View examination library (PDF, 703KB) containing document reference numbers
-
3.3 Consents and Agreements Positions Statement
(PDF, 226KB)
From Tillbridge Solar Limited
-
6.2 Appendix 8-6-8: Archaeological Evaluation Report for Fields 91–92, 113–114 and 119–124
(PDF, 9MB)
From Tillbridge Solar Limited
-
6.2 Appendix 6-1: Air Quality Legislation, Policy and Guidance
(PDF, 285KB)
From Tillbridge Solar Limited
-
6.3 Figure 3-6: Indicative Construction Compound Locations
(PDF, 9MB)
From Tillbridge Solar Limited
-
6.3 Figure 3-11: Indicative Cable Route Corridor Trenched and Trenchless Crossing Locations
(PDF, 9MB)
From Tillbridge Solar Limited
-
6.1 Chapter 18 Cumulative Effects and Interactions
(PDF, 991KB)
From Tillbridge Solar Limited
-
6.2 Appendix 10-3: Flood Risk Assessment
(PDF, 14MB)
From Tillbridge Solar Limited
-
4.3 Book of Reference
(PDF, 2MB)
From Tillbridge Solar Limited
-
6.2 Appendix 8-6-3: Archaeological Evaluation Report for Fields 27–32, 36– 41, 43–49, 52–54, 60, 68, 72–79, 89–90, 101–106 and 110
(PDF, 27MB)
From Tillbridge Solar Limited
-
6.2 Appendix 9-3: Baseline Report for Flora (including hedgerows)
(PDF, 4MB)
From Tillbridge Solar Limited
-
6.3 Figure 13-1: Noise Sensitive Receptors and Noise Monitoring Locations
(PDF, 4MB)
From Tillbridge Solar Limited
-
6.3 Figure 9-3: Phase 1 Habitat
(PDF, 10MB)
From Tillbridge Solar Limited
-
7.17 Framework Landscape and Ecological Management Plan Part 3 of 3
(PDF, 21MB)
From Tillbridge Solar Limited
-
7.5 Grid Connection Statement
(PDF, 197KB)
From Tillbridge Solar Limited
-
6.2 Appendix 13-3: Baseline Noise Survey
(PDF, 1MB)
From Tillbridge Solar Limited
-
6.2 Appendix 15-2: Agricultural Land Classification Baseline Report
(PDF, 3MB)
From Tillbridge Solar Limited
-
6.3 Figure 3-4b: Indicative Substation A Elevation
(PDF, 5MB)
From Tillbridge Solar Limited
-
6.3 Figure 3-12: Typical Trenchless Crossing Cross Sections
(PDF, 508KB)
From Tillbridge Solar Limited
-
5.2 Consultation Report: Appendix F - Stat Con under Section 46
(PDF, 671KB)
From Tillbridge Solar Limited
-
4.2 Funding Statement
(PDF, 1MB)
From Tillbridge Solar Limited
-
6.2 Appendix 12-1: LVIA Legislation, Policy and Guidance
(PDF, 368KB)
From Tillbridge Solar Limited
-
5.2 Consultation Report: Appendix E - Stat Con under Section 42
(PDF, 3MB)
From Tillbridge Solar Limited
-
7.13 Framework Battery Safety Management Plan
(PDF, 485KB)
From Tillbridge Solar Limited
-
7.6 Joint Report on Interrelationships between Nationally Significant Infrastructure Projects Part 3 of 3 Appendix E: Review of Cumulative Effects
(PDF, 424KB)
From Tillbridge Solar Limited
-
2.8 Waterbodies in a River Basin Management Plans
(PDF, 25MB)
From Tillbridge Solar Limited
-
6.2 Appendix 10-5: Water Environment Stakeholder Correspondence
(PDF, 8MB)
From Tillbridge Solar Limited
-
1.3 Section 55 Checklist
(PDF, 125KB)
From Tillbridge Solar Limited
-
6.2 Appendix 13-4: Noise Modelling
(PDF, 180KB)
From Tillbridge Solar Limited
-
6.3 Figure 18-4: Combined ZTV of the Scheme's Solar Panel Area Barrier ZTV within 5km Buffer and Gate Burton's Solar Panel Area Barrier ZTV within 5km Buffer
(PDF, 7MB)
From Tillbridge Solar Limited
-
1.1 Covering Letter
(PDF, 34KB)
From Tillbridge Solar Limited
-
7.11 Framework Construction Traffic Management Plan Part 2 of 2 Appendix C: Abnormal Indivisible Loads Management Plan
(PDF, 32MB)
From Tillbridge Solar Limited
-
7.8 Framework Construction Environmental Management Plan
(PDF, 799KB)
From Tillbridge Solar Limited
-
2.5 Traffic Regulation Measures Plans
(PDF, 46MB)
From Tillbridge Solar Limited
-
6.3 Figure 1-1: Location of the Scheme and Other Solar NSIPs
(PDF, 10MB)
From Tillbridge Solar Limited
-
6.3 Figure 3-9: Cable Route Corridor width reduction from PEI Report to ES
(PDF, 10MB)
From Tillbridge Solar Limited
-
6.3 Figure 12-8: National Landscape Character Areas
(PDF, 6MB)
From Tillbridge Solar Limited
-
6.3 Figure 4-5: Refinement of Site Search Area to 1500ha
(PDF, 2MB)
From Tillbridge Solar Limited
-
6.1 Chapter 0 Contents and Glossary
(PDF, 337KB)
From Tillbridge Solar Limited
-
1.4 Application Form
(PDF, 11MB)
From Tillbridge Solar Limited
-
6.2 Appendix 8-3-3: Gazetteer of Non-designated Heritage Assets
(PDF, 771KB)
From Tillbridge Solar Limited
-
6.3 Figure 4-1: Area of Search
(PDF, 5MB)
From Tillbridge Solar Limited
-
6.2 Appendix 9-7: Baseline Report for Breeding Birds Part 2 of 2 (Confidential)
(PDF, 106KB)
From Tillbridge Solar Limited
-
6.3 Figure 12-5: Topography and Watercourses
(PDF, 19MB)
From Tillbridge Solar Limited
-
6.2 Appendix 13-2: Acoustics Terminology
(PDF, 124KB)
From Tillbridge Solar Limited
-
6.3 Figure 16-9: Local Railway Stations
(PDF, 4MB)
From Tillbridge Solar Limited
-
6.1 Chapter 7 Climate Change
(PDF, 503KB)
From Tillbridge Solar Limited
-
6.2 Appendix 12-7: Arboricultural Impact Assessment Part 1 of 3
(PDF, 48MB)
From Tillbridge Solar Limited
-
6.3 Figure 8-5: Historic Landscape Characterisations
(PDF, 6MB)
From Tillbridge Solar Limited
-
6.3 Figure 9-2: Non Statutory Sites Designated For Nature Conservation Value
(PDF, 1MB)
From Tillbridge Solar Limited
-
6.4 Non-technical Summary
(PDF, 18MB)
From Tillbridge Solar Limited
-
6.1 Chapter 5 EIA Methodology
(PDF, 283KB)
From Tillbridge Solar Limited
-
6.3 Figure 12-1: Initial Site Appraisal Plan (originally issued June 2022)
(PDF, 552KB)
From Tillbridge Solar Limited
-
6.2 Appendix 8-6-7: Archaeological Evaluation: Report for Fields 88, 99, 107 and 108
(PDF, 7MB)
From Tillbridge Solar Limited
-
6.3 Figure 3-7: Access Locations
(PDF, 9MB)
From Tillbridge Solar Limited
-
6.1 Chapter 8 Cultural Heritage
(PDF, 1MB)
From Tillbridge Solar Limited
-
6.2 Appendix 6-2: Dust Risk Assessment
(PDF, 228KB)
From Tillbridge Solar Limited
-
6.3 Figure 3-8: Principal Site Internal Cable Route Corridor
(PDF, 9MB)
From Tillbridge Solar Limited
-
5.1 Consultation Report
(PDF, 10MB)
From Tillbridge Solar Limited
-
6.2 Appendix 8-6: Archaeological Evaluation Overarching Executive
(PDF, 23MB)
From Tillbridge Solar Limited
-
2.1 Location Plan
(PDF, 22MB)
From Tillbridge Solar Limited
-
5.2 Consultation Report: Appendix B - Preparation for Stat Con
(PDF, 22MB)
From Tillbridge Solar Limited
-
3.1 Draft DCO
(PDF, 2MB)
From Tillbridge Solar Limited
-
6.3 Figure 8-1: Designated Heritage Assets
(PDF, 11MB)
From Tillbridge Solar Limited
-
6.3 Figure 10-2: Groundwater Features and their Attributes
(PDF, 21MB)
From Tillbridge Solar Limited
-
6.3 Figure 18-3: Combined ZTV of the Scheme's Solar Panel Area Barrier ZTV within 5km Buffer and Cottam's Solar Panel Area Barrier ZTV within 5km Buffer
(PDF, 7MB)
From Tillbridge Solar Limited
-
6.3 Figure 12-12: Representative LVIA Viewpoints: Principal Site Only (With Bare Earth ZTV)
(PDF, 28MB)
From Tillbridge Solar Limited
-
4.1 Statement of Reasons
(PDF, 699KB)
From Tillbridge Solar Limited
-
6.2 Appendix 7-1: Climate Change Legislation, Policy and Guidance
(PDF, 314KB)
From Tillbridge Solar Limited
-
6.3 Figure 3-14: Indicative Construction Compound Layout
(PDF, 500KB)
From Tillbridge Solar Limited
-
6.3 Figure 4-6: Shared Cable Route Corridor
(PDF, 4MB)
From Tillbridge Solar Limited
-
6.3 Figure 12-9: Regional Landscape Character Areas
(PDF, 6MB)
From Tillbridge Solar Limited
-
6.3 Figure 12-10: Local Landscape Character Areas (Defined by the Applicant)
(PDF, 6MB)
From Tillbridge Solar Limited
-
7.3 Design and Access Statement
(PDF, 39MB)
From Tillbridge Solar Limited
-
7.4 Outline Design Principles Statement
(PDF, 2MB)
From Tillbridge Solar Limited
-
6.2 Appendix 8-5-2: Cable Route Corridor Geophysical Survey Report
(PDF, 11MB)
From Tillbridge Solar Limited
-
6.2 Appendix 17-2 Glint and Glare Assessment
(PDF, 10MB)
From Tillbridge Solar Limited
-
6.3 Figure 3-5b: Indicative Substation B Elevation
(PDF, 5MB)
From Tillbridge Solar Limited
-
5.2 Consultation Report: Appendix A - Non-statutory Consultation
(PDF, 38MB)
From Tillbridge Solar Limited
-
2.7 Statutory and Non-statutory Sites or Features of Nature Conservation, and Important Habitats Plans
(PDF, 38MB)
From Tillbridge Solar Limited
-
6.3 Figure 10-5: Watercourses, Flood Zones and Internal Drainage Boards
(PDF, 3MB)
From Tillbridge Solar Limited
-
6.2 Appendix 9-11: Baseline Report for Badger Part 2 of 2 (CONFIDENTIAL)
(PDF, 110KB)
From Tillbridge Solar Limited
-
6.3 Figure 12-2: Initial Site Constraints and Opportunities Plan (originally issued June 2022)
(PDF, 2MB)
From Tillbridge Solar Limited
-
6.3 Figure 12-4A-H: Zones of Theoretical Visibility
(PDF, 17MB)
From Tillbridge Solar Limited
-
6.2 Appendix 9-8: Baseline report for non-breeding birds
(PDF, 2MB)
From Tillbridge Solar Limited
-
6.2 Appendix 12-7: Arboricultural Impact Assessment Part 2 of 3
(PDF, 44MB)
From Tillbridge Solar Limited
-
6.2 Appendix 17-4 Ground Conditions Cable Route Corridor Preliminary Risk Assessment
(PDF, 23MB)
From Tillbridge Solar Limited
-
7.18 Framework Skills, Supply Chain and Employment Plan
(PDF, 622KB)
From Tillbridge Solar Limited
-
7.9 Framework Operational Environmental Management Plan
(PDF, 328KB)
From Tillbridge Solar Limited
-
2.3 Works Plan
(PDF, 43MB)
From Tillbridge Solar Limited
-
6.2 Appendix 9-10: Baseline Report for Riparian mammals
(PDF, 7MB)
From Tillbridge Solar Limited
-
6.1 Chapter 3 Scheme Description
(PDF, 974KB)
From Tillbridge Solar Limited
-
6.3 Figure 12-10: County and District Landscape Character Areas
(PDF, 35MB)
From Tillbridge Solar Limited
-
6.3 Figure 12-14A-J: Visualisations (Photomontages)
(PDF, 49MB)
From Tillbridge Solar Limited
-
6.3 Figure 13-2: Operational Noise Contours
(PDF, 2MB)
From Tillbridge Solar Limited
-
7.11 Framework Construction Traffic Management Plan Part 1 of 2
(PDF, 46MB)
From Tillbridge Solar Limited
-
6.2 Appendix 11-1 Human Health Legislation, Policy and Guidance
(PDF, 279KB)
From Tillbridge Solar Limited
-
1.2 Guide to the Application
(PDF, 123KB)
From Tillbridge Solar Limited
-
6.2 Appendix 17-3 Ground Conditions Principal Site Preliminary Risk Assessment
(PDF, 11MB)
From Tillbridge Solar Limited
-
6.2 Appendix 9-7: Baseline Report for Breeding Birds Part 1 of 2
(PDF, 1MB)
From Tillbridge Solar Limited
-
6.2 Appendix 12-3: LVIA Landscape Baseline
(PDF, 502KB)
From Tillbridge Solar Limited