View examination library (PDF, 703KB) containing document reference numbers
-
Recommendation for an Accompanied Site Inspection
(PDF, 3KB)
From Andrew Johnson
-
Written Representation
(PDF, 5KB)
From Elizabeth Murray
-
Examining Authority’s note of Unaccompanied Site Inspection (USI) to which the Application relates on 25 September 2024
(PDF, 135KB)
-
Change Request - 2.5 TRM Plans - Revision 2
(PDF, 51MB)
From Tillbridge Solar Limited
-
Change Request - 4.1 Statement of Reasons - September 2024 (Clean)
(PDF, 720KB)
From Tillbridge Solar Limited
-
Change Request - 4.4 Schedule of Negotiations and Powers Sought - Revision 1 (Tracked)
(PDF, 970KB)
From Tillbridge Solar Limited
-
Change Request - 4.4 Schedule of Negotiations and Powers Sought - Revision 1 (Clean)
(PDF, 964KB)
From Tillbridge Solar Limited
-
Change Request - 2.1 Location Plan - Revision 1
(PDF, 193MB)
From Tillbridge Solar Limited
-
Change Request - 3.1 Draft Development Consent Order - Revision 2 (Tracked)
(PDF, 2MB)
From Tillbridge Solar Limited
-
Change Request - 4.3 Book of Reference - Revision 1 (Tracked)
(PDF, 4MB)
From Tillbridge Solar Limited
-
Change Request - 2.3 Works Plans - Revision 1
(PDF, 44MB)
From Tillbridge Solar Limited
-
Change Request - 7.11 Framework CTMP - Revision 1 (Tracked)
(PDF, 37MB)
From Tillbridge Solar Limited
-
Change Request - 7.4 Outline Design Principles Statement - Revision 1 (Tracked)
(PDF, 197KB)
From Tillbridge Solar Limited
-
Change Request - 8.1 Change Request Report
(PDF, 93KB)
From Tillbridge Solar Limited
-
Change Request - 1.2 Guide to the Application - Revision 2 (Tracked)
(PDF, 165KB)
From Tillbridge Solar Limited
-
Change Request - 1.2 Guide to the Application - Revision 2 (Clean)
(PDF, 151KB)
From Tillbridge Solar Limited
-
Change Request - 7.14 Biodiversity Net Gain Report - Revision 1 (Tracked)
(PDF, 5MB)
From Tillbridge Solar Limited
-
Change Request - 6.3 Fig 3-7 Access Locations - Revision 1
(PDF, 9MB)
From Tillbridge Solar Limited
-
Change Request - 7.14 Biodiversity Net Gain Report - Revision 1 (Clean)
(PDF, 5MB)
From Tillbridge Solar Limited
-
Change Request - 6.3 Fig 3-1 Indicative Principal Site Layout Plan - Revision 1
(PDF, 3MB)
From Tillbridge Solar Limited
-
Change Request - 2.4 Streets Rights of Way and Access Plans - Revision 2
(PDF, 51MB)
From Tillbridge Solar Limited
-
Change Request - 7.19 Indicative Landscape Masterplan - Revision 1
(PDF, 44MB)
From Tillbridge Solar Limited
-
Change Request - 7.4 Outline Design Principles Statement - Revision 1 (Clean)
(PDF, 195KB)
From Tillbridge Solar Limited
-
Change Request - 7.11 Framework CTMP - Revision 1 (Clean)
(PDF, 37MB)
From Tillbridge Solar Limited
-
Change Request - 2.9 Hedgerow Removal Plan - Revision 1
(PDF, 12MB)
From Tillbridge Solar Limited
-
Change Request - 4.1 Statement of Reasons - September 2024 (Tracked)
(PDF, 720KB)
From Tillbridge Solar Limited
-
Change Request - 3.1 Draft Development Consent Order - Revision 2 (Clean)
(PDF, 2MB)
From Tillbridge Solar Limited
-
Change Request - 4.3 Book of Reference - Revision 1 (Clean)
(PDF, 3MB)
From Tillbridge Solar Limited
-
Change Request - Cover Letter
(PDF, 280KB)
From Tillbridge Solar Limited
-
Change Request - 8.2 NMC Consultation Report
(PDF, 6MB)
From Tillbridge Solar Limited
-
Change Request - 6.1 Chapter 3 Scheme Description - Revision 1 (Tracked)
(PDF, 993KB)
From Tillbridge Solar Limited
-
Change Request - 6.1 Chapter 3 Scheme Description - Revision 1 (Clean)
(PDF, 978KB)
From Tillbridge Solar Limited
-
Change Request - 6.6 ES Addendum
(PDF, 10MB)
From Tillbridge Solar Limited
-
Change Request - 2.2 Land and Crown Land Plans - Revision 1
(PDF, 19MB)
From Tillbridge Solar Limited
-
Rule 17 - Request for further information (Rule 17 EPR)
(PDF, 96KB)
-
Hearing Agenda for Open Floor Hearing 1 (OFH1)
(PDF, 101KB)
-
Hearing Agenda for Issue Specific Hearing 1 (ISH1)
(PDF, 196KB)
-
Direction under Rule 13 (6) - Applicant reduced period for notification
(PDF, 158KB)
-
Additional Submission accepted at the discretion of the Examining Authority - Applicant Email Regarding Hearing Notifications
(PDF, 169KB)
From Tillbridge Solar Limited
-
Rule 6 letter - Notification of the preliminary meeting and matters to be discussed
(PDF, 483KB)
-
Additional Submission accepted at the discretion of the Examining Authority
(PDF, 44KB)
From Colin Miller
-
Additional Submission - 6.3 Environmental Statement Figure 12-13W-CC: Reference Viewpoint Photography - Volume 6 - Accepted at the discretion of the Examining Authority
(PDF, 37MB)
From Tillbridge Solar Limited
-
Additional Submission - 6.2 Environmental Statement Appendix 13-4: Noise Modelling - Volume 6 (Tracked) - Accepted at the discretion of the Examining Authority
(PDF, 199KB)
From Tillbridge Solar Limited
-
Additional Submission - 6.3 Environmental Statement Figure 13-2: Operational Noise Contours - Volume 6 - Accepted at the discretion of the Examining Authority
(PDF, 6MB)
From Tillbridge Solar Limited
-
Additional Submission - 7.19 Indicative Landscape Masterplan - Volume 7 - Accepted at the discretion of the Examining Authority
(PDF, 15MB)
From Tillbridge Solar Limited
-
Additional Submission - 3.1 Draft Development Consent Order - Volume 3 (Tracked) - Accepted at the discretion of the Examining Authority
(PDF, 1MB)
From Tillbridge Solar Limited
-
Section 51 Response Letter
(PDF, 46KB)
From Tillbridge Solar Limited
-
Additional Submission - 1.2 Guide to the Application - Volume 1 (Clean) - Accepted at the discretion of the Examining Authority
(PDF, 139KB)
From Tillbridge Solar Limited
-
Additional Submission - 6.2 Environmental Statement Appendix 9-5: Baseline Report for Great Crested Newt - Volume 6 - Accepted at the discretion of the Examining Authority
(PDF, 6MB)
From Tillbridge Solar Limited
-
Additional Submission - 6.3 Environmental Statement Figure 2-2: Environmental Constraints Plan - Volume 6 - Accepted at the discretion of the Examining Authority
(PDF, 3MB)
From Tillbridge Solar Limited
-
Additional Submission - 6.2 Environmental Statement Appendix 8-5-1: Principal Site Geophysical Survey Report Part 1 of 2 - Volume 6 - Accepted at the discretion of the Examining Authority
(PDF, 45MB)
From Tillbridge Solar Limited
-
Additional Submission - 6.4 Environmental Statement - Non-technical Summary - Volume 6 (Clean) - Accepted at the discretion of the Examining Authority
(PDF, 20MB)
From Tillbridge Solar Limited
-
Additional Submission - 7.2 Planning Statement - Volume 7 (Tracked) - Accepted at the discretion of the Examining Authority
(PDF, 18MB)
From Tillbridge Solar Limited
-
Additional Submission - 7.17 Framework Landscape and Ecological Management Plan - Volume 7 (Clean) - Accepted at the discretion of the Examining Authority
(PDF, 562KB)
From Tillbridge Solar Limited
-
Additional Submission - 3.1 Draft Development Consent Order - Volume 3 (Clean) - Accepted at the discretion of the Examining Authority
(PDF, 2MB)
From Tillbridge Solar Limited
-
Additional Submission - 6.3 Environmental Statement Figure 4-2: Outcome of Planning and Environmental Constraints Mapping - Volume 6 - Accepted at the discretion of the Examining Authority
(PDF, 7MB)
From Tillbridge Solar Limited
-
Additional Submission - 6.2 Environmental Statement Appendix 13-4: Noise Modelling - Volume 6 (Clean) - Accepted at the discretion of the Examining Authority
(PDF, 180KB)
From Tillbridge Solar Limited
-
Additional Submission - 1.2 Guide to the Application - Volume 1 (Tracked) - Accepted at the discretion of the Examining Authority
(PDF, 183KB)
From Tillbridge Solar Limited
-
Additional Submission - 7.2 Planning Statement - Volume 7 (Clean) - Accepted at the discretion of the Examining Authority
(PDF, 17MB)
From Tillbridge Solar Limited
-
Additional Submission - 6.3 Environmental Statement Figure 16-4: Local Highway Network - Volume 6 - Accepted at the discretion of the Examining Authority
(PDF, 9MB)
From Tillbridge Solar Limited
-
Additional Submission - 7.3 Design and Access Statement - Volume 7 (Tracked) - Accepted at the discretion of the Examining Authority
(PDF, 39MB)
From Tillbridge Solar Limited
-
Additional Submission - 6.2 Environmental Statement Appendix 8-5-2: Cable Route Corridor Geophysical Survey Report - Volume 6 - Accepted at the discretion of the Examining Authority
(PDF, 20MB)
From Tillbridge Solar Limited
-
Additional Submission - 6.4 Environmental Statement - Non-technical Summary - Volume 6 (Tracked) - Accepted at the discretion of the Examining Authority
(PDF, 20MB)
From Tillbridge Solar Limited
-
Additional Submission - 7.3 Design and Access Statement - Volume 7 (Clean) - Accepted at the discretion of the Examining Authority
(PDF, 39MB)
From Tillbridge Solar Limited
-
Additional Submission - 6.3 Environmental Statement Figure 4-3: Zones Suitable for Solar Development - Volume 6 - Accepted at the discretion of the Examining Authority
(PDF, 6MB)
From Tillbridge Solar Limited
-
Additional Submission - 6.3 Environmental Statement Figure 12-4A-H: Zones of Theoretical Visibility - Volume 6 - Accepted at the discretion of the Examining Authority
(PDF, 24MB)
From Tillbridge Solar Limited
-
Additional Submission - 6.3 Environmental Statement Figure 12-13Q-V: Reference Viewpoint Photography - Volume 6 - Accepted at the discretion of the Examining Authority
(PDF, 21MB)
From Tillbridge Solar Limited
-
Additional Submission - 6.3 Environmental Statement Figure 16-3: Proposed HGV Routes - Principal Site and Cable Route Corridor - Volume 6 - Accepted at the discretion of the Examining Authority
(PDF, 9MB)
From Tillbridge Solar Limited
-
Certificate of compliance with section 56 of the Planning Act 2008
(PDF, 101KB)
From Tillbridge Solar Limited
-
Examining Authority’s response to Applicant's Notification of Change Request dated 18 July 2024
(PDF, 177KB)
-
Additional Submission - 7.17 Framework Landscape and Ecological Management Plan - Volume 7 (Tracked) - Accepted at the discretion of the Examining Authority
(PDF, 588KB)
From Tillbridge Solar Limited
-
Additional Submission - 6.3 Environmental Statement Figure 12-11: Local Landscape Character Areas (Defined by the Applicant) - Volume 6 - Accepted at the discretion of the Examining Authority
(PDF, 6MB)
From Tillbridge Solar Limited
-
Additional Submission - 6.3 Environmental Statement Figure 16-8: Selected Bus Stops and Routes Closest to the Scheme - Volume 6 - Accepted at the discretion of the Examining Authority
(PDF, 8MB)
From Tillbridge Solar Limited
-
Certificate of Compliance with Section 59 of the Planning Act 2008
(PDF, 140KB)
From Tillbridge Solar Limited
-
Additional Submission - Notification of Change Request - Accepted at the discretion of the Examining Authority
(PDF, 231KB)
From Tillbridge Solar Limited
-
Certificate of Compliance with Regulation 16 Notice
(PDF, 95KB)
From Tillbridge Solar Limited
-
Additional Submission - 6.1 Environmental Statement Chapter 13: Noise and Vibration - Volume 6 (Clean) - Accepted at the discretion of the Examining Authority
(PDF, 552KB)
From Tillbridge Solar Limited
-
Additional Submission - 6.1 Environmental Statement Chapter 13: Noise and Vibration - Volume 6 (Tracked) - Accepted at the discretion of the Examining Authority
(PDF, 562KB)
From Tillbridge Solar Limited
-
Rule 4 Appointment of the Examining Authority
(PDF, 139KB)
-
Regulation 32 - Transboundary Screening
(PDF, 77KB)
-
Section 56 Notice
(PDF, 95KB)
From Tillbridge Solar Limited
-
Examination Library
(PDF, 703KB)
From Examination Library
-
6.2 Appendix 9-11: Baseline Report for Badger Part 1 of 2
(PDF, 201KB)
From Tillbridge Solar Limited
-
6.3 Figure 8-4: Archaeological Events
(PDF, 12MB)
From Tillbridge Solar Limited
-
5.2 Consultation Report: Appendix H – Section 47 responses received and Applicant response
(PDF, 2MB)
From Tillbridge Solar Limited
-
4.4 Schedule of Negotiations and Powers Sought
(PDF, 949KB)
From Tillbridge Solar Limited
-
5.2 Consultation Report: Appendix I – Section 42 responses received and Applicant response
(PDF, 2MB)
From Tillbridge Solar Limited
-
6.2 Appendix 8-6-6: Archaeological Evaluation Report for Fields 80, 81, 93-97, 115, 116, 125, 126 and 128
(PDF, 18MB)
From Tillbridge Solar Limited
-
6.2 Appendix 9-2: Aquatic Ecology Baseline Report
(PDF, 10MB)
From Tillbridge Solar Limited
-
6.2 Appendix 12-7: Arboricultural Impact Assessment Part 3 of 3
(PDF, 50MB)
From Tillbridge Solar Limited
-
7.2 Planning Statement
(PDF, 16MB)
From Tillbridge Solar Limited
-
6.2 Appendix 17-5: Unplanned Atmospheric Emissions from Battery Energy Storage Systems
(PDF, 3MB)
From Tillbridge Solar Limited
-
6.3 Figure 3-3: Indicative BESS and Solar Station Elevation
(PDF, 270KB)
From Tillbridge Solar Limited
-
7.6 Joint Report on Interrelationships between Nationally Significant Infrastructure Projects Part 2 of 3
(PDF, 17MB)
From Tillbridge Solar Limited
-
6.2 Appendix 10-4: Outline Drainage Strategy
(PDF, 12MB)
From Tillbridge Solar Limited
-
6.2 Appendix 1-1: EIA Scoping Report
(PDF, 29MB)
From Tillbridge Solar Limited
-
Appendix 8-2: Cultural Heritage Desk Based Assessment
(PDF, 48MB)
From Tillbridge Solar Limited
-
6.2 Appendix 8-7: Geo-archaeological Borehole Survey and Deposit Modelling
(PDF, 7MB)
From Tillbridge Solar Limited
-
6.2 Appendix 9-1: Ecology and Nature Conservation Legislation, Policy and Guidance
(PDF, 510KB)
From Tillbridge Solar Limited
-
6.2 Appendix 17-1 Other Environmental Topics Legislation, Policy and Guidance
(PDF, 561KB)
From Tillbridge Solar Limited