View examination library (PDF, 445KB) containing document reference numbers
-
2.19 Battery Compound Layout
(PDF, 2MB)
From INRG SOLAR (Little Crow) Ltd
-
2.39 Proposed Temporary Diversion of Public Footpath 214
(PDF, 594KB)
From INRG SOLAR (Little Crow) Ltd
-
2.33 53ft Battery Container Elevations
(PDF, 970KB)
From INRG SOLAR (Little Crow) Ltd
-
9.4 Statement of Common Ground with North Lincolnshire Council
(PDF, 1MB)
From INRG SOLAR (Little Crow) Ltd
-
1.4 Copies of Newspaper Notices
(PDF, 4MB)
From INRG SOLAR (Little Crow) Ltd
-
2.28 NPG Control Room – General Arrangement and Elevations
(PDF, 1MB)
From INRG SOLAR (Little Crow) Ltd
-
2.24 132KV Substation Layout – General Arrangement
(PDF, 1MB)
From INRG SOLAR (Little Crow) Ltd
-
2.25 132KV Substation Layout – Elevation Section A–A - Cross-Section B-B
(PDF, 1MB)
From INRG SOLAR (Little Crow) Ltd
-
3.4 Statement of Need
(PDF, 77KB)
From INRG SOLAR (Little Crow) Ltd
-
Validation Report - 26 November 2020
(PDF, 233KB)
From INRG SOLAR (Little Crow) Ltd
-
9.9 Draft Statement of Common Ground with Public Health England
(PDF, 776KB)
From INRG SOLAR (Little Crow) Ltd
-
2.36 Alternative Location for Battery Compound – Work No 2B
(PDF, 3MB)
From INRG SOLAR (Little Crow) Ltd
-
2.31 53ft Battery Container Plan and 3D View
(PDF, 2MB)
From INRG SOLAR (Little Crow)
-
9.5 Draft Statement of Common Ground with Anglian Water
(PDF, 716KB)
From INRG SOLAR (Little Crow) Ltd
-
9.10 Draft Statement of Common Ground with Natural England
(PDF, 805KB)
From INRG SOLAR (Little Crow) Ltd
-
2.34 40ft Client Switchroom Container Elevations
(PDF, 2MB)
From INRG SOLAR (Little Crow) Ltd
-
3.1 Draft Development Consent Order
(PDF, 707KB)
From INRG SOLAR (Little Crow) Ltd
-
9.13 Unilateral Undertaking
(PDF, 16MB)
From INRG SOLAR (Little Crow) Ltd
-
9.3 Statement of Common Ground Overview
(PDF, 669KB)
From INRG SOLAR (Little Crow) Ltd
-
2.5 Designated Heritage Assets
(PDF, 2MB)
From INRG SOLAR (Little Crow) Ltd
-
2.16 Works Details - Key B3 - Sheet 6 of 7
(PDF, 2MB)
From INRG SOLAR (Little Crow) Ltd
-
2.10 Works Details - Whole Site Plan
(PDF, 5MB)
From INRG SOLAR (Little Crow) Ltd
-
2.18 Solar Farm and Battery Storage Cable Trench Plan
(PDF, 3MB)
From INRG SOLAR (Little Crow) Ltd
-
4.1 Consultation Report
(PDF, 3MB)
From INRG SOLAR (Little Crow) Ltd
-
2.20 Archaeological Exclusion Zone Sheet 1 of 2
(PDF, 2MB)
From INRG SOLAR (Little Crow) Ltd
-
3.3 Book of Reference
(PDF, 77KB)
From INRG SOLAR (Little Crow) Ltd
-
9.7 Draft Statement of Common Ground with Highways England
(PDF, 422KB)
From INRG SOLAR (Little Crow) Ltd
-
9.8 Draft Statement of Common Ground with Historic England
(PDF, 5MB)
From INRG SOLAR (Little Crow) Ltd
-
2.4 Statutory and Non-Statutory Sites of Geological Importance
(PDF, 16MB)
From INRG SOLAR (Little Crow) Ltd
-
2.29 Customer Switchroom Plan – Layout and Elevations
(PDF, 729KB)
From INRG SOLAR (Little Crow) Ltd
-
2.15 Works Details - Key B2 - Sheet 5 of 7
(PDF, 2MB)
From INRG SOLAR (Little Crow) Ltd
-
2.7 North Lincolnshire HER – Archaeological Event Data
(PDF, 2MB)
From INRG SOLAR (Little Crow) Ltd
-
2.9 Works Details Key Plan
(PDF, 3MB)
From INRG SOLAR (Little Crow) Ltd
-
1.2 Application Guide
(PDF, 863KB)
From INRG SOLAR (Little Crow) Ltd
-
2.40 Hedgerow Plan
(PDF, 9MB)
From INRG SOLAR (Little Crow) Ltd
-
Adequacy of Consultation Representation
(PDF, 87KB)
From East Riding of Yorkshire Council
-
4.3 Statement of Statutory Nuisance
(PDF, 619KB)
From INRG SOLAR (Little Crow) Ltd
-
2.38 Indicative Aerial Image of Order Limits
(PDF, 6MB)
From INRG SOLAR (Little Crow) Ltd
-
2.22 Archaeological Exclusion Zone – Whole Area Plan
(PDF, 2MB)
From INRG SOLAR (Little Crow) Ltd
-
4.5 Consents and Licences Required under other Legislation
(PDF, 657KB)
From INRG SOLAR (Little Crow) Ltd
-
2.32 Transformer and Inverter Skid Plan and Elevations
(PDF, 1MB)
From INRG SOLAR (Little Crow) Ltd
-
2.1 Land Plan Order Limits
(PDF, 724KB)
From INRG SOLAR (Little Crow) Ltd
-
9.12 Draft Statement of Common Ground with Northern Powergrid
(PDF, 763KB)
From INRG SOLAR (Little Crow) Ltd
-
9.2 Design and Access Statement
(PDF, 10MB)
From INRG SOLAR (Little Crow) Ltd
-
2.12 Works Details - Key A2 - Sheet 2 of 7
(PDF, 2MB)
From INRG SOLAR (Little Crow) Ltd
-
2.17 Works Details - Key C1 - Sheet 7 of 7
(PDF, 2MB)
From INRG SOLAR (Little Crow) Ltd
-
2.35 132kV Substation and Battery Storage Cable Trench Details
(PDF, 1MB)
From INRG SOLAR (Little Crow) Ltd
-
2.8 Works Plan
(PDF, 4MB)
From INRG SOLAR (Little Crow) Ltd
-
2.13 Works Details - Key A3 - Sheet 3 of 7
(PDF, 4MB)
From INRG SOLAR (Little Crow) Ltd
-
2.2 Environmental Designations Plan: Habitats
(PDF, 16MB)
From INRG SOLAR (Little Crow) Ltd
-
2.27 132KV Substation Layout – Site Location Plan
(PDF, 1MB)
From INRG SOLAR (Little Crow) Ltd
-
2.14 Works Details - Key B1 - Sheet 4 of 7
(PDF, 3MB)
From INRG SOLAR (Little Crow) Ltd
-
2.26 132KV Substation Layout – Proposed Site Access
(PDF, 996KB)
From INRG SOLAR (Little Crow) Ltd
-
2.11 Works Details - Key A1 - Sheet 1 of 7
(PDF, 3MB)
From INRG SOLAR (Little Crow) Ltd
-
1.3 Application Form
(PDF, 739KB)
From INRG SOLAR (Little Crow) Ltd
-
4.4 Grid Connection Statement
(PDF, 1MB)
From INRG SOLAR (Little Crow) Ltd
-
2.3 Statutory and Non-Statutory Sites of Ecological Importance
(PDF, 17MB)
From INRG SOLAR (Little Crow) Ltd
-
Section 55 Check List
(PDF, 326KB)
From INRG SOLAR (Little Crow)
-
2.23 Works Details – Section Details
(PDF, 2MB)
From INRG SOLAR (Little Crow) Ltd
-
Archaeological Exclusion Zone Sheet 2 of 2
(PDF, 2MB)
From INRG SOLAR (Little Crow) Ltd
-
7.35 Environmental Statement - Technical Appendices - Appendix 9.1 - Transport Statement
(PDF, 7MB)
From INRG SOLAR (Little Crow) Ltd
-
7.30 Environmental Statement - Technical Appendices - Appendix 8.1 - Cultural Heritage Base Study
(PDF, 49MB)
From INRG SOLAR (Little Crow) Ltd
-
7.25 Environmental Statement - Technical Appendices - Appendix 7.4 - Bat Activity Survey
(PDF, 2MB)
From INRG SOLAR (Little Crow) Ltd
-
7.20 Environmental Statement - Technical Appendices - Appendix 6.4 - Photomontage Visualisations
(PDF, 14MB)
From INRG SOLAR (Little Crow) Ltd
-
7.3 Environmental Statement - Technical Appendices - Appendix 3.1 - Flood Risk Assessment and Drainage Strategy
(PDF, 25MB)
From INRG SOLAR (Little Crow) Ltd
-
7.29 Environmental Statement - Technicla Appendices - Appendix 7.9 - Habitats Regulations Statement - No Significant Effects Report (NSER)
(PDF, 1MB)
From INRG SOLAR (Little Crow) Ltd
-
7.2 Environmental Statement - Technical Appendices - Appendix 1.2 - Natural England Scoping Consultation Response
(PDF, 696KB)
From INRG SOLAR (Little Crow) Ltd
-
7.21 Environmental Statement - Technical Appendices - Appendix 6.5 - Detailed Landscape Proposals
(PDF, 17MB)
From INRG SOLAR (Little Crow) Ltd
-
7.31 Environmental Statement - Technical Appendices - Appendix 8.2 - Geophysical Survey Report
(PDF, 38MB)
From INRG SOLAR (Little Crow) Ltd
-
6.8 Environmental Statement - Chapter 8 - Cultural Heritage
(PDF, 1MB)
From INRG SOLAR (Little Crow) Ltd
-
7.9 Environmental Statement - Technical Appendices - Appendix 4.2 - Outline Decommissioning Strategy
(PDF, 5MB)
From INRG SOLAR (Little Crow) Ltd
-
7.15 Environmental Statement - Technical Appendices - Appendix 4.8 - Arboricultural Impact Assessment
(PDF, 12MB)
From INRG SOLAR (Little Crow) Ltd
-
7.17 Environmental Statement - Technical Appendices - Appendix 6.1 - LVIA Assessment Criteria
(PDF, 792KB)
From INRG SOLAR (Little Crow) Ltd
-
7.1 Environmental Statement - Technical Appendices - Appendix 1.1 - PINS EIA Scoping Opinion
(PDF, 6MB)
From INRG SOLAR (Little Crow) Ltd
-
7.6 Environmental Statement - Technical Appendices - Appendix 3.4 - Woodland Management Plan
(PDF, 5MB)
From INRG SOLAR (Little Crow) Ltd
-
7.27 Environmental Statement - Technical Appendices - Appendix 7.7 - Outline Construction Environmental Management Plan for Biodiversity
(PDF, 3MB)
From INRG SOLAR (Little Crow) Ltd
-
5.1 Environmental Statement - Non-Technical Summary
(PDF, 4MB)
From INRG SOLAR (Little Crow) Ltd
-
6.10 Environmental Statement - Chapter 10 - Agricultural Circumstances
(PDF, 5MB)
From INRG SOLAR (Little Crow) Ltd
-
7.22 Environmental Statement - Technical Appendices - Appendix 7.1 - Extended Phase 1, Arable Plants, Great Crested Newts & Water Vole
(PDF, 7MB)
From INRG SOLAR (Little Crow) Ltd
-
7.26 Environmental Statement - Technical Appendices - Appendix 7.6 - Great Crested Newt Risk Avoidance Method Statement
(PDF, 1MB)
From INRG SOLAR (Little Crow) Ltd
-
6.0 Environmental Statement - Contents
(PDF, 611KB)
From INRG SOLAR (Little Crow) Ltd
-
7.32 Environmental Statement - Technical Appendices - Appendix 8.3 - Archaeological Watching Brief
(PDF, 5MB)
From INRG SOLAR (Little Crow) Ltd
-
6.1 Environmental Statement - Chapter 1 - Introduction
(PDF, 3MB)
From INRG SOLAR (Little Crow) Ltd
-
6.5 Environmental Statement - Chapter 5 - Legislation, Climate Change, Energy Planning Policy and Guidance
(PDF, 814KB)
From INRG SOLAR (Little Crow) Ltd
-
7.10 Environmental Statement - Technical Appendices - Appendix 4.3 - Grid Network Constraints Report
(PDF, 938KB)
From INRG SOLAR (Little Crow) Ltd
-
6.9 Environmental Statement - Chapter 9 - Transport and Access
(PDF, 1MB)
From INRG SOLAR (Little Crow) Ltd
-
7.0 Environmental Statement - Technical Appendices - Contents
(PDF, 719KB)
From INRG SOLAR (Little Crow) Ltd
-
7.4 Environmental Statement: Technical Appendices – Appendix 3.2 – Phase 1 Ground Conditions Desk Study
(PDF, 46MB)
From INRG SOLAR (Little Crow) Ltd
-
7.7 Environmental Statement - Technical Appendices - Appendix 3.5 - Review of Potentially Extractable Minerals
(PDF, 13MB)
From INRG SOLAR (Little Crow) Ltd
-
7.16 Environmental Statement - Technical Appendices - Appendix 4.9 - Noise Impact Assessment
(PDF, 3MB)
From INRG SOLAR (Little Crow) Ltd
-
8.2 - Environmental Statement - CONFIDENTIAL report - Confidential Works Details - Whole Site Plan
(PDF, 41KB)
From INRG SOLAR (Little Crow) Ltd
-
7.18 Environmental Statement - Technical Appendices - Appendix 6.2 - Assessment Viewpoint Photographs
(PDF, 17MB)
From INRG SOLAR (Little Crow) Ltd
-
6.7 Environmental Statement - Chapter 7 - Ecology and Nature Conservation
(PDF, 5MB)
From INRG SOLAR (Little Crow) Ltd
-
6.4 Environmental Statement - Chapter 4 - Development Proposal
(PDF, 816KB)
From INRG SOLAR (Little Crow) Ltd
-
7.23 Environmental Statement - Technical Appendices - Appendix 7.2 - Wintering Birds Survey
(PDF, 2MB)
From INRG SOLAR (Little Crow) Ltd
-
7.24 Environmental Statement - Technical Appendices - Appendix 7.3 - Breeding Birds Survey
(PDF, 3MB)
From INRG SOLAR (Little Crow) Ltd
-
7.34 Environmental Statement - Technical Appendices - Appendix 8.5 - Archaeological Evaluation
(PDF, 32MB)
From INRG SOLAR (Little Crow) Ltd
-
7.33 Environmental Statement - Technical Appendices - Appendix 8.4 - Archaeological Fieldwalking Survey
(PDF, 11MB)
From INRG SOLAR (Little Crow) Ltd
-
5.2 Environmental Statement - Glossary and Abbreviations
(PDF, 748KB)
From INRG SOLAR (Little Crow) Ltd
-
7.14 Environmental Statement - Technical Appendices - Appendix 4.7 - Outline Battery Safety Management Plan
(PDF, 4MB)
From INRG SOLAR (Little Crow) Ltd