Back to list Sheringham and Dudgeon Extension Projects

Representation by Frontier Power (Frontier Power)

Date submitted
19 October 2022
Submitted by
Members of the public/businesses

Frontier Power Limited FPL manages the Blue Transmission Sheringham Shoal Limited BTSSL 132,000KV high voltage transmission export cables that connect the offshore windfarm to the UK grid. The licence to own and operate the offshore transmission assets was granted on the 26th June 2013. Sheringham Shoal wind farm transmission assets are located in the North Sea off the Norfolk Coast. The Sheringham Shoal wind farm has a generating capacity of 316MW. The transmission assets include two offshore substations connected via two offshore cables of approx. 22km and two 22km onshore export cables to the onshore Sale substation, near Cawston, Norwich. Our interest is insuring the continued licensed operation and HSE relating to these cables to maintain the existing export from the current offshore windfarm.