View examination library (PDF, 658KB) containing document reference numbers
-
Additional Submission - 5.5 Technical Guide - Rev 2 - Track Change - Accepted at the discretion of the Examining Authority
(PDF, 2MB)
From Heckington Fen Solar Park
-
Additional Submission - Appendix 2 - Cover Letter to the Planning Inspectorate and the reduced consultee list - Accepted at the discretion of the Examining Authority
(PDF, 7MB)
From Heckington Fen Solar Park
-
Additional Submission - 6.2.6 Environmental Statement Figure 6.1 LVIA Site Location Plan - Rev 2 - Accepted at the discretion of the Examining Authority
(PDF, 5MB)
From Heckington Fen Solar Park
-
Additional Submission - 4.2 Funding Statement - Rev 2 - Accepted at the discretion of the Examining Authority
(PDF, 3MB)
From Heckington Fen Solar Park
-
Additional Submission - 6.2.6 Figure 6.7 LVIA Photomontages Part 5 - Rev 2 - Accepted at the discretion of the Examining Authority
(PDF, 47MB)
From Heckington Fen Solar Park
-
Additional Submission - 3.1 Draft Development Consent Order - Rev 3 - Track Change - Accepted at the discretion of the Examining Authority
(PDF, 2MB)
From Heckington Fen Solar Park
-
Additional Submission - 6.2.6 Environmental Statement Figure 6.2 Landscape Strategy Plan - Rev 2 - Accepted at the discretion of the Examining Authority
(PDF, 9MB)
From Heckington Fen Solar Park
-
Additional Submission - 6.2.6 Environmental Statement Figure 6.3 Landscape Character Plan - Rev 2 - Accepted at the discretion of the Examining Authority
(PDF, 3MB)
From Heckington Fen Solar Park
-
Additional Submission - 7.1 Outline Design Principles - Rev 2 - Accepted at the discretion of the Examining Authority
(PDF, 1MB)
From Heckington Fen Solar Park
-
Additional Submission - 7.4 Design and Access Statement - Rev 2 - Track Change - Accepted at the discretion of the Examining Authority
(PDF, 18MB)
From Heckington Fen Solar Park
-
Additional Submission - Change Consultation Report - Accepted at the discretion of the Examining Authority
(PDF, 1MB)
From Heckington Fen Solar Park
-
Additional Submission - 6.1.0 Chapter 0 - Contents and Statement of Competence - Rev 2 - Track Change - Accepted at the discretion of the Examining Authority
(PDF, 1MB)
From Heckington Fen Solar Park
-
Additional Submission - 6.2.12 Environmental Statement Figure 12.1 Noise Survey Locations - Rev 2 - Accepted at the discretion of the Examining Authority
(PDF, 4MB)
From Heckington Fen Solar Park
-
Additional Submission - 6.1.1 Chapter 1 - Introduction - Rev 2 - Track Change - Accepted at the discretion of the Examining Authority
(PDF, 1MB)
From Heckington Fen Solar Park
-
Additional Submission - 6.1.11 Chapter 11 - Socio-Economics - Rev 2 - Track Change - Accepted at the discretion of the Examining Authority
(PDF, 2MB)
From Heckington Fen Solar Park
-
Additional Submission - 6.1.20 Chapter 20 - Glossary - Rev 2 - Accepted at the discretion of the Examining Authority
(PDF, 1MB)
From Heckington Fen Solar Park
-
Additional Submission - 6.1.7 Chapter 7 - Residential Visual Amenity - Rev 2 - Accepted at the discretion of the Examining Authority
(PDF, 1MB)
From Heckington Fen Solar Park
-
Additional Submission - 6.4 Non-Technical Summary Part 1 - Rev 2 - Track Change - Accepted at the discretion of the Examining Authority
(PDF, 42MB)
From Heckington Fen Solar Park
-
Additional Submission - 3.8 Environmental Statement Figure - Extent of plantation clearance at Bicker Fen National Grid Substation - Accepted at the discretion of the Examining Authority
(PDF, 2MB)
From Heckington Fen Solar Park
-
Additional Submission - 6.1.14 Chapter 14 - Transport and Access - Rev 2 - Track Change - Accepted at the discretion of the Examining Authority
(PDF, 2MB)
From Heckington Fen Solar Park
-
Additional Submission - 6.1.7 Chapter 7 - Residential Visual Amenity - Rev 2 - Track Change - Accepted at the discretion of the Examining Authority
(PDF, 1MB)
From Heckington Fen Solar Park
-
Additional Submission - 6.2.6 Figure 6.7 LVIA Photomontages Part 3 - Rev 2 - Accepted at the discretion of the Examining Authority
(PDF, 50MB)
From Heckington Fen Solar Park
-
Additional Submission - 6.3.6.9 Environmental Statement Appendix 6.9 - Detailed Visual Assessment - Rev 3 - Track Change - Accepted at the discretion of the Examining Authority
(PDF, 1MB)
From Heckington Fen Solar Park
-
Additional Submission - 6.1.3 Chapter 3 Site Description, Site Selection, Iterative Design Process - Rev 2 - Track Change - Accepted at the discretion of the Examining Authority
(PDF, 1MB)
From Heckington Fen Solar Park
-
Additional Submission - 6.1.2 Chapter 2 - EIA Methodology and Consultation - Rev 2 - Track Change - Accepted at the discretion of the Examining Authority
(PDF, 1MB)
From Heckington Fen Solar Park
-
Additional Submission - 6.1.6 Chapter 6 - Landscape and Visual - Rev 2 - Accepted at the discretion of the Examining Authority
(PDF, 2MB)
From Heckington Fen Solar Park
-
Additional Submission - 6.3.8.12 Appendix 8.12 - Biodiversity Net Gain Calculation - Rev 2 - Accepted at the discretion of the Examining Authority
(PDF, 2MB)
From Heckington Fen Solar Park
-
Additional Submission - 7.2 Mitigation Schedule - Rev 2 - Accepted at the discretion of the Examining Authority
(PDF, 1MB)
From Heckington Fen Solar Park
-
Additional Submission - 6.2.3 Environmental Statement Figure 3.6 Environmental Designations Plan - Rev 2 - Accepted at the discretion of the Examining Authority
(PDF, 4MB)
From Heckington Fen Solar Park
-
Additional Submission - 6.2.6 Environmental Statement Figure 6.6 Context Baseline Views Part 5 - Rev 1 - Accepted at the discretion of the Examining Authority
(PDF, 5MB)
From Heckington Fen Solar Park
-
Additional Submission - 5.4 Grid Connection Statement - Rev 2 - Accepted at the discretion of the Examining Authority
(PDF, 1MB)
From Heckington Fen Solar Park
-
Additional Submission - 6.1.0 Chapter 0 - Contents and Statement of Competence - Rev 2 - Accepted at the discretion of the Examining Authority
(PDF, 1MB)
From Heckington Fen Solar Park
-
Additional Submission - 2.8 Location and Order Limits Plan - Rev 2 - Accepted at the discretion of the Examining Authority
(PDF, 9MB)
From Heckington Fen Solar Park
-
Additional Submission - 6.1.11 Chapter 11 - Socio-Economics - Rev 2 - Accepted at the discretion of the Examining Authority
(PDF, 2MB)
From Heckington Fen Solar Park
-
Additional Submission - 6.1.20 Chapter 20 - Glossary - Rev 2 - Track Change - Accepted at the discretion of the Examining Authority
(PDF, 1MB)
From Heckington Fen Solar Park
-
Additional Submission - 6.1.9 Chapter 9 - Hydrology, Hydrogeology, Flood Risk and Drainage - Rev 2 - Accepted at the discretion of the Examining Authority
(PDF, 2MB)
From Heckington Fen Solar Park
-
Additional Submission - 6.2.9 Environmental Statement Figure 9.3 Bedrock Geology - Rev 2 - Accepted at the discretion of the Examining Authority
(PDF, 2MB)
From Heckington Fen Solar Park
-
Additional Submission - 6.2.1 Environmental Statement Figure 1.1 Order Limits - Rev 2 - Accepted at the discretion of the Examining Authority
(PDF, 2MB)
From Heckington Fen Solar Park
-
Additional Submission - 6.2.11 Environmental Statement Figure 11.1 Administrative Boundaries (Regional) - Rev 2 - Accepted at the discretion of the Examining Authority
(PDF, 3MB)
From Heckington Fen Solar Park
-
Additional Submission - 6.3.6.11 Environmental Statement Appendix 6.11 - Legislative and Policy Framework - Rev 2 - Track Change - Accepted at the discretion of the Examining Authority
(PDF, 1MB)
From Heckington Fen Solar Park
-
Additional Submission - 6.4 Non-Technical Summary Part 1 - Rev 2 - Accepted at the discretion of the Examining Authority
(PDF, 42MB)
From Heckington Fen Solar Park
-
Additional Submission - 6.1.18 Chapter 18 - Miscellaneous Issues - Rev 2 - Track Change - Accepted at the discretion of the Examining Authority
(PDF, 2MB)
From Heckington Fen Solar Park
-
Additional Submission - 6.2.12 Environmental Statement Figure 12.2 Noise Assessment Locations - Rev 2 - Accepted at the discretion of the Examining Authority
(PDF, 4MB)
From Heckington Fen Solar Park
-
Additional Submission - 7.10 Outline Construction Traffic Management Plan - Rev 3 - Accepted at the discretion of the Examining Authority
(PDF, 12MB)
From Heckington Fen Solar Park
-
Additional Submission - 7.8 - Outline Landscape Ecological Management Plan - Rev 2 - Accepted at the discretion of the Examining Authority
(PDF, 14MB)
From Heckington Fen Solar Park
-
Additional Submission - 6.2.2 Environmental Statement Figure 2.2a Cumulative Sites - Shortlisted (Regional Context) - Rev 2 - Accepted at the discretion of the Examining Authority
(PDF, 2MB)
From Heckington Fen Solar Park
-
Additional Submission - 6.2.6 Environmental Statement Figure 6.4 Visual Receptors Plan - Rev 2 - Accepted at the discretion of the Examining Authority
(PDF, 4MB)
From Heckington Fen Solar Park
-
Additional Submission - 4.28 Environmental Statement Figure - GIS Substation Building (Indicative) - Accepted at the discretion of the Examining Authority
(PDF, 1MB)
From Heckington Fen Solar Park
-
Additional Submission - 7.2 Mitigation Schedule - Rev 2 - Track Change - Accepted at the discretion of the Examining Authority
(PDF, 1MB)
From Heckington Fen Solar Park
-
Additional Submission - 7.7 - Outline Construction Environmental Management Plan - Rev 3 - Accepted at the discretion of the Examining Authority
(PDF, 45MB)
From Heckington Fen Solar Park
-
Additional Submission - 7.4 Design and Access Statement - Rev 2 - Accepted at the discretion of the Examining Authority
(PDF, 18MB)
From Heckington Fen Solar Park
-
Additional Submission - 4.2 Funding Statement - Rev 2 - Track Change - Accepted at the discretion of the Examining Authority
(PDF, 3MB)
From Heckington Fen Solar Park
-
Additional Submission - 6.2.11 Environmental Statement Figure 11.5 Index of Multiple Deprivation for the Proposed Development, 2019 - Rev 2 - Accepted at the discretion of the Examining Authority
(PDF, 3MB)
From Heckington Fen Solar Park
-
Additional Submission - 4.27 Environmental Statement Figure - Land Use Parameter Plan for Design Options at Bicker Fen Substation Extension - Accepted at the discretion of the Examining Authority
(PDF, 1MB)
From Heckington Fen Solar Park
-
Additional Submission - 6.2.9 Environmental Statement Figure 9.1 Hydrology and Drainage - Rev 2 - Accepted at the discretion of the Examining Authority
(PDF, 3MB)
From Heckington Fen Solar Park
-
Additional Submission - 2.4 Statutory and Non-Statutory Nature Conservation Designation - Rev 2 - Accepted at the discretion of the Examining Authority
(PDF, 10MB)
From Heckington Fen Solar Park
-
Additional Submission - 2.5 Water Bodies in a River Basin Management Plan - Rev 2 - Accepted at the discretion of the Examining Authority
(PDF, 9MB)
From Heckington Fen Solar Park
-
Additional Submission - 6.4 Non-Technical Summary Part 3 - Rev 2 - Track Change - Accepted at the discretion of the Examining Authority
(PDF, 18MB)
From Heckington Fen Solar Park
-
Additional Submission - 4.26 Environmental Statement Figure - 400kV Bicker Fen NG Substation Layout and Section Details - Rev 2 - Accepted at the discretion of the Examining Authority
(PDF, 2MB)
From Heckington Fen Solar Park
-
Additional Submission - 6.2.10 Environmental Statement Figure 10.1 Designated Heritage Assets - Rev 2 - Accepted at the discretion of the Examining Authority
(PDF, 3MB)
From Heckington Fen Solar Park
-
Additional Submission - 6.4 Non-Technical Summary Part 2 - Rev 2 - Track Change - Accepted at the discretion of the Examining Authority
(PDF, 42MB)
From Heckington Fen Solar Park
-
Additional Submission - 6.4 Non-Technical Summary Part 2 - Rev 2 - Accepted at the discretion of the Examining Authority
(PDF, 42MB)
From Heckington Fen Solar Park
-
Additional Submission - 6.2.7 Figure 7.3 RVAA Photomontages Part 4 - Rev 2 - Accepted at the discretion of the Examining Authority
(PDF, 47MB)
From Heckington Fen Solar Park
-
Additional Submission - 6.3.6.8 Environmental Statement Appendix 6.8 - Scoping Out - Visual Assessment - Rev 2 - Accepted at the discretion of the Examining Authority
(PDF, 1MB)
From Heckington Fen Solar Park
-
Additional Submission - 7.9 - Outline Decommissioning and Restoration Plan - Rev 2 - Accepted at the discretion of the Examining Authority
(PDF, 1MB)
From Heckington Fen Solar Park
-
Additional Submission - 6.2.8 Environmental Statement Figure 8.1 Survey Areas - Rev 2 - Accepted at the discretion of the Examining Authority
(PDF, 2MB)
From Heckington Fen Solar Park
-
Additional Submission - 8.13 Further Extended Phase 1 Habitat Survey Report - Bicker Fen Substation - Accepted at the discretion of the Examining Authority
(PDF, 3MB)
From Heckington Fen Solar Park
-
Procedural Deadline A Submission - Written submissions about how the application should be examined, including the draft Examination Timetable
(PDF, 4KB)
From North Kesteven District Council
-
Hearing Notice
(PDF, 99KB)
From Heckington Fen Solar Park
-
Additional Submission - Accepted at the discretion of the Examining Authority
(PDF, 222KB)
From Lincolnshire Wildlife Trust
-
Rule 6 letter - Notification of the preliminary meeting and matters to be discussed
(PDF, 513KB)
-
Additional Submission - Accepted at the discretion of the Examining Authority
(PDF, 34KB)
From Canal and River Trust
-
ExA Response to Change Request Notification Letter
(PDF, 150KB)
From Response to Applicant's letter dated 13 June 2023
-
Post Submission Changes Submission - Cover Letter
(PDF, 6MB)
From Ecotricity (Heck Fen Solar) Limited
-
Post Submission Changes Submission - Joint Position Statement with National Grid Electricity Transmission
(PDF, 437KB)
From Ecotricity (Heck Fen Solar) Limited
-
Certificates of Compliance - Section 59
(PDF, 1MB)
From Ecotricity (Heck Fen Solar) Limited
-
Certificates of Compliance - Section 56
(PDF, 642KB)
From Ecotricity (Heck Fen Solar) Limited
-
Certificate of Compliance - Section 16
(PDF, 940KB)
From Ecotricity (Heck Fen Solar) Limited
-
Examining Authority’s Note of an Unaccompanied Site Inspection (USI1) - 23 May 2023
(PDF, 121KB)
-
Section 56 Notice
(PDF, 83KB)
From Ecotricity (Heck Fen Solar) Limited
-
Rule 4 letter - Appointment of the Examining Authority
(PDF, 127KB)
-
Additional Submission - 6.3.9.1 - Appendix 9.1 - Flood Risk Assessment (including drainage strategy)_Part 1 - V2 -TC - Accepted at the discretion of the Examining Authority
(PDF, 41MB)
From Ecotricity (Heck Fen Solar) Limited
-
Additional Submission - 7.7 - Outline Construction Environmental Management Plan -V2 -TC - Accepted at the discretion of the Examining Authority
(PDF, 39MB)
From Ecotricity (Heck Fen Solar) Limited
-
Additional Submission - 4.3 - Book of Reference - V2 - Accepted at the discretion of the Examining Authority
(PDF, 2MB)
From Ecotricity (Heck Fen Solar) Limited
-
Additional Submission - 3.3 - Explanatory Memorandum - V2 - TC - Accepted at the discretion of the Examining Authority
(PDF, 1MB)
From Ecotricity (Heck Fen Solar) Limited
-
Additional Submission - 6.3.6.9- Appendix 6.9 - Detailed Visual Assessment - V2 - Accepted at the discretion of the Examining Authority
(PDF, 697KB)
From Ecotricity (Heck Fen Solar) Limited
-
Additional Submission - 4.1 - Statement of Reasons - V2 - Accepted at the discretion of the Examining Authority
(PDF, 3MB)
From Ecotricity (Heck Fen Solar) Limited
-
Additional Submission - 4.3 - Book of Reference - V2 - TC - Accepted at the discretion of the Examining Authority
(PDF, 2MB)
From Ecotricity (Heck Fen Solar) Limited
-
Additional Submission - 6.1.4 - Chapter 4 - Proposed Development - V2 - Accepted at the discretion of the Examining Authority
(PDF, 967KB)
From Ecotricity (Heck Fen Solar) Limited
-
Additional Submission - 3.1 - Draft Development Consent Order - V2 - Accepted at the discretion of the Examining Authority
(PDF, 2MB)
From Ecotricity (Heck Fen Solar) Limited
-
Additional Submission - 7.7 - Outline Construction Environmental Management Plan -V2 - Accepted at the discretion of the Examining Authority
(PDF, 38MB)
From Ecotricity (Heck Fen Solar) Limited
-
Additional Submission - 6.1.4 - Chapter 4 - Proposed Development - V2 - TC - Accepted at the discretion of the Examining Authority
(PDF, 976KB)
From Ecotricity (Heck Fen Solar) Limited
-
Additional Submission - 1.4 - Guide to the Application - V2 - Accepted at the discretion of the Examining Authority
(PDF, 1MB)
From Ecotricity (Heck Fen Solar) Limited
-
Additional Submission - 6.3.9.1 - Appendix 9.1 - Flood Risk Assessment (including drainage strategy)_Part 2 - V2 - Accepted at the discretion of the Examining Authority
(PDF, 31MB)
From Ecotricity (Heck Fen Solar) Limited
-
Additional Submission - PreExA.CL.s55.v1 - Cover Letter - Accepted at the discretion of the Examining Authority
(PDF, 844KB)
From Ecotricity (Heck Fen Solar) Limited
-
Additional Submission - 3.1 - Draft Development Consent Order - V2- TC - Accepted at the discretion of the Examining Authority
(PDF, 2MB)
From Ecotricity (Heck Fen Solar) Limited
-
Additional Submission - 6.3.6.9- Appendix 6.9 - Detailed Visual Assessment - V2 - TC - Accepted at the discretion of the Examining Authority
(PDF, 694KB)
From Ecotricity (Heck Fen Solar) Limited
-
Additional Submission - 2.2 - Works Plan - V2 - Accepted at the discretion of the Examining Authority
(PDF, 4MB)
From Ecotricity (Heck Fen Solar) Limited
-
Additional Submission - 2.10 - Crown Land Plan - Accepted at the discretion of the Examining Authority
(PDF, 8MB)
From Ecotricity (Heck Fen Solar) Limited
-
Additional Submission - 7.10 - Outline Construction Traffic Management Plan - V2 -TC - Accepted at the discretion of the Examining Authority
(PDF, 10MB)
From Ecotricity (Heck Fen Solar) Limited