Perenco UK Limited is an interested party with respect to the Outer Dowsing Wind Farm development for the following reasons; 1. Obstruction of access by helicopter to the 48/12-D ‘Malory’ platform, the proposed windfarm array zone surrounds the platform, and current operator/aircraft type in use requires a minimum of 6.3nm for unrestricted approach, take off/landing. 2. Obstruction of access by vessel to the subsea pipelines running from the 48/12-D ‘Malory’ platform, 48/12-BA ‘Galahad’, 48/11-A ‘Pickerill A’, and the 48/11-B ‘Pickerill B’ Platforms. 3. Obstruction of diverse line-of-sight telecommunication facilities used primarily for control of the following platforms; 1. 48/12 Malory 2. 48/17 Lancelot 3. 48/17 Excalibur 4. 48/17 Waveney Perenco UK Limited is representing itself, the following affiliates, Perenco Gas (UK) Limited and Perenco North Sea Limited, and as the operator on behalf of Everard Energy Limited, Ithaca Energy (UK) Limited, and RockRose (UKCS2) Limited.