 -20 (Part -2)
(PDF, 45MB)
From WTI/EFW Holdings Ltd
-
4.3 - Design and Access Statement
(PDF, 15MB)
From WTI/EFW Holdings Ltd
-
Figure 4.24D - Site Sections - Rev J
(PDF, 186KB)
From WTI/EFW Holdings Ltd
-
Figure 4.37D Illustration 4 of 7 - Rev Q
(PDF, 261KB)
From WTI/EFW Holdings Ltd
-
Figure 4.39D Illustration 6 of 7 - Rev O
(PDF, 282KB)
From WTI/EFW Holdings Ltd
-
1.3 - Application Form
(PDF, 2MB)
From WTI/EFW Holdings Ltd
-
3.1 - ES Chapter 2 - Site Description and Proposed Development
(PDF, 84MB)
From WTI/EFW Holdings Ltd
-
2.3 - DCO Validation Report
(PDF, 755KB)
From WTI/EFW Holdings Ltd
-
2.5 - Statement of Reasons
(PDF, 724KB)
From WTI/EFW Holdings Ltd
-
3.1 - ES Chapter 1 - Introduction
(PDF, 40MB)
From WTI/EFW Holdings Ltd
-
3.1 - ES Appendix 4.1 - Transport Assessment Part 1
(PDF, 49MB)
From WTI/EFW Holdings Ltd
-
Lighting Discharges Report
(PDF, 2MB)
From WTI/EFW Holdings Ltd
-
External Lighting Drawing
(PDF, 10MB)
From WTI/EFW Holdings Ltd
-
1.1 - Covering Letter
(PDF, 209KB)
From WTI/EFW Holdings Ltd
-
3.1 - ES Appendix 3.2 – PINS Scoping Opinion
(PDF, 4MB)
From WTI/EFW Holdings Ltd
-
3.1 - ES Appendix 3.4 - S42 Consultation Letter and S42 Responses
(PDF, 26MB)
From WTI/EFW Holdings Ltd
-
3.1 - ES Chapter 3 - Methodology
(PDF, 8MB)
From WTI/EFW Holdings Ltd
-
Figure 4.20D Proposed Gatehouse Floor Plan and Elevation - Rev L
(PDF, 579KB)
From WTI/EFW Holdings Ltd
-
Figure 4.22D Boundary Treatment - Rev R
(PDF, 827KB)
From WTI/EFW Holdings Ltd
-
Figure 4.38D Illustration 5 of 7 - Rev O
(PDF, 466KB)
From WTI/EFW Holdings Ltd
-
Figure 4.40D Illustration 7 of 7 - Rev R
(PDF, 300KB)
From WTI/EFW Holdings Ltd
-
Figure 4.29D Fuel Bunker Section A-A - Rev C
(PDF, 465KB)
From WTI/EFW Holdings Ltd
-
Figure 4.31D Tipping Hall Layout - Rev E
(PDF, 824KB)
From WTI/EFW Holdings Ltd
-
Proposed Internal Access Layout - Rev 01
(PDF, 1MB)
From WTI/EFW Holdings Ltd
-
3.1 - ES Appendix 3.6 - S42 Consultation Letter and Responses
(PDF, 8MB)
From WTI/EFW Holdings Ltd
-
3.1 - ES Chapter 4 - Traffic and Transport
(PDF, 36MB)
From WTI/EFW Holdings Ltd
-
Figure 4.25D Proposed Drainage Layout - Rev J
(PDF, 591KB)
From WTI/EFW Holdings Ltd
-
Figure 4.27D Fuel Bunker Level +2.000m - Rev D
(PDF, 1MB)
From WTI/EFW Holdings Ltd