11 December 2024
On 10 December 2024, the Secretary of State issued a Correction Order (PDF, 342KB) and Correction Notice (PDF, 252KB) to make corrections to the Sheringham and Dudgeon Extension Projects Order 2024, to come into force on the 11 December 2024.
4 September 2024
Representations received in response to the application for a non-material change to the Made Sheringham and Dudgeon Extension Projects Development Consent Order have been published.
25 July 2024
An application for a non-material change to the made Sheringham and Dudgeon Extension Projects Development Consent Order has been made by the Equinor.
The deadline for receipt of representations is 23:59 on 02 September 2024.
If you wish to make a representation, this should be emailed to sadep@planninginspectorate.gov.uk or posted to:
National Infrastructure, The Planning Inspectorate, Temple Quay House, 2 The Square, Bristol BS1 6PN
17 July 2024
The Secretary of State for Energy Security and Net Zero has issued a letter (PDF, 180KB) confirming those parties that the Applicant should consult regarding a proposed non-material change application relating to Sheringham and Dudgeon Extension Projects (PDF, 510KB) Made Order.
18 April 2024
The Secretary of State has granted development consent for this application.
For further information please refer to the following decision documentation:
17 April 2024
The Secretary of State has granted development consent for this application.
For further information please refer to the following decision documentation:
Planning Inspectorate's Notification of Decision Letter
Secretary of State's Decision Letter
Development Consent Order as made
Examining Authority's Recommendation Report
Regulation 31 Notice
Habitats Regulations Assessment
All of the above documents can be accessed on the documents page of the Sheringham and Dudgeon Extension Project webpage
8 March 2024
The Planning Inspectorate's webpage for the Sheringham and Dudgeon Extension Project has been moved over to the new National Infrastructure Planning website. This means that the information currently on the 'Overview’ tab' is presented in a different way and the way you access documents will be different.
Please contact the Case Team if you have any queries about the change: sadep@planninginspectorate.gov.uk
7 March 2024
Please contact the Case Team if you have any queries about the change: sadep@planninginspectorate.gov.uk
1 March 2024
Please contact the Case Team if you have any queries about the change: sadep@planninginspectorate.gov.uk
22 February 2024
23 January 2024
The deadline for response is 23:59 on 20 February 2024.
9 January 2024
21 December 2023
22 November 2023
The deadline for response is 23:59 on 20 December 2023.
17 October 2023
20 July 2023
The Examining Authority's Notice of Completion of the Examination (PDF, 132KB) has been published.
The Deadline 8 submissions have been published.
18 July 2023
The Examining Authority's Notice of Completion of the Examination (PDF, 132KB) has been published.
The Deadline 8 submissions will be published shortly.
18 July 2023
17 July 2023
The Examination will close today at 23:59.
17 July 2023
The Examination will close today at 23:59.
13 July 2023
The Deadline 7 documents have been published.
13 July 2023
The Deadline 7 documents have been published.
12 July 2023
The Deadline 7 documents will be published shortly, we apologise for the delay.
29 June 2023
27 June 2023
A Note of the Examining Authority's Unaccompanied Site Inspection Tuesday 20 June 2023 (PDF, 149KB) has been published.
Perenco's Deadline 6 submission: Indicative Economic Assessment (PDF, 102KB) has been published. The delay was due to an error, which has now been rectified.
The Examination Library has (PDF, 933 KB) been updated.
22 June 2023
The Examining Authority has accepted National Trust’s Position Statement In lieu of Attendance at the ISH7 as an Additional Submission
The Compulsory Acquisition Hearing 2 (CAH2) is taking place at 10am on Thursday 22 June 2023. If you wish to observe the hearings, please access the livestream link: https://cvslivestream.co.uk/sadep/
21 June 2023
The Issue Specific Hearing 7 (ISH7) on Shipping and Navigation and any other relevant offshore and onshore issues, will take place on Wednesday 21 June at 10:00 am. The Compulsory Acquisition Hearing 2 (CAH2) will take place on Thursday 22 June 2023 10:00 am. Joining Instructions have been issued to all registered attendees.
If you wish to observe the hearings, please access the livestream link: https://cvslivestream.co.uk/sadep/
Please contact the Case Team at sadep@planninginspectorate.gov.uk or on 0303 444 5000 for any assistance.
16 June 2023
The Examining Authority has accepted North Norfolk District Council’s Position Statement In lieu of Attendance at the ISH7 as an Additional Submission
The Deadline 5 documents have been published.
Please note that following receipt of the Deadline 5 submissions, the Agenda for the Issue Specific Hearing 7 on Wednesday 21 June 2023 (PDF, 189KB) has been amended and re-published.
The Agenda for the Compulsory Acquisition Hearing 2 (CAH2) on Thursday 22 June 2023 (PDF, 160KB) has been published.
As per the ExA’s procedural decisions in the letters dated 23 May [PD-016] (PDF, 151KB) and 30 May 2023 [PD-019] (PDF, 212KB), the ExA has requested notifications from additional Affected Persons (AP) and additional Interested Parties (IP), arising from the Applicant’s change request [AS-045 to AS-065] (PDF, 811KB) , if they wish to be heard at an Open Floor Hearing (OFH3). While the Rule 13 notification issued on 23 May 2023 [PD-016] (PDF, 151KB) provisionally sets the date and time for a further Open Floor Hearing (OFH3) (if required) on 21 June 2023, this will only be held if the ExA receives requests from additional APs and additional IPs. As the deadline for receiving requests from additional APs and IPs for the OFH3 is Deadline 6, Tuesday 20 June 2023, the ExA will confirm or cancel the OFH3 on 21 June 2023 as early as possible. Notification will be published here on Wednesday 21 June 2023, alongside an agenda if required.
14 June 2023
As per the ExA's procedural decisions in the letters dated 23 May [PD-016] (PDF, 151KB) and 30 May 2023 [PD-019] (PDF, 212KB), the ExA has requested notifications from additional Affected Persons (AP) and additional Interested Parties (IP), arising from the Applicant's change request [AS-045 to AS-065] (PDF, 811KB) , if they wish to be heard at an Open Floor Hearing (OFH3). While the Rule 13 notification issued on 23 May 2023 [PD-016] (PDF, 151KB) provisionally sets the date and time for a further Open Floor Hearing (OFH3) (if required) on 21 June 2023, this will only be held if the ExA receives requests from additional APs and additional IPs. As the deadline for receiving requests from additional APs and IPs for the OFH3 is Deadline 6, Tuesday 20 June 2023, the ExA will confirm or cancel the OFH3 on 21 June 2023 as early as possible. Notification will be published here on Wednesday 21 June 2023, alongside an agenda if required.
31 May 2023
The Examining Authority has issued a letter notifying of changes to the Examination Timetable (PDF 212KB)
The Examining Authority's Third Written Questions (PDF 455KB) and Proposed Changes to the DCO (PDF 231 KB) have been published.
The Rule 13 Notice of Hearings 21 and 22 June 2023 (PDF 151 KB) has been published.
26 May 2023
The Rule 13 Notice of Hearings 21 and 22 June 2023 (PDF, 151KB) has been published.
Following the Examining Authority’s (ExA) decision to accept the Applicant’s Change Request of 11 April, comments are now invited on the Applicant’s proposed provision for the compulsory acquisition of additional land by 23:59 on Friday 26 May 2023.
The Applicant published newspaper notices on 20 April 2023, inviting relevant representations to be submitted to the Planning Inspectorate regarding the proposed changes to the Application. Please note that the deadline for the receipt of these representations is 23:59 on Friday 26 May 2023 and not midday on Friday 26 May as stated in the newspaper notices.
Any comments must be made on the Registration and Relevant Representation Form and must relate to the Applicant’s proposed provision only. Any submissions that are not in relation to this, or are not on the prescribed form, will not be seen by the ExA and will be disregarded. Comments submitted after the deadline will also be disregarded.
Please note that the Procedural Decision issued on 17 April 2023 relating to the Applicant’s Change Request of 11 April 2023 (PDF, 176KB) has been edited to amend the date of receipt by the Examining Authority of the Certificates of Compliance’.
23 May 2023
Following the Examining Authority’s (ExA) decision to accept the Applicant’s Change Request of 11 April, comments are now invited on the Applicant’s proposed provision for the compulsory acquisition of additional land by 23:59 on Friday 26 May 2023.
The Applicant published newspaper notices on 20 April 2023, inviting relevant representations to be submitted to the Planning Inspectorate regarding the proposed changes to the Application. Please note that the deadline for the receipt of these representations is 23:59 on Friday 26 May 2023 and not midday on Friday 26 May as stated in the newspaper notices.
Any comments must be made on the Registration and Relevant Representation Form and must relate to the Applicant’s proposed provision only. Any submissions that are not in relation to this, or are not on the prescribed form, will not be seen by the ExA and will be disregarded. Comments submitted after the deadline will also be disregarded.
Please note that the Procedural Decision issued on 17 April 2023 relating to the Applicant’s Change Request of 11 April 2023 (PDF, 176KB) has been edited to amend the date of receipt by the Examining Authority of the Certificates of Compliance.
17 May 2023
Following the Examining Authority’s (ExA) decision to accept the Applicant’s Change Request of 11 April, comments are now invited on the Applicant’s proposed provision for the compulsory acquisition of additional land by 23:59 on Friday 26 May 2023.
The Applicant published newspaper notices on 20 April 2023, inviting relevant representations to be submitted to the Planning Inspectorate regarding the proposed changes to the Application. Please note that the deadline for the receipt of these representations is 23:59 on Friday 26 May 2023 and not midday on Friday 26 May as stated in the newspaper notices.
Any comments must be made on the Registration and Relevant Representation Form and must relate to the Applicant’s proposed provision only. Any submissions that are not in relation to this, or are not on the prescribed form, will not be seen by the ExA and will be disregarded. Comments submitted after the deadline will also be disregarded.
Please note that the Procedural Decision issued on 17 April 2023 relating to the Applicant’s Change Request of 11 April 2023 (PDF, 176KB) has been edited to amend the date of receipt by the Examining Authority of the Certificates of Compliance
5 May 2023
Following the Examining Authority's (ExA) decision to accept the Applicant's Change Request of 11 April, comments are now invited on the Applicant's proposed provision for the compulsory acquisition of additional land by 23:59 on Friday 26 May 2023.
The Applicant published newspaper notices on 20 April 2023, inviting relevant representations to be submitted to the Planning Inspectorate regarding the proposed changes to the Application. Please note that the deadline for the receipt of these representations is 23:59 on Friday 26 May 2023 and not midday on Friday 26 May as stated in the newspaper notices.
Any comments must be made on the Registration and Relevant Representation Form and must relate to the Applicant's proposed provision only. Any submissions that are not in relation to this, or are not on the prescribed form, will not be seen by the ExA and will be disregarded. Comments submitted after the deadline will also be disregarded.
Please note that the Procedural Decision issued on 17 April 2023 relating to the Applicant's Change Request of 11 April 2023 (PDF, 176KB) has been edited to amend the date of receipt by the Examining Authority of the Certificates of Compliance
2 May 2023
The Applicant published newspaper notices on 20 April 2023, inviting relevant representations to be submitted to the Planning Inspectorate regarding the proposed changes to the Application. Please note that the deadline for the receipt of these representations is 23:59 on Friday 26 May 2023 and not midday on Friday 26 May as stated in the newspaper notices.
Any comments must be made on the Registration and Relevant Representation Form and must relate to the Applicant's proposed provision only. Any submissions that are not in relation to this, or are not on the prescribed form, will not be seen by the ExA and will be disregarded. Comments submitted after the deadline will also be disregarded.
Please note that the Procedural Decision issued on 17 April 2023 relating to the Applicant's Change Request of 11 April 2023 (PDF, 176KB) has been edited to amend the date of receipt by the Examining Authority of the Certificates of Compliance.
20 April 2023
Any comments must be made on the Registration and Relevant Representation Form and must relate to the Applicant's proposed provision only. Any submissions that are not in relation to this, or are not on the prescribed form, will not be seen by the ExA and will be disregarded. Comments submitted after the deadline will also be disregarded.
Please note that the Procedural Decision issued on 17 April 2023 relating to the Applicant's Change Request of 11 April 2023 (PDF, 176KB) has been edited to amend the date of receipt by the Examining Authority of the Certificates of Compliance.
17 April 2023
The ExA has made a Procedural Decision (PDF, 176 KB) to accept the Applicant's second Change Request received on 11 April 2023. The Examining Authority's Proposed Provisions Checklist (PDF, 174 KB) is also published.
The ExA's Note of their Unaccompanied Site Inspection on 30 March 2023 (PDF, 162KB) has also been published.
14 April 2023
The Examining Authority has 28 days to determine whether to accept this change request.
The Examining Authority's Second Written Questions (PDF, 746KB) have been published.
The Examination Library has been updated.
12 April 2023
4 April 2023
Compulsory Acquisition Hearing 1
Open Floor Hearing 2
Issue Specific Hearing 5
Issue Specific Hearing 6
The Examination Library (PDF, 578 KB) has been updated.
30 March 2023
The following have been accepted as Additional Submissions at the discretion of the Examining Authority:
- Natural England Position Statement in Lieu of Attendance at Issue Specific Hearings 4, 5 and 6 (PDF 238 KB)
- National Trust Position Statement in Lieu of Attendance at Issue Specific Hearings 5 (5 MB)
- NATS Safeguarding Position Statement in Lieu of Attendance at Issue Specific Hearings 6 (PDF 178 KB)
Plans accompanying Maritime and Coastguard Agency’s Deadline 1 representation (PDF, 5 MB) as requested by the Examining Authority in their Agenda for Issue Specific Hearing 6 have been published
28 March 2023
The following have been accepted as Additional Submissions at the discretion of the Examining Authority:
- Natural England Position Statement in Lieu of Attendance at Issue Specific Hearings 4, 5 and 6 (PDF 238 KB)
- National Trust Position Statement in Lieu of Attendance at Issue Specific Hearings 5 (5 MB)
- NATS Safeguarding Position Statement in Lieu of Attendance at Issue Specific Hearings 6 (PDF 178 KB)
28 March 2023
The Agendas and Itinerary for the following hearings and Accompanied Site Inspection have been published:
- Compulsory Acquisition Hearing – Wednesday 29 March 2023 (PDF, 214KB)
- Open Floor Hearing 2 – Wednesday 29 March 2023 (PDF, 144KB)
- Issue Specific Hearing 5 on Offshore Environmental Matters including the DCO – Thursday 30 March 2023 (PDF, 194KB)
- Issue Specific Hearing 6 on Offshore Environmental Matters including the DCO – Friday 31 March 2023 (PDF, 192KB)
The recordings and transcripts for the Issue Specific Hearings 3 and 4 have been published:
27 March 2023
The Agendas and Itinerary for the following hearings and Accompanied Site Inspection have been published:
- Issue Specific Hearing 3 on Onshore Environmental Matters including the DCO – Wednesday 22 March 2023 (PDF, 171KB)
- Issue Specific Hearing 4 on Onshore Environmental Matters including the DCO – Thursday 23 March 2023 (PDF, 186KB)
- Accompanied Site Inspection 2 Itinerary – Friday 24 March 2023 (PDF, 5MB)
- Compulsory Acquisition Hearing – Wednesday 29 March 2023 (PDF, 214KB)
- Open Floor Hearing 2 – Wednesday 29 March 2023 (PDF, 144KB)
- Issue Specific Hearing 5 on Offshore Environmental Matters including the DCO – Thursday 30 March 2023 (PDF, 194KB)
- Issue Specific Hearing 6 on Offshore Environmental Matters including the DCO – Friday 31 March 2023 (PDF, 192KB)
The recordings and transcripts for the Issue Specific Hearings 3 and 4 have been published:
- Issue Specific Hearing 3 on Onshore Environmental Matters including the DCO Wednesday 23 March 2023
- Issue Specific Hearing 4 on Onshore Environmental Matters including the DCO Thursday 24 March 2023
The Applicant has provided 3D visualisations of Supporting Figures to Chapter 26 Landscape and Visual Impact Assessment Figures to assist the Accompanied Site Inspection 2 Friday 24 March 2023, which have been entered into the Examination
Correspondence between Natural England and the Planning Inspectorate pertaining to Natural England's position on hearing attendance (PDF, 486 KB) has been entered into the Examination as an Additional Submission
22 March 2023
The Agendas and Itinerary for the following hearings and Accompanied Site Inspection have been published:
- Issue Specific Hearing 3 on Onshore Environmental Matters including the DCO – Wednesday 22 March 2023 (PDF, 171KB)
- Issue Specific Hearing 4 on Onshore Environmental Matters including the DCO – Thursday 23 March 2023 (PDF, 186KB)
- Accompanied Site Inspection 2 Itinerary – Friday 24 March 2023(PDF, 5MB)
- Compulsory Acquisition Hearing – Wednesday 29 March 2023(PDF, 214KB)
- Open Floor Hearing 2 – Wednesday 29 March 2023 (PDF, 144KB)
- Issue Specific Hearing 5 on Offshore Environmental Matters including the DCO – Thursday 30 March 2023 (PDF, 194KB)
- Issue Specific Hearing 6 on Offshore Environmental Matters including the DCO – Friday 31 March 2023 (PDF, 192KB)
14 March 2023
- Issue Specific Hearing 3 on Onshore Environmental Matters including the DCO - Wednesday 22 March 2023 (PDF, 171KB)
- Issue Specific Hearing 4 on Onshore Environmental Matters including the DCO - Thursday 23 March 2023 (PDF, 186KB)
- Accompanied Site Inspection 2 Itinerary - Friday 24 March 2023(PDF, 5MB)
- Compulsory Acquisition Hearing - Wednesday 29 March 2023(PDF, 214KB)
- Open Floor Hearing 2 - Wednesday 29 March 2023 (PDF, 144KB)
- Issue Specific Hearing 5 on Offshore Environmental Matters including the DCO - Thursday 30 March 2023 (PDF, 194KB)
- Issue Specific Hearing 6 on Offshore Environmental Matters including the DCO - Friday 31 March 2023 (PDF, 192KB)
13 March 2023
The Examination Library (PDF, 504 KB) has been updated.
The Itinerary for the Accompanied Site Inspection 2 (PDF, 5MB) on Friday 24 March 2023 has been published
9 March 2023
The Examination Library (PDF, 504 KB) has been updated.
1 March 2023
The Rule 13 Letter giving notice of the Hearings to be held 22 – 23 and 29 – 31 March 2023 (PDF, 165 KB) has been published.
The Examination Library has been updated.
24 February 2023
The Rule 13 Letter giving notice of the Hearings to be held 22 – 23 and 29 – 31 March 2023 (PDF, 165 KB) has been published.
The Examination Library will be updated shortly.
22 February 2023
2 February 2023
Other recent publications by ExA remain:
- First written questions (WQ1) (PDF, 912KB)
- Note of the ExA’s Unaccompanied Site Inspection (USI) on Monday 16 January 2023 (PDF, 160KB)
- Note of the Preliminary Meeting 17 January 2023 (PDF, 137KB)
27 January 2023
The Examination Timetable (Rule 8 letter) has been sent to Interested Parties. This includes notification of further Hearings and Accompanied Site Inspection in March 2023.
The Examining Authority (ExA) has also issued their first written questions (WQ1). As stated at ISH1 and ISH2, the ExA has incorporated the post Hearing actions and other issues emerging at the Hearings in WQ1. As such there will be no further issue of post Hearing actions.
A note of the ExA's Unaccompanied Site Inspection (USI) on Monday 16 January 2023 and a note of the Preliminary Meeting 17 January 2023 have also been published
27 January 2023
Procedural decision following Preliminary Meeting.
23 January 2023
17 January 2023
Recording and transcript of Preliminary Meeting – 17 January 2023
Recordings and transcripts of Open Floor Hearing 1 – 17 January 2023
Recordings and transcripts of Issue Specific Hearing 1 – 18 January 2023
The Applicant has submitted a notification of intention to submit a change request which the Examining Authority has accepted as an Additional Submission (PDF 134KB)
Instructions for those wishing to participate in the Preliminary Meeting, Open Floor Hearing, Issue Specific Hearing 1 and Issue Specific Hearing 2 during the week commencing 17 January 2023 have been sent. For those wishing to observe any of the Hearings in real time please use the following livestream link: https://cvslivestream.co.uk/sadep/
Please note that the Hearings will start broadcasting LIVE once they open. If the livestream does not initially work it may be resolved by refreshing the webpage. If you have any issues with accessing the livestream please contact the Case Team: SADEP@planninginspectorate.gov.uk or 0303 444 5000.
17 January 2023
17 January 2023
16 January 2023
Please note that the Hearings will start broadcasting LIVE once they open. If the livestream does not initially work it may be resolved by refreshing the webpage. If you have any issues with accessing the livestream please contact the Case Team: SADEP@planninginspectorate.gov.uk or 0303 444 5000.
10 January 2023
21 December 2022
The letter also includes the draft Examination Timetable and Initial Assessment of Principal Issues.
The Examining Authority has made minor revisions in the Rule 6 letter and accompanying annexes (PDF, 447KB) to reflect the changes in the list of 'Other Persons' invited to the Preliminary Meeting and to clarify the deadline for the receipt of additional application documents from the Applicant.
The Examining Authority has issued letters to Mulbarton Parish Council (PDF, 243KB) and Non-Statutory Stakeholders (PDF, 238KB).
13 December 2022
The letter also includes the draft Examination Timetable and Initial Assessment of Principal Issues.
22 November 2022
14 November 2022
28 October 2022
Register online
If you are unable to complete a registration form online and would like to register your interest, please call the helpline on 0303 444 5000 or email the project mailbox, as found on the project page, for advice on how to register.
For further advice please see Advice Note 8.2: How to register to participate in an Examination.
The Applicant has submitted their response to s51 Advice issued by the Planning Inspectorate on 3 October 2022, including updated versions of application documents, which have been accepted by the Examining Authority as Pre-Examination Additional Submissions. The Examination Library has been updated.
The Note of the Examining Authority’s Unaccompanied Site Inspection of 1 and 2 November 2022 (PDF, 153 KB) has been published.
14 October 2022
3 October 2022
5 September 2022
The application documents will be made available on the project page of this website if the application is accepted for examination.