View examination library (PDF, 748KB) containing document reference numbers
-
Deadline 6 Submission - 3.1(E) Draft Development Consent Order (Clean) - Final Issue E
(PDF, 2MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 6 Submission - 2.5.2(D) Land Plan Section B - Final Issue D
(PDF, 28MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 6 Submission - 5.2.19(D) Environmental Statement Consolidated Errata (Clean) - Final Issue D
(PDF, 2MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 6 Submission - 3.1(E) Draft Development Consent Order (Tracked) - Final Issue E
(PDF, 1MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 6 Submission - Response to Action Points
(PDF, 185KB)
From North Yorkshire Council
-
Deadline 6 Submission - 5.3.9D(B) Environmental Statement (ES) Chapter 9 Appendix 9D - Flood Risk Assessment (Tracked) - Final Issue B
(PDF, 27MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 6 Submission - Any further information requested by the Examining Authority under Rule 17 of The Infrastructure Planning (Examination Procedure) Rules 2010.
(PDF, 5KB)
From Stephensons Rural LLP on behalf of Mrs Pamela Husband, Ms Gill Eves, Mr Paul Bulmer, Benjamin Rab and Fiona Rab
-
Deadline 6 Submission - Preferred Protective Provisions
(PDF, 205KB)
From National Gas Transmissions Plc
-
Deadline 6 Submission - Response to Compulsory Acquisition Hearing 2 (CAH2) Action point 16
(PDF, 162KB)
From National Gas Transmissions Plc
-
Deadline 6 Submission - 5.3.3D(B) Environmental Statement (ES) Chapter 3 Appendix 3D - Biodiversity Mitigation Strategy (Clean) - Final Issue B
(PDF, 1MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 6 Submission - 4.3(F) Book of Reference (Clean) - Final Issue F
(PDF, 12MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 6 Submission - 2.2(B) Master Key to Section Identification Plan - Final Issue B
(PDF, 8MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 6 Submission - 5.4.3(D) Environmental Statement (ES) Chapter 3 Description of the Project - Figures - Final Issue D
(PDF, 25MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 6 Submission - Response to Compulsory Acquisition Hearing 2 (CAH2) Action point 18 - Appendix 1 - List of Development Consent Orders with Protective Provisions for National Grid Gas.
(PDF, 6MB)
From National Gas Transmissions Plc
-
Deadline 6 Submission - 3.2(E) Explanatory Memorandum (Clean) - Final Issue E
(PDF, 1MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 6 Submission - 2.5.3(C) Land Plans Section C - Final Issue C
(PDF, 41MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 6 Submission - 1.3(H) Navigation Document and Application Guide (Tracked) - Final Issue H
(PDF, 2MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 6 Submission - 5.3.3F(C) Environmental Statement (ES) Chapter 3 Appendix 3F - Construction Traffic Management Plan (Tracked) - Final Issue C
(PDF, 11MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 6 Submission - Response to Compulsory Acquisition Hearing 2 (CAH2) Action point 18
(PDF, 4MB)
From National Gas Transmissions Plc
-
Recording of Compulsory Acquisition Hearing 2 (CAH2) – Session 3 - 18 July 2023
(HTML, 4KB)
-
This document is intended to assist Interested Parties, it is not verbatim. The content is produced using artificial intelligence voice to text and is unedited. The video recording remains as the primary record of the event.
(PDF, 107KB)
From Transcript of Recording of Compulsory Acquisition Hearing 2 (CAH2) – Session 4 - 18 July 2023
-
This document is intended to assist Interested Parties, it is not verbatim. The content is produced using artificial intelligence voice to text and is unedited. The video recording remains as the primary record of the event.
(PDF, 211KB)
From Transcript of Recording of Compulsory Acquisition Hearing 2 (CAH2) – Session 3 - 18 July 2023
-
Recording of Compulsory Acquisition Hearing 2 (CAH2) – Session 4 - 18 July 2023
(HTML, 4KB)
-
This document is intended to assist Interested Parties, it is not verbatim. The content is produced using artificial intelligence voice to text and is unedited. The video recording remains as the primary record of the event.
(PDF, 184KB)
From Transcript of Recording of Compulsory Acquisition Hearing 2 (CAH2) – Session 2 - 18 July 2023
-
This document is intended to assist Interested Parties, it is not verbatim. The content is produced using artificial intelligence voice to text and is unedited. The video recording remains as the primary record of the event.
(PDF, 232KB)
From Transcript of Recording of Compulsory Acquisition Hearing 2 (CAH2) – Session 1 - 18 July 2023
-
Recording of Compulsory Acquisition Hearing 2 (CAH2) – Session 1 - 18 July 2023
(HTML, 4KB)
-
Recording of Compulsory Acquisition Hearing 2 (CAH2) – Session 2 - 18 July 2023
(HTML, 4KB)
-
Rule 17 letter – Examining Authority’s Request for Information from Stephensons Rural LLP
(PDF, 167KB)
-
Issue Specific Hearing 4 (ISH4) Action Points – Wednesday 19 July 2023
(PDF, 127KB)
From Issue Specific Hearing 4 (ISH4) Action Points
-
Recording of Issue Specific Hearing 4 (ISH4) – Session 4 – 19 July 2023
(HTML, 4KB)
-
This document is intended to assist Interested Parties, it is not verbatim. The content is produced using artificial intelligence voice to text and is unedited. The video recording remains as the primary record of the event.
(PDF, 223KB)
From Transcript of Recording of Issue Specific Hearing 4 (ISH4) – Session 1 – 19 July 2023
-
This document is intended to assist Interested Parties, it is not verbatim. The content is produced using artificial intelligence voice to text and is unedited. The video recording remains as the primary record of the event.
(PDF, 226KB)
From Transcript of Recording of Issue Specific Hearing 4 (ISH4) – Session 3 – 19 July 2023
-
Recording of Issue Specific Hearing 4 (ISH4) – Session 3 – 19 July 2023
(HTML, 4KB)
-
Recording of Issue Specific Hearing 4 (ISH4) – Session 1 – 19 July 2023
(HTML, 4KB)
-
Recording of Issue Specific Hearing 4 (ISH4) – Session 2 – 19 July 2023
(HTML, 4KB)
-
This document is intended to assist Interested Parties, it is not verbatim. The content is produced using artificial intelligence voice to text and is unedited. The video recording remains as the primary record of the event.
(PDF, 142KB)
From Transcript of Recording of Issue Specific Hearing 4 (ISH4) – Session 4 – 19 July 2023
-
This document is intended to assist Interested Parties, it is not verbatim. The content is produced using artificial intelligence voice to text and is unedited. The video recording remains as the primary record of the event.
(PDF, 186KB)
From Transcript of Recording of Issue Specific Hearing 4 (ISH4) – Session 2 – 19 July 2023
-
Additional Submission – accepted at the discretion of the Examining Authority - Responses to the Examining Authority’s Further Written Questions (ExQ2)
(PDF, 304KB)
From Yorkshire Wildlife Trust
-
Compulsory Acquisition Hearing 2 (CAH2) Action Points – Tuesday 18 July 2023
(PDF, 104KB)
From Compulsory Acquisition Hearing 2 (CAH2) Action Points
-
Additional Submission – accepted at the discretion of the Examining Authority - Written submission in lieu of attendance at Compulsory Acquisition Hearing 2 (CAH2)
(PDF, 61KB)
From National Gas Transmission plc
-
Deadline 5 Submission - Responses to the Examining Authority’s Further Written Questions (ExQ2)
(PDF, 154KB)
From City of York Council
-
Deadline 5 Submission - Responses to the Examining Authority's Further Written Questions (ExQ2)
(PDF, 275KB)
From Carter Jonas LLP on behalf of Philip Watson
-
Deadline 5 Submission - Responses to the Examining Authority’s Further Written Questions (ExQ2)
(PDF, 4KB)
From Foss (2008) Internal Drainage Board
-
Deadline 5 Submission - Responses to the Examining Authority’s Further Written Questions (ExQ2)
(PDF, 505KB)
From Leeds City Council
-
Deadline 5 Submission - Responses to the Examining Authority’s Further Written Questions (ExQ2)
(PDF, 192KB)
From Kyle and Upper Ouse Internal Drainage Board
-
Deadline 5 Submission - Responses to the Examining Authority’s Further Written Questions (ExQ2) - Appendix A Article 54 and Protective Provisions for the Protection of Canal and River Trust included in draft DCO (Document 3.1(D)) submitted at Deadline 5
(PDF, 205KB)
From Canal & River Trust
-
Deadline 5 Submission - Copy of letter regarding Draft s106 Agreement
(PDF, 530KB)
From Leeds City Council
-
Rule 8(3) and Rule 9 letter – Examining Authority’s Procedural Decision and changes to the Examination Timetable in relation to Applicant's Change App
(PDF, 185KB)
-
Deadline 5 Submission - Copy of letter to Applicant dated 16 February 2023
(PDF, 330KB)
From Historic England
-
Deadline 5 Submission - Responses to the Examining Authority's Further Written Questions (ExQ2)
(PDF, 170KB)
From Natural England
-
Deadline 5 Submission - Responses to the Examining Authority’s Further Written Questions (ExQ2)
(PDF, 583KB)
From Canal & River Trust
-
Deadline 5 Submission - Withdrawal of submissions [RR-016, RR-017]
(PDF, 209KB)
From George F White LLP on behalf of Mark Godliman and the Midgley Family
-
Deadline 5 Submission - Responses to the Examining Authority’s Further Written Questions (ExQ2)
(PDF, 5KB)
From Stephensons Rural LLP on behalf of Mrs Pamela Husband, Ms Gill Eves and Mr Paul Bulmer
-
Deadline 5 Submission - Responses to the Examining Authority’s Further Written Questions (ExQ2)
(PDF, 4KB)
From Ainsty (2008) Internal Drainage Board
-
Deadline 5 Submission - Responses to the Examining Authority’s Further Written Questions (ExQ2)
(PDF, 315KB)
From North Yorkshire Council
-
Deadline 5 Submission - Responses to the Examining Authority’s Further Written Questions (ExQ2)
(PDF, 7KB)
From Stephensons Rural LLP on behalf of Benjamin Rab and Fiona Rab
-
Deadline 5 Submission - Responses to the Examining Authority’s Further Written Questions (ExQ2) and Protective Provisions
(PDF, 760KB)
From National Highways
-
Deadline 5 Submission - 8.18(B) Design Approach to Site Specific Infrastructure (Clean) - Final Issue B
(PDF, 6MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - Update regarding negotiations and Protective Provisions
(PDF, 108KB)
From National Gas Transmission Limited
-
Deadline 5 Submission - Responses to the Examining Authority’s Further Written Questions (ExQ2)
(PDF, 692KB)
From Network Rail Infrastructure Limited
-
Deadline 5 Submission - 9.3 Change Application: Book of Reference (Clean) - Final Issue A
(PDF, 10MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 8.18(B) Design Approach to Site Specific Infrastructure (Tracked) - Final Issue B
(PDF, 6MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 9.3 Change Application: Book of Reference (Tracked) - Final Issue A
(PDF, 10MB)
From National Grid Electricity Transmission (NGET)
-
Late Deadline 5 Submission - Accepted at the discretion of the Examining Authority. Responses to the Examining Authority's Further Written Questions (ExQ2) and Withdrawal of Objection [RR-026]
(PDF, 419KB)
From Lister Haigh on behalf of Simon Mills
-
Late Deadline 5 Submission - Accepted at the discretion of the Examining Authority. Responses to the Examining Authority's Further Written Questions (ExQ2) and Withdrawal of Objection [RR-021]
(PDF, 431KB)
From Lister Haigh on behalf of Chris Lister
-
Deadline 5 Submission - 9.1 Change Application: Report on Proposed Changes - Final Issue A
(PDF, 17MB)
From National Grid Electricity Transmission (NGET)
-
Late Deadline 5 Submission - Accepted at the discretion of the Examining Authority. Responses to the Examining Authority's Further Written Questions (ExQ2)
(PDF, 508KB)
From Lister Haigh on behalf of Richard Elliot
-
Late Deadline 5 Submission - Accepted at the discretion of the Examining Authority. Responses to the Examining Authority's Further Written Questions (ExQ2)
(PDF, 651KB)
From Lister Haigh on behalf of David Blacker and Marion Blacker
-
Late Deadline 5 Submission - Accepted at the discretion of the Examining Authority. Responses to the Examining Authority's Further Written Questions (ExQ2)
(PDF, 507KB)
From Lister Haigh on behalf of James Bell
-
Deadline 5 Submission - 5.4.8(C) Environmental Statement - Chapter 8 - Biodiversity Figures (Part 2 of 2)
(PDF, 23MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 8.5.9(C) Statement of Common Ground Between National Grid Electricity Transmission and National Trust Final Version 3 (Tracked)
(PDF, 1MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 8.5.9(C) Statement of Common Ground Between National Grid Electricity Transmission and National Trust Final Version 3 (Clean)
(PDF, 1MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 8.13(C) Summary of Actions and Engagement in Relation to the Traveller Community (Tracked) - Final Issue C
(PDF, 899KB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 8.5.3(C) Statement of Common Ground between National Grid Electricity Transmission plc and City of York Council Final Version 3 (Tracked)
(PDF, 1MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 8.23.7 Applicant's Deadline 5 Response to Issue Specific Hearing 2 (ISH2) Hearing Action Points - Final Issue A
(PDF, 920KB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 5.2.22 Environmental Statement Addendum (Consolidated) (Tracked) - Final Issue A
(PDF, 4MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 8.5.16(B) Statement of Common Ground Between National Grid Electricity Transmission and Foss Internal Drainage Board Final Version 2 (Tracked)
(PDF, 1MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 8.5.3(C) Statement of Common Ground between National Grid Electricity Transmission plc and City of York Council Final Version 3 (Clean)
(PDF, 1MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 8.5.6(B) Statement of Common Ground Between National Grid Electricity Transmission and Yorkshire Wildlife Trust Final Version 3 (Tracked)
(PDF, 1MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 8.5.15(B) Statement of Common Ground between National Grid Electricity Transmission plc and Canal & River Trust Final Version 2 (Tracked)
(PDF, 4MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 5.3.8B(D) Environmental Statement - Chapter 8 - Appendix 8B - Extended Phase 1 Habitat Survey Report (Tracked) - Final Issue D
(PDF, 3MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 8.5.8(B) Statement of Common Ground Between National Grid Electricity Transmission and Historic England Final Version 2 (Clean)
(PDF, 1MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 8.13(C) Summary of Actions and Engagement in Relation to the Traveller Community (Clean) - Final Issue C
(PDF, 897KB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 5.2.19(C) Environmental Statement Consolidated Errata (Clean) - Final Issue C
(PDF, 2MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 7.3 Details of Other Consents and Licences (Tracked) Final Issue B
(PDF, 983KB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 8.5.19(B) Statement of Common Ground between National Grid Electricity Transmission plc and National Gas Transmission plc Draft Version 2 (Tracked)
(PDF, 1MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 8.5.1(C) Statement of Commonality for Statements of Common Ground (Tracked) - Final Version C
(PDF, 1MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 3.2(D) Explanatory Memorandum (Clean) - Final Issue D
(PDF, 1MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 5.3.3B(C) Environmental Statement Chapter 3 - Appendix 3B - Code of Construction Practice (Clean) - Final Issue C
(PDF, 1MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 5.3.3F(B) Environmental Statement - Chapter 3 - Appendix 3F Construction Traffic Management Plan (Clean) - Final Issue B
(PDF, 45MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 5.2.22 Environmental Statement Addendum (Consolidated) (Clean) - Final Issue A
(PDF, 4MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 8.5.7(B) Statement of Common Ground Between National Grid Electricity Transmission and Environment Agency Draft Version 2 (Tracked)
(PDF, 1MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 8.5.12(B) Statement of Common Ground Between National Grid Electricity Transmission and Ainsty Internal Drainage Board Draft Version 2 (Clean)
(PDF, 1MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 8.5.13(B) Statement of Common Ground Between National Grid Electricity Transmission and Kyle and Upper Ouse Internal Drainage Board Final Version 2 (Tracked)
(PDF, 1MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 8.5.4(C) Statement of Common Ground between National Grid Electricity Transmission plc and Leeds City Council Draft Version 3 (Tracked)
(PDF, 2MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 8.23.9 Applicant's Deadline 5 Response to Issue Specific Hearing 3 (ISH3) Hearing Action Points - Final Issue A
(PDF, 988KB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 8.5.6(B) Statement of Common Ground Between National Grid Electricity Transmission and Yorkshire Wildlife Trust Final Version 3 (Clean)
(PDF, 1MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 5.4.8(C) Environmental Statement - Chapter 8 - Biodiversity Figures (Part 1 of 2)
(PDF, 12MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 8.23.8 Applicant's Deadline 5 Response to Compulsory Acquisition Hearing 1 (CAH1) Hearing Action Points - Final Issue A
(PDF, 1MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 8.5.15(B) Statement of Common Ground between National Grid Electricity Transmission plc and Canal & River Trust Final Version 2 (Clean)
(PDF, 4MB)
From National Grid Electricity Transmission (NGET)