View examination library (PDF, 1MB) containing document reference numbers
-
Action Points arising from Compulsory Acquisition Hearing 1 - 11 May 2022
(PDF, 97KB)
From CAH1 Action Points
-
Preliminary Meeting note
(PDF, 121KB)
-
Procedural Deadline Submission
(PDF, 166KB)
From BDB PITMANS on behalf of South Tees Development Corporation
-
Procedural Deadline Submission
(PDF, 192KB)
From Andrew Boswell
-
Procedural Deadline Submission
(PDF, 220KB)
From Net Zero Teesside Power Limited & Net Zero North Sea Storage Ltd
-
Procedural Deadline Submission
(PDF, 153KB)
From Eversheds Sutherland on behalf of EDF
-
Procedural Deadline Submission
(PDF, 198KB)
From Client Earth
-
Procedural Deadline Submission
(PDF, 89KB)
From PD Teesport Limited
-
Additional Submission - Accepted at the discretion of the Examining Authority
(PDF, 102KB)
From Exolum Seal Sands Ltd
-
Submission in lieu of attendance at Compulsory Acquisition Hearing 1
(PDF, 954KB)
From NPL Waste Management Limited
-
Examining Authority's response to the Applicants' request for proposed changes
(PDF, 176KB)
-
Notice of Issue Specific Hearing 1 into the scope of the Proposed Development on 10 May 2022 at 2pm; Issue Specific Hearing 2 into the draft DCO on 11 May 2022 at 10am and; Compulsory Acquisition Hearing 1 on 11 May 2022 at 2pm
(PDF, 191KB)
From Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd
-
Accompanied Site Inspection Itinerary - 12 May 2022
(PDF, 411KB)
-
Additional Submission accepted at the discretion of the ExA – 6.3.41 Rev 2 ES Addendum Vol II Figure 10-15 Discharges and Incidents
(PDF, 2MB)
From Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd
-
Additional Submission accepted at the discretion of the ExA – 6.3.12 Rev 2 ES Addendum Vol II Figure 7-1 Local Plan Areas
(PDF, 4MB)
From Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd
-
Additional Submission accepted at the discretion of the ExA – 6.3.122 Rev 2 ES Addendum Vol II Figure 18-2 Non-designated Heritage Assets in the 1km Study Area
(PDF, 2MB)
From Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd
-
Additional Submission accepted at the discretion of the ExA – 6.3.59 Rev 2 ES Addendum Vol II Figure 14-1 Benthic Survey Study Area and Sampling Locations
(PDF, 2MB)
From Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd
-
Additional Submission accepted at the discretion of the ExA – 6.3.1 Rev 2 ES Addendum Vol II Figure 1-1 Site Location Plan
(PDF, 3MB)
From Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd
-
Additional Submission accepted at the discretion of the ExA – 6.3.24 Rev 3 ES Addendum Vol II Figure 9-3 Ecological Designations
(PDF, 3MB)
From Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd
-
Additional Submission accepted at the discretion of the ExA – 6.3.48 Rev 2 ES Addendum Vol II Figure 10-22 Redcar and Cleveland Local Plan Areas
(PDF, 5MB)
From Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd
-
Additional Submission accepted at the discretion of the ExA – 6.3.67 Rev 2 ES Addendum Vol II Figure 17-1 Landscape Context
(PDF, 3MB)
From Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd
-
Additional Submission accepted at the discretion of the ExA – 6.3.52 Rev 3 ES Addendum Vol II Figure 11-1 Noise Sensitive Receptors
(PDF, 5MB)
From Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd
-
Additional Submission accepted at the discretion of the ExA – 6.3.65 Rev 2 ES Addendum Vol II Figure 16-2 HGV Routes to and from the Site
(PDF, 3MB)
From Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd
-
Additional Submission accepted at the discretion of the ExA – 6.3.4 Rev 2 ES Addendum Vol II Figure 3-3 Residential Receptors within 2km
(PDF, 2MB)
From Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd
-
Additional Submission accepted at the discretion of the ExA – 7.8.2 ES Addendum Vol II Cover and Contents
(PDF, 261KB)
From Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd
-
Additional Submission accepted at the discretion of the ExA – 6.3.42 Rev 2 ES Addendum Vol II Figure 10-16 Flood Risk
(PDF, 2MB)
From Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd
-
Additional Submission accepted at the discretion of the ExA – 6.3.55 Rev 3 ES Addendum Vol II Figure 11-4a CO2 Export Pipeline Construction
(PDF, 5MB)
From Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd
-
Additional Submission accepted at the discretion of the ExA – 6.3.29 Rev 2 ES Addendum Vol II Figure 10-3 Bedrock Geology
(PDF, 2MB)
From Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd
-
Additional Submission accepted at the discretion of the ExA – 6.3.22 Rev 2 ES Addendum Vol II Figure 9-1 Surface Water Features and Attributes
(PDF, 3MB)
From Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd
-
Additional Submission accepted at the discretion of the ExA – 6.3.37 Rev 2 ES Addendum Vol II Figure 10-11 Contaminated Land - Line
(PDF, 2MB)
From Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd
-
Additional Submission accepted at the discretion of the ExA – 6.3.30 Rev 2 ES Addendum Vol II Figure 10-4 BGS Boreholes
(PDF, 2MB)
From Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd
-
Additional Submission accepted at the discretion of the ExA – 7.6 - Consultation Statement Proposed Changes - Apr 2022
(PDF, 88MB)
From Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd
-
Additional Submission accepted at the discretion of the ExA – 6.3.69 Rev 2 ES Addendum Vol II Figure 17-3 Landscape Character Plan
(PDF, 3MB)
From Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd
-
Additional Submission accepted at the discretion of the ExA – 6.3.38 Rev 2 ES Addendum Vol II Figure 10-12 Contaminated Land - Polygon
(PDF, 2MB)
From Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd
-
Additional Submission accepted at the discretion of the ExA – 6.3.27 Rev 2 ES Addendum Vol II Figure 10-1 Artificial Geology
(PDF, 2MB)
From Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd
-
Additional Submission accepted at the discretion of the ExA – 6.3.9 Rev 2 ES Addendum Vol II Figure 5-2 Indicative Pipeline Routings
(PDF, 2MB)
From Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd
-
Additional Submission accepted at the discretion of the ExA – 6.3.50 Rev 2 ES Addendum Vol II Figure 10-24 Agricultural Land Classification
(PDF, 4MB)
From Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd
-
Additional Submission accepted at the discretion of the ExA – 6.3.31 Rev 2 ES Addendum Vol II Figure 10-5 Quarrying and Landfill
(PDF, 2MB)
From Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd
-
Additional Submission accepted at the discretion of the ExA – 6.3.25 Rev 2 ES Addendum Vol II Figure 9-4 Environment Agency Fluvial Flood Zones
(PDF, 3MB)
From Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd
-
Additional Submission accepted at the discretion of the ExA – 6.3.2 Rev 2 ES Addendum Vol II Figure 3-1 Site Boundary Plan
(PDF, 2MB)
From Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd
-
Additional Submission accepted at the discretion of the ExA – 6.3.6 Rev 2 ES Addendum Vol II Figure 4-1 Indicative PCC Site Layout
(PDF, 341KB)
From Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd
-
Additional Submission accepted at the discretion of the ExA – 6.3.125 Rev 2 ES Addendum Vol II Figure 22-1 HSE Consultation Zones
(PDF, 2MB)
From Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd
-
Additional Submission accepted at the discretion of the ExA – 6.3.126 Rev 2 ES Addendum Vol II Figure 24-1 Zones of Influence for Cumulative Effects Assessment
(PDF, 6MB)
From Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd
-
Additional Submission accepted at the discretion of the ExA – 7.7 - Environmental Statement Addendum - Non-Technical Summary - Apr 2022
(PDF, 252KB)
From Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd
-
Additional Submission accepted at the discretion of the ExA – 6.3.51 Rev 2 ES Addendum Vol II Figure 10-25 BGS Buried Valleys
(PDF, 2MB)
From Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd
-
Additional Submission accepted at the discretion of the ExA – 6.3.34 Rev 2 ES Addendum Vol II Figure 10-8 Infilled Land - Water
(PDF, 2MB)
From Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd
-
Additional Submission accepted at the discretion of the ExA – 6.3.23 Rev 2 ES Addendum Vol II Figure 9-2 Groundwater Features and their Attributes
(PDF, 2MB)
From Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd
-
Additional Submission accepted at the discretion of the ExA – 6.3.20 Rev 2 ES Addendum Vol II Figure 8-8 Maximum 24 Hour Mean NOx Process Contribution
(PDF, 2MB)
From Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd
-
Additional Submission accepted at the discretion of the ExA – 6.3.17 Rev 2 ES Addendum Vol II Figure 8-5 Annual Mean NO2 Process Contribution
(PDF, 1MB)
From Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd
-
Additional Submission accepted at the discretion of the ExA – 6.3.124 Rev 2 ES Addendum Vol II Figure 19-1 Marine Heritage Assets in the 1km Study Area
(PDF, 1MB)
From Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd
-
Additional Submission accepted at the discretion of the ExA – 6.3.128 Rev 2 ES Addendum Vol II Figure 24-3 Short List of Other Developments
(PDF, 3MB)
From Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd
-
Additional Submission accepted at the discretion of the ExA – 6.3.15 Rev 2 ES Addendum Vol II Figure 8-3 Air Quality Study Area Construction
(PDF, 4MB)
From Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd
-
Additional Submission accepted at the discretion of the ExA – 6.3.7 Rev 2 ES Addendum Vol II Figure 4-2 Indicative Landscaping and Biodiversity
(PDF, 306KB)
From Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd
-
Additional Submission accepted at the discretion of the ExA – 6.3.62 Rev 3 ES Addendum Vol II Figure 15-3 Statutory Designated Sites
(PDF, 2MB)
From Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd
-
Additional Submission accepted at the discretion of the ExA – 6.3.32 Rev 2 ES Addendum Vol II Figure 10-6 Waste Management
(PDF, 2MB)
From Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd
-
Additional Submission accepted at the discretion of the ExA – 6.3.49 Rev 2 ES Addendum Vol II Figure 10-23 Historical Features
(PDF, 9MB)
From Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd
-
Additional Submission accepted at the discretion of the ExA – 6.3.58 Rev 2 ES Addendum Vol II Figure 13-1 Surface Waterbodies within 200m
(PDF, 3MB)
From Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd
-
Additional Submission accepted at the discretion of the ExA – 6.3.121 Rev 2 ES Addendum Vol II Figure 18-1 Designated Heritage Assets in the 5km Study Area
(PDF, 3MB)
From Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd
-
Additional Submission accepted at the discretion of the ExA – 6.3.35 Rev 2 ES Addendum Vol II Figure 10-9 Hazardous
(PDF, 2MB)
From Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd
-
Additional Submission accepted at the discretion of the ExA – 6.3.3 Rev 3 ES Addendum Vol II Figure 3-2 Development Areas
(PDF, 10MB)
From Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd
-
Additional Submission accepted at the discretion of the ExA – 6.3.127 Rev 2 ES Addendum Vol II Figure 24-2 Long List of Other Developments
(PDF, 3MB)
From Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd
-
Additional Submission accepted at the discretion of the ExA – 6.3.57 Rev 3 ES Addendum Vol II Figure 11-5 PCC Site Operational Noise Levels
(PDF, 1MB)
From Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd
-
Additional Submission accepted at the discretion of the ExA – 6.3.71 Rev 2 ES Addendum Vol II Figure 17-5 Topography
(PDF, 2MB)
From Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd
-
Additional Submission accepted at the discretion of the ExA – 6.3.21 Rev 2 ES Addendum Vol II Figure 8-9 Nutrient Nitrogen Deposition
(PDF, 2MB)
From Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd
-
Additional Submission accepted at the discretion of the ExA – 6.3.19 Rev 2 ES Addendum Vol II Figure 8-7 Annual Mean NOx Process Contribution
(PDF, 2MB)
From Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd
-
Additional Submission accepted at the discretion of the ExA – 6.3.63 Rev 2 ES Addendum Vol II Figure 15-4 Non-Statutory Designated Sites
(PDF, 2MB)
From Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd
-
Additional Submission accepted at the discretion of the ExA – 4.1 Rev 2 - Site Location Plan
(PDF, 6MB)
From Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd
-
Additional Submission accepted at the discretion of the ExA – 4.6.4 Rev 1 - PCC Site Elevations
(PDF, 3MB)
From Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd
-
Additional Submission accepted at the discretion of the ExA – 6.3.64 Rev 2 ES Addendum Vol II Figure 16-1 Traffic Study Area
(PDF, 3MB)
From Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd
-
Additional Submission accepted at the discretion of the ExA – 6.3.13 Rev 2 ES Addendum Vol II Figure 8-1 Air Quality Study Area - Human Health Receptors and Monitoring
(PDF, 3MB)
From Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd
-
Additional Submission accepted at the discretion of the ExA – 6.3.26 Rev 2 ES Addendum Vol II Figure 9-5 Flood Risk from Surface Water
(PDF, 3MB)
From Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd
-
Additional Submission accepted at the discretion of the ExA – 6.3.40 Rev 2 ES Addendum Vol II Figure 10-14 Sensitive Land Use
(PDF, 2MB)
From Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd
-
Additional Submission accepted at the discretion of the ExA – 6.3.5 Rev 3 ES Addendum Vol II Figure 3-4 Environmental Receptors within 2km
(PDF, 3MB)
From Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd
-
Additional Submission accepted at the discretion of the ExA – 6.3.70 Rev 2 ES Addendum Vol II Figure 17-4 Zone of Theoretical Visibility and Potential Viewpoint Locations
(PDF, 3MB)
From Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd
-
Additional Submission accepted at the discretion of the ExA – 6.3.56 Rev 3 ES Addendum Vol II Figure 11-4b CO2 Export Pipeline Construction (with Screening)
(PDF, 5MB)
From Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd
-
Additional Submission accepted at the discretion of the ExA – 6.3.45 Rev 2 ES Addendum Vol II Figure 10-19 Flood Susceptibility
(PDF, 2MB)
From Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd
-
Additional Submission accepted at the discretion of the ExA – 6.3.72 Rev 2 ES Addendum Vol II Figure 17-6 Zone of Theoretical Visibility and Representative Viewpoint Locations
(PDF, 3MB)
From Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd
-
Additional Submission accepted at the discretion of the ExA – 6.3.16 Rev 2 ES Addendum Vol II Figure 8-4 Air Quality Model Visualisation
(PDF, 1MB)
From Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd
-
Additional Submission accepted at the discretion of the ExA – 6.3.14 Rev 2 ES Addendum Vol II Figure 8-2 Air Quality Study Area Ecological Receptors
(PDF, 3MB)
From Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd
-
Additional Submission accepted at the discretion of the ExA – 5.13 Habitat Regulations Assessment Report Rev 3 Tracked
(PDF, 1MB)
From Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd
-
Additional Submission accepted at the discretion of the ExA – 5.6 Gas Connection Statement Changes Rev 2 2022-04-26 Final
(PDF, 2MB)
From Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd
-
Additional Submission accepted at the discretion of the ExA – 4.11.2 Rev 2 - CO2 Gathering Network Plans Sheet 2
(PDF, 2MB)
From Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd
-
Additional Submission accepted at the discretion of the ExA – 3.2 - Statement of Reasons - Apr 2022
(PDF, 905KB)
From Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd
-
Additional Submission accepted at the discretion of the ExA – 6.3.44 Rev 2 ES Addendum Vol II Figure 10-18 Superficial Aquifer
(PDF, 2MB)
From Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd
-
Additional Submission accepted at the discretion of the ExA – 6.3.53 Rev 3 ES Addendum Vol II Figure 11-2 PCC Site Piling Construction Phase
(PDF, 2MB)
From Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd
-
Additional Submission accepted at the discretion of the ExA – 6.3.68 Rev 2 ES Addendum Vol II Figure 17-2 Public Rights of Way within 2km
(PDF, 3MB)
From Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd
-
Additional Submission accepted at the discretion of the ExA – 7.5 - Letter Requesting Proposed Changes - Apr 2022
(PDF, 707KB)
From Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd
-
Additional Submission accepted at the discretion of the ExA – 6.3.28 Rev 2 ES Addendum Vol II Figure 10-2 Superficial Geology
(PDF, 2MB)
From Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd
-
Additional Submission accepted at the discretion of the ExA – 6.3.8 Rev 2 ES Addendum Vol II Figure 5-1 Access and Laydown
(PDF, 2MB)
From Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd
-
Additional Submission accepted at the discretion of the ExA – 6.3.11 Rev 2 ES Addendum Vol II Figure 6-1 Scheme and Site Boundary Changes since PEI Report
(PDF, 2MB)
From Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd
-
Additional Submission accepted at the discretion of the ExA – 6.3.10 Rev 2 ES Addendum Vol II Figure 5-3 Indicative Electrical Connection Routings
(PDF, 1MB)
From Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd
-
Additional Submission accepted at the discretion of the ExA – 6.3.46 Rev 2 ES Addendum Vol II Figure 10-20 Risk of Flooding from Rivers and Seas
(PDF, 2MB)
From Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd
-
Additional Submission accepted at the discretion of the ExA – 6.3.129 ES Addendum Vol II Figure 6-2 Proposed Development Changes
(PDF, 2MB)
From Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd
-
Additional Submission accepted at the discretion of the ExA – 4.4 Rev 2 - Works Plans Parts 1 - 2
(PDF, 62MB)
From Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd
-
Additional Submission accepted at the discretion of the ExA – 4.11.7 Rev 2 - CO2 Gathering Network Plans Sheet 7
(PDF, 2MB)
From Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd
-
Additional Submission accepted at the discretion of the ExA – 5.6 Gas Connection Statement Changes Rev 2 Final 2022-04-26 Tracked Changes
(PDF, 450KB)
From Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd
-
Additional Submission accepted at the discretion of the ExA – 4.9.1 Rev 1 - Water Connection Plan
(PDF, 4MB)
From Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd
-
Additional Submission accepted at the discretion of the ExA – 4.8.3 Rev 2 - Electrical Connection Plans Sheet 3
(PDF, 1MB)
From Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd
-
Additional Submission accepted at the discretion of the ExA – 4.7.6 Rev 3 - Gas Connection and AGI Plans Sheet 6
(PDF, 653KB)
From Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd
-
Additional Submission accepted at the discretion of the ExA – 6.3.61 Rev 2 ES Addendum Vol II Figure 15-2 Survey Areas
(PDF, 2MB)
From Net Zero Teesside Power Ltd & Net Zero North Sea Storage Ltd