View examination library (PDF, 308KB) containing document reference numbers
-
5.2 Environmental Statement Volume II - Appendix 7A: Transport Assessment
(PDF, 5MB)
From EDF Energy (Thermal Generation) Limited
-
3.5 Order Limits Plans Sheet 1 of 1
(PDF, 329KB)
From EDF Energy (Thermal Generation) Limited
-
3.2 Works Plans Sheet 9 of 10
(PDF, 359KB)
From EDF Energy (Thermal Generation) Limited
-
5.2 Environmental Statement Volume II - Appendix 1A: West Burton C Power Station Environmental Impact Assessment Scoping Report
(PDF, 8MB)
From EDF Energy (Thermal Generation) Limited
-
5.2 Environmental Statement Volume II - Appendix 15A: Greenhouse Gas Assessment
(PDF, 185KB)
From EDF Energy (Thermal Generation) Limited
-
5.2 Environmental Statement Volume II - Appendix 9A: Legislation and Planning Policy
(PDF, 153KB)
From EDF Energy (Thermal Generation) Limited
-
5.2 Environmental Statement Volume II - Appendix 9C: Preliminary Ecological Appraisal
(PDF, 4MB)
From EDF Energy (Thermal Generation) Limited
-
5.2 Environmental Statement Volume II - Appendix 1B: Scoping Opinion Proposed West Burton C Power Station
(PDF, 7MB)
From EDF Energy (Thermal Generation) Limited
-
3.4 Indicative Layout Plans Sheet 1 of 2
(PDF, 2MB)
From EDF Energy (Thermal Generation) Limited
-
3.4 Indicative Layout Plans Sheet 2 of 2
(PDF, 2MB)
From EDF Energy (Thermal Generation) Limited
-
3.6 Indicative Elevation Drawings Sheet 2 of 2
(PDF, 318KB)
From EDF Energy (Thermal Generation) Limited
-
5.2 Environmental Statement Volume II - Appendix 1C: Matters Addressed from Scoping Opinion
(PDF, 225KB)
From EDF Energy
-
3.6 Indicative Elevation Drawings Sheet 1 of 2
(PDF, 350KB)
From EDF Energy (Thermal Generation) Limited
-
5.2 Environmental Statement Volume II - Appendix 6A: Air Quality Technical Appendix
(PDF, 471KB)
From EDF Energy (Thermal Generation) Limited
-
3.3 Land Plans Sheet 1 of 1
(PDF, 336KB)
From EDF Energy (Thermal Generation) Limited
-
5.2 Environmental Statement Volume I - Chapter 12: Flood Risk, Hydrology and Water Resources
(PDF, 512KB)
From EDF Energy (Thermal Generation) Limited
-
5.2 Environmental Statement Volume II - Appendix 9H: Breeding Bird Survey Report Figure 9H4 (CONFIDENTIAL)
(PDF, 33KB)
From EDF Energy (Thermal Generation) Limited
-
5.2 Environmental Statement Volume II - Appendix 9D: Badger Survey Report CONFIDENTIAL
(PDF, 33KB)
From EDF Energy (Thermal Generation) Limited
-
5.2 Environmental Statement Volume I - Chapter 2: Assessment Methodology
(PDF, 167KB)
From EDF Energy (Thermal Generation) Limited
-
5.2 Environmental Statement Volume II - Appendix 9E: Great Crested Newt Survey Report
(PDF, 1MB)
From EDF Energy (Thermal Generation) Limited
-
5.2 Environmental Statement Volume I - Chapter 10: Landscape and Visual Amenity
(PDF, 474KB)
From EDF Energy (Thermal Generation) Limited
-
5.2 Environmental Statement Volume I - Chapter 1: Introduction
(PDF, 173KB)
From EDF Energy (Thermal Generation) Limited
-
5.2 Environmental Statement Volume II - Appendix 9H: Breeding Bird Survey Report
(PDF, 33KB)
From EDF Energy (Thermal Generation) Limited
-
4.1 Consultation Report
(PDF, 23MB)
From EDF Energy (Thermal Generation) Limited
-
5.2 Environmental Statement Volume I - Chapter 3: Description of the Site and its Surroundings
(PDF, 217KB)
From EDF Energy (Thermal Generation) Limited
-
5.2 Environmental Statement Volume I - Chapter 11: Ground Conditions and Hydrogeology
(PDF, 350KB)
From EDF Energy (Thermal Generation) Limited
-
6.1 Grid Connection Statement
(PDF, 250KB)
From EDF Energy (Thermal Generation) Limited
-
7.1 Planning Statement
(PDF, 2MB)
From EDF Energy (Thermal Generation) Limited
-
5.2 Environmental Statement Volume I - Chapter 14: Cultural Heritage
(PDF, 289KB)
From EDF Energy (Thermal Generation) Limited
-
5.2 Environmental Statement Volume I - Chapter 15: Sustainability, Waste and Climate Change
(PDF, 368KB)
From EDF Energy (Thermal Generation) Limited
-
5.2 Environmental Statement Volume II - Appendix 9F: Reptile Survey Report
(PDF, 946KB)
From EDF Energy (Thermal Generation) Limited
-
5.2 Environmental Statement Volume II - Appendix 9G: Bat Survey Report
(PDF, 4MB)
From EDF Energy (Thermal Generation) Limited
-
5.2 Environmental Statement Volume II - Appendix 9I: Riparian Mammal Survey Report
(PDF, 839KB)
From EDF Energy (Thermal Generation) Limited
-
4.2 Schedule of other consents and licenses
(PDF, 184KB)
From EDF Energy (Thermal Generation) Limited
-
5.2 Environmental Statement Volume I - Chapter 16: Cumulative and Combined Effects
(PDF, 381KB)
From EDF Energy (Thermal Generation) Limited
-
5.2 Environmental Statement Volume I - Chapter 13: Socio-economics
(PDF, 269KB)
From EDF Energy (Thermal Generation) Limited
-
5.2 Environmental Statement Volume I - Chapter 17: Summary of Likely Significant Residual Effects
(PDF, 173KB)
From EDF Energy (Thermal Generation) Limited
-
4.3 Habitat Regulations Assessment No Significant Effects Report
(PDF, 498KB)
From EDF Energy (Thermal Generation) Limited
-
6.2 Gas Connection Statement
(PDF, 253KB)
From EDF Energy (Thermal Generation) Limited
-
6.3 Statutory Nuisance Statement
(PDF, 380KB)
From EDF Energy (Thermal Generation) Limited
-
7.5 Landscaping and Biodiversity Management and Enhancement Plan
(PDF, 2MB)
From EDF Energy (Thermal Generation) Limited
-
5.2 Environmental Statement Volume I - Chapter 7: Traffic and Transport
(PDF, 314KB)
From EDF Energy (Thermal Generation) Limited
-
5.2 Environmental Statement Volume III - Figure 1.1 Site Location Plan
(PDF, 3MB)
From EDF Energy (Thermal Generation) Limited
-
7.3 Framework Construction Environmental Management Plan
(PDF, 2MB)
From EDF Energy (Thermal Generation) Limited
-
7.9 Outline Written Scheme of Investigation
(PDF, 4MB)
From EDF Energy (Thermal Generation) Limited
-
5.2 Environmental Statement Volume III - Figure 10.1 Public Rights of Way and Conservation Areas
(PDF, 1MB)
From EDF Energy (Thermal Generation) Limited
-
5.2 Environmental Statement Volume I - Chapter 8: Noise and Vibration
(PDF, 459KB)
From EDF Energy (Thermal Generation) Limited
-
7.4 Lighting Strategy
(PDF, 371KB)
From EDF Energy (Thermal Generation) Limited
-
5.2 Environmental Statement Volume III - Figure 10.15 - Viewpoint 10
(PDF, 270KB)
From EDF Energy (Thermal Generation) Limited
-
5.2 Environmental Statement Volume III - Figure 10.10 - Viewpoint 5
(PDF, 247KB)
From EDF Energy (Thermal Generation) Limited
-
5.2 Environmental Statement Volume I - Chapter 4: The Proposed Development
(PDF, 283KB)
From EDF Energy (Thermal Generation) Limited
-
5.2 Environmental Statement Volume III - Figure 10.12 - Viewpoint 7
(PDF, 253KB)
From EDF Energy (Thermal Generation) Limited
-
5.2 Environmental Statement Volume III - Figure 10.16 - Viewpoint 11
(PDF, 300KB)
From EDF Energy (Thermal Generation) Limited
-
7.8 Outline Drainage Strategy
(PDF, 5MB)
From EDF Energy (Thermal Generation) Limited
-
5.2 Environmental Statement Volume III - Figure 10.11 - Viewpoint 6
(PDF, 254KB)
From EDF Energy (Thermal Generation) Limited
-
5.2 Environmental Statement Volume III - Figure 10.13 - Viewpoint 8
(PDF, 262KB)
From EDF Energy (Thermal Generation) Limited
-
5.2 Environmental Statement Volume III - Figure 10.14 - Viewpoint 9
(PDF, 262KB)
From EDF Energy (Thermal Generation) Limited
-
7.2 Combined Heat and Power Assessment
(PDF, 421KB)
From EDF Energy (Thermal Generation) Limited
-
7.6 Framework Construction Traffic Management Plan
(PDF, 597KB)
From EDF Energy (Thermal Generation) Limited
-
5.2 Environmental Statement Volume I - Chapter 9: Ecology
(PDF, 403KB)
From EDF Energy (Thermal Generation) Limited
-
7.7 Framework Construction Workers' Travel Plan
(PDF, 613KB)
From EDF Energy (Thermal Generation) Limited
-
5.2 Environmental Statement Volume III - Figure 3.4 Key Environmental Receptors within 2km and 5km of the Order Limits
(PDF, 2MB)
From EDF Energy (Thermal Generation) Limited
-
5.2 Environmental Statement Volume III - Figure 3.1 The Order Limits
(PDF, 703KB)
From EDF Energy (Thermal Generation) Limited
-
5.2 Environmental Statement Volume III - Figure 3.2 Aerial Photograph with the Order Limits
(PDF, 389KB)
From EDF Energy (Thermal Generation) Limited
-
5.2 Environmental Statement Volume III - Figure 4.1b Indicative Site Layout Up to Five Smaller Gas Turbines
(PDF, 275KB)
From EDF Energy (Thermal Generation) Limited
-
5.2 Environmental Statement Volume III - Figure 10.20 - Viewpoint 15
(PDF, 244KB)
From EDF Energy (Thermal Generation) Limited
-
5.2 Environmental Statement Volume III - Figure 6.3 Maximum Predicted Annual Mean NO2 Process Contribution (Human Health Receptors)
(PDF, 452KB)
From EDF Energy (Thermal Generation) Limited
-
5.2 Environmental Statement Volume III - Figure 10.2 Bassetlaw Planning Policies
(PDF, 429KB)
From EDF Energy (Thermal Generation) Limited
-
5.2 Environmental Statement Volume I - Chapter 6: Air Quality
(PDF, 412KB)
From EDF Energy (Thermal Generation) Limited
-
5.2 Environmental Statement Volume III - Figure 10.21 Viewpoint 4 - Photomontage (Summer) Existing Planar Projection
(PDF, 963KB)
From EDF Energy (Thermal Generation) Limited
-
5.2 Environmental Statement Volume III - Figure 3.5 Flood Zones
(PDF, 813KB)
From EDF Energy (Thermal Generation) Limited
-
5.2 Environmental Statement Volume I - Chapter 5: Legislative Context and Planning Policy Framework
(PDF, 626KB)
From EDF Energy (Thermal Generation) Limited
-
5.2 Environmental Statement Volume III - Figure 10.18 - Viewpoint 13
(PDF, 554KB)
From EDF Energy (Thermal Generation) Limited
-
5.2 Environmental Statement Volume III - Figure 4.2b Indicative Elevations Up to Five Smaller Gas Turbines
(PDF, 439KB)
From EDF Energy (Thermal Generation) Limited
-
5.2 Environmental Statement Volume III - Figure 3.3 Indicative Work Areas Referred to in the ES
(PDF, 615KB)
From EDF Energy (Thermal Generation) Limited
-
5.2 Environmental Statement Volume III - Figure 4.2a Indicative Elevations Single Large Turbine
(PDF, 401KB)
From EDF Energy (Thermal Generation) Limited
-
5.2 Environmental Statement Volume III - Figure 6.2 Maximum Predicted Hourly Mean NO2 Process Contribution (Human Health Receptors)
(PDF, 440KB)
From EDF Energy (Thermal Generation) Limited
-
5.2 Environmental Statement Volume III - Figure 10.17 - Viewpoint 12
(PDF, 639KB)
From EDF Energy (Thermal Generation) Limited
-
5.2 Environmental Statement Volume III - Figure 6.1 Air Quality Study Area and Receptor Locations
(PDF, 2MB)
From EDF Energy (Thermal Generation) Limited
-
5.2 Environmental Statement Volume III - Figure 10.19 - Viewpoint 14
(PDF, 547KB)
From EDF Energy (Thermal Generation) Limited
-
5.2 Environmental Statement Volume III - Figure 6.4 Maximum Predicted Annual Mean NOx Process Contribution (Ecological Receptors)
(PDF, 428KB)
From EDF Energy (Thermal Generation) Limited
-
5.2 Environmental Statement Volume III - Figure 4.1a Indicative Site Layout Single Large Turbine
(PDF, 272KB)
From EDF Energy (Thermal Generation) Limited
-
5.2 Environmental Statement Volume III - Figure 15.1 Waste Hierarchy
(PDF, 352KB)
From EDF Energy (Thermal Generation) Limited
-
5.2 Environmental Statement Volume III - Figure 10.7 - Viewpoint 2
(PDF, 727KB)
From EDF Energy (Thermal Generation) Limited
-
5.2 Environmental Statement Volume III - Figure 10.22 Viewpoint 4 - Photomontage (Summer) Single Large Gas Turbine Planar Projection
(PDF, 961KB)
From EDF Energy (Thermal Generation) Limited
-
5.2 Environmental Statement Volume III - Figure 10.26 Viewpoint 4 - Photomontage (Winter) Existing Planar Projection
(PDF, 909KB)
From EDF Energy (Thermal Generation) Limited
-
5.2 Environmental Statement Volume III - Figure 10.25 Viewpoint 4 Wireframe (Summer) Up to Five Smaller Gas Turbines Planar Projection
(PDF, 763KB)
From EDF Energy (Thermal Generation) Limited
-
5.2 Environmental Statement Volume III - Figure 10.36 Viewpoint 12 - Photomontage (Winter) Existing Planar Projection
(PDF, 749KB)
From EDF Energy (Thermal Generation) Limited
-
5.2 Environmental Statement Volume III - Figure 10.38 Viewpoint 12 - Wireframe (Winter) Single Large Gas Turbine Planar Projection
(PDF, 592KB)
From EDF Energy (Thermal Generation) Limited
-
5.2 Environmental Statement Volume III - Figure 10.40 Viewpoint 12 - Wireframe (Winter) Up to Five Smaller Gas Turbines Planar Projection
(PDF, 879KB)
From EDF Energy (Thermal Generation) Limited
-
5.2 Environmental Statement Volume III - Figure 16.2 Short List of Development Considered for Cumulative Impact Assessment
(PDF, 1MB)
From EDF Energy (Thermal Generation) Limited
-
5.2 Environmental Statement Volume III - Figure 10.27 Viewpoint 4 - Photomontage (Winter) Single Large Gas Turbine Planar Projection
(PDF, 911KB)
From EDF Energy (Thermal Generation) Limited
-
5.2 Environmental Statement Volume III - Figure 10.37 Viewpoint 12 - Photomontage (Winter) Single Large Gas Turbine Planar Projection
(PDF, 752KB)
From EDF Energy (Thermal Generation) Limited
-
5.2 Environmental Statement Volume III - Figure 10.3 Landscape Character Areas
(PDF, 589KB)
From EDF Energy (Thermal Generation) Limited
-
5.2 Environmental Statement Volume III - Figure 10.30 Viewpoint 4 Wireframe (Winter) Up to Five Smaller Gas Turbines Planar Projection
(PDF, 723KB)
From EDF Energy (Thermal Generation) Limited
-
5.2 Environmental Statement Volume III - Figure 10.35 Viewpoint 12 0 Wireframe (Summer) Up to Five Smaller Gas Turbines Planar Projection
(PDF, 724KB)
From EDF Energy (Thermal Generation) Limited
-
5.2 Environmental Statement Volume III - Figure 10.24.Viewpoint 4 Photomontage (Summer) Up to Five Smaller Gas Turbines Planar Projection
(PDF, 968KB)
From EDF Energy (Thermal Generation) Limited
-
5.2 Environmental Statement Volume III - Figure 10.8 - Viewpoint 3
(PDF, 735KB)
From EDF Energy (Thermal Generation) Limited
-
5.2 Environmental Statement Volume III - Figure 14.1 Non-Designated Heritage Assets within 1km of the Order Limits
(PDF, 972KB)
From EDF Energy (Thermal Generation) Limited
-
5.2 Environmental Statement Volume III - Figure 10.39 Viewpoint 12 - Photomontage (Winter) Up to Five Smaller Gas Turbines Planar Projection
(PDF, 752KB)
From EDF Energy (Thermal Generation) Limited