Representation by Emma Head
- Date submitted
- 4 March 2022
- Submitted by
- Members of the public/businesses
That the size of the site is too large and consumes farmland The amount of traffic required to come through the villages during the lengthy construction stage would be detrimental to all residents, quality of roads (evidenced from the bridge repairs work on a142 junction where road surface quality is horrendous), major disruptions to traffic, added pollution from estimated hundreds/thousands extra vehicles each day That there are viable alternatives that do not use farmland if on smaller scale eg Turners roof top