Deadline 5 Submission - 8.14(C) Compulsory Acquisition and Temporary Possession Objections Schedule (Clean) - Final Issue C
(PDF, 34KB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 8.14(C) Compulsory Acquisition and Temporary Possession Objections Schedule (Tracked) - Final Issue C
(PDF, 34KB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - Responses to the Examining Authority’s Further Written Questions (ExQ2)
(PDF, 154KB)
From City of York Council
-
Deadline 5 Submission - Responses to the Examining Authority's Further Written Questions (ExQ2)
(PDF, 275KB)
From Carter Jonas LLP on behalf of Philip Watson
-
Deadline 5 Submission - Responses to the Examining Authority’s Further Written Questions (ExQ2)
(PDF, 4KB)
From Foss (2008) Internal Drainage Board
-
Deadline 5 Submission - Responses to the Examining Authority’s Further Written Questions (ExQ2)
(PDF, 505KB)
From Leeds City Council
-
Deadline 5 Submission - Responses to the Examining Authority’s Further Written Questions (ExQ2)
(PDF, 192KB)
From Kyle and Upper Ouse Internal Drainage Board
-
Deadline 5 Submission - Responses to the Examining Authority’s Further Written Questions (ExQ2) - Appendix A Article 54 and Protective Provisions for the Protection of Canal and River Trust included in draft DCO (Document 3.1(D)) submitted at Deadline 5
(PDF, 205KB)
From Canal & River Trust
-
Deadline 5 Submission - Copy of letter regarding Draft s106 Agreement
(PDF, 530KB)
From Leeds City Council
-
Deadline 5 Submission - Copy of letter to Applicant dated 16 February 2023
(PDF, 330KB)
From Historic England
-
Deadline 5 Submission - Responses to the Examining Authority's Further Written Questions (ExQ2)
(PDF, 170KB)
From Natural England
-
Deadline 5 Submission - Responses to the Examining Authority’s Further Written Questions (ExQ2)
(PDF, 583KB)
From Canal & River Trust
-
Deadline 5 Submission - Withdrawal of submissions [RR-016, RR-017]
(PDF, 209KB)
From George F White LLP on behalf of Mark Godliman and the Midgley Family
-
Deadline 5 Submission - Responses to the Examining Authority’s Further Written Questions (ExQ2)
(PDF, 5KB)
From Stephensons Rural LLP on behalf of Mrs Pamela Husband, Ms Gill Eves and Mr Paul Bulmer
-
Deadline 5 Submission - Responses to the Examining Authority’s Further Written Questions (ExQ2)
(PDF, 4KB)
From Ainsty (2008) Internal Drainage Board
-
Deadline 5 Submission - Responses to the Examining Authority’s Further Written Questions (ExQ2)
(PDF, 315KB)
From North Yorkshire Council
-
Deadline 5 Submission - Responses to the Examining Authority’s Further Written Questions (ExQ2)
(PDF, 7KB)
From Stephensons Rural LLP on behalf of Benjamin Rab and Fiona Rab
-
Deadline 5 Submission - Responses to the Examining Authority’s Further Written Questions (ExQ2) and Protective Provisions
(PDF, 760KB)
From National Highways
-
Deadline 5 Submission - 8.18(B) Design Approach to Site Specific Infrastructure (Clean) - Final Issue B
(PDF, 6MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - Update regarding negotiations and Protective Provisions
(PDF, 108KB)
From National Gas Transmission Limited
-
Deadline 5 Submission - Responses to the Examining Authority’s Further Written Questions (ExQ2)
(PDF, 692KB)
From Network Rail Infrastructure Limited
-
Deadline 5 Submission - 8.18(B) Design Approach to Site Specific Infrastructure (Tracked) - Final Issue B
(PDF, 6MB)
From National Grid Electricity Transmission (NGET)
-
Late Deadline 5 Submission - Accepted at the discretion of the Examining Authority. Responses to the Examining Authority's Further Written Questions (ExQ2) and Withdrawal of Objection [RR-026]
(PDF, 419KB)
From Lister Haigh on behalf of Simon Mills
-
Late Deadline 5 Submission - Accepted at the discretion of the Examining Authority. Responses to the Examining Authority's Further Written Questions (ExQ2) and Withdrawal of Objection [RR-021]
(PDF, 431KB)
From Lister Haigh on behalf of Chris Lister
-
Deadline 5 Submission - 9.1 Change Application: Report on Proposed Changes - Final Issue A
(PDF, 17MB)
From National Grid Electricity Transmission (NGET)
-
Late Deadline 5 Submission - Accepted at the discretion of the Examining Authority. Responses to the Examining Authority's Further Written Questions (ExQ2)
(PDF, 508KB)
From Lister Haigh on behalf of Richard Elliot
-
Late Deadline 5 Submission - Accepted at the discretion of the Examining Authority. Responses to the Examining Authority's Further Written Questions (ExQ2)
(PDF, 651KB)
From Lister Haigh on behalf of David Blacker and Marion Blacker
-
Late Deadline 5 Submission - Accepted at the discretion of the Examining Authority. Responses to the Examining Authority's Further Written Questions (ExQ2)
(PDF, 507KB)
From Lister Haigh on behalf of James Bell
-
Deadline 5 Submission - 5.4.8(C) Environmental Statement - Chapter 8 - Biodiversity Figures (Part 2 of 2)
(PDF, 23MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 8.5.9(C) Statement of Common Ground Between National Grid Electricity Transmission and National Trust Final Version 3 (Tracked)
(PDF, 1MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 8.5.9(C) Statement of Common Ground Between National Grid Electricity Transmission and National Trust Final Version 3 (Clean)
(PDF, 1MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 8.13(C) Summary of Actions and Engagement in Relation to the Traveller Community (Tracked) - Final Issue C
(PDF, 899KB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 8.5.3(C) Statement of Common Ground between National Grid Electricity Transmission plc and City of York Council Final Version 3 (Tracked)
(PDF, 1MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 8.23.7 Applicant's Deadline 5 Response to Issue Specific Hearing 2 (ISH2) Hearing Action Points - Final Issue A
(PDF, 920KB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 5.2.22 Environmental Statement Addendum (Consolidated) (Tracked) - Final Issue A
(PDF, 4MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 8.5.16(B) Statement of Common Ground Between National Grid Electricity Transmission and Foss Internal Drainage Board Final Version 2 (Tracked)
(PDF, 1MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 8.5.3(C) Statement of Common Ground between National Grid Electricity Transmission plc and City of York Council Final Version 3 (Clean)
(PDF, 1MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 8.5.6(B) Statement of Common Ground Between National Grid Electricity Transmission and Yorkshire Wildlife Trust Final Version 3 (Tracked)
(PDF, 1MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 8.5.15(B) Statement of Common Ground between National Grid Electricity Transmission plc and Canal & River Trust Final Version 2 (Tracked)
(PDF, 4MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 5.3.8B(D) Environmental Statement - Chapter 8 - Appendix 8B - Extended Phase 1 Habitat Survey Report (Tracked) - Final Issue D
(PDF, 3MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 8.5.8(B) Statement of Common Ground Between National Grid Electricity Transmission and Historic England Final Version 2 (Clean)
(PDF, 1MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 8.13(C) Summary of Actions and Engagement in Relation to the Traveller Community (Clean) - Final Issue C
(PDF, 897KB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 5.2.19(C) Environmental Statement Consolidated Errata (Clean) - Final Issue C
(PDF, 2MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 7.3 Details of Other Consents and Licences (Tracked) Final Issue B
(PDF, 983KB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 8.5.19(B) Statement of Common Ground between National Grid Electricity Transmission plc and National Gas Transmission plc Draft Version 2 (Tracked)
(PDF, 1MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 8.5.1(C) Statement of Commonality for Statements of Common Ground (Tracked) - Final Version C
(PDF, 1MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 3.2(D) Explanatory Memorandum (Clean) - Final Issue D
(PDF, 1MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 5.3.3B(C) Environmental Statement Chapter 3 - Appendix 3B - Code of Construction Practice (Clean) - Final Issue C
(PDF, 1MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 5.3.3F(B) Environmental Statement - Chapter 3 - Appendix 3F Construction Traffic Management Plan (Clean) - Final Issue B
(PDF, 45MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 5.2.22 Environmental Statement Addendum (Consolidated) (Clean) - Final Issue A
(PDF, 4MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 8.5.7(B) Statement of Common Ground Between National Grid Electricity Transmission and Environment Agency Draft Version 2 (Tracked)
(PDF, 1MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 8.5.12(B) Statement of Common Ground Between National Grid Electricity Transmission and Ainsty Internal Drainage Board Draft Version 2 (Clean)
(PDF, 1MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 8.5.13(B) Statement of Common Ground Between National Grid Electricity Transmission and Kyle and Upper Ouse Internal Drainage Board Final Version 2 (Tracked)
(PDF, 1MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 8.5.4(C) Statement of Common Ground between National Grid Electricity Transmission plc and Leeds City Council Draft Version 3 (Tracked)
(PDF, 2MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 8.23.9 Applicant's Deadline 5 Response to Issue Specific Hearing 3 (ISH3) Hearing Action Points - Final Issue A
(PDF, 988KB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 8.5.6(B) Statement of Common Ground Between National Grid Electricity Transmission and Yorkshire Wildlife Trust Final Version 3 (Clean)
(PDF, 1MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 5.4.8(C) Environmental Statement - Chapter 8 - Biodiversity Figures (Part 1 of 2)
(PDF, 12MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 8.23.8 Applicant's Deadline 5 Response to Compulsory Acquisition Hearing 1 (CAH1) Hearing Action Points - Final Issue A
(PDF, 1MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 8.5.15(B) Statement of Common Ground between National Grid Electricity Transmission plc and Canal & River Trust Final Version 2 (Clean)
(PDF, 4MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 8.5.10(B) Statement of Common Ground Between National Grid Electricity Transmission plc and Northern Powergrid (Yorkshire) plc and Northern Powergrid (Northeast) plc Final Version 2 (Tracked)
(PDF, 4MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 8.25.1 Applicant's Response to Examining Authority's Second Written Questions (ExQ2) - Final Issue A
(PDF, 1MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 8.5.2(C) Statement of Common Ground between National Grid Electricity Transmission plc and North Yorkshire Council Draft Version 3 (Clean)
(PDF, 2MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - Document 8.5.18(C) Statement of Common Ground between National Grid Electricity Transmission plc and EE Limited and Hutchison 3G UK Limited Final Version 3 (Tracked)
(PDF, 1MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 8.5.19(B) Statement of Common Ground between National Grid Electricity Transmission plc and National Gas Transmission plc Draft Version 2 (Clean)
(PDF, 1MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 8.5.20(B) Statement of Common Ground between National Grid Electricity Transmission plc and Northern Gas Networks Limited Draft Version 2 (Clean)
(PDF, 1MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 7.3 Details of Other Consents and Licences (Clean) - Final Issue B
(PDF, 977KB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 8.5.8(B) Statement of Common Ground Between National Grid Electricity Transmission and Historic England Final Version 2 (Tracked)
(PDF, 1MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 5.3.8B(D) Environmental Statement - Chapter 8 - Appendix 8B - Extended Phase 1 Habitat Survey Report (Clean) - Final Issue D
(PDF, 3MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 5.2.19(C) Environmental Statement Consolidated Errata (Tracked) - Final Issue C
(PDF, 2MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - Document 9.4 Change Application: Flood Risk Assessment (Clean) - Final Issue A
(PDF, 27MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 8.5.21(B) Statement of Common Ground Between National Grid Electricity Transmission and Yorkshire Water Final Version 2 (Clean)
(PDF, 1MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 8.27.1 Application under section 127 and 138 Planning Act 2008 – Network Rail Infrastructure Limited - Final Issue A
(PDF, 985KB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 4.1(D) Statement of Reasons Appendix B – Schedule of Negotiations with Land Interests (Clean) - Final Issue D
(PDF, 1MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 8.5.10(B) Statement of Common Ground Between National Grid Electricity Transmission plc and Northern Powergrid (Yorkshire) plc and Northern Powergrid (Northeast) plc Final Version 2 (Clean)
(PDF, 1MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 1.3(G) Navigation Document and Application Guide (Tracked) - Final Issue G
(PDF, 2MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 8.5.17(B) Statement of Common Ground between National Grid Electricity Transmission plc and Cellnex UK Limited Final Version 2 (Clean)
(PDF, 4MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - Cover letter
(PDF, 256KB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 8.5.2(C) Statement of Common Ground between National Grid Electricity Transmission plc and North Yorkshire Council Draft Version 3 (Tracked)
(PDF, 2MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 5.3.3F(B) Environmental Statement - Chapter 3 - Appendix 3F Construction Traffic Management Plan (Tracked) - Final Issue B
(PDF, 45MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 8.5.5(B) Statement of Common Ground Between National Grid Electricity Transmission and Natural England Final Version 2 (Clean)
(PDF, 1MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 9.2 Change Application: Plans and Drawings - Final Issue A
(PDF, 37MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 8.5.7(B) Statement of Common Ground Between National Grid Electricity Transmission and Environment Agency Draft Version 2 (Clean)
(PDF, 1MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 8.25.2 Applicant's Response to Examining Authority's Second Written Questions (ExQ2) Appendices - Final Issue A
(PDF, 19MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 8.5.12(B) Statement of Common Ground Between National Grid Electricity Transmission and Ainsty Internal Drainage Board Draft Version 2 (Tracked)
(PDF, 1MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 8.5.4(C) Statement of Common Ground between National Grid Electricity Transmission plc and Leeds City Council Draft Version 3 (Clean)
(PDF, 2MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 8.5.5(B) Statement of Common Ground Between National Grid Electricity Transmission and Natural England Final Version 2 (Tracked)
(PDF, 4MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 8.5.17(B) Statement of Common Ground between National Grid Electricity Transmission plc and Cellnex UK Limited Final Version 2 (Tracked)
(PDF, 1MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 5.3.3B(C) Environmental Statement - Chapter 3 - Appendix 3B - Code of Construction Practice (Tracked) - Final Issue C
(PDF, 1MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 8.5.16(B) Statement of Common Ground Between National Grid Electricity Transmission and Foss Internal Drainage Board Final Version 2 (Clean)
(PDF, 1MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 8.1(C) Schedule of Changes to the Draft Development Consent Order - Final Issue C
(PDF, 2MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 8.5.18(C) Statement of Common Ground between National Grid Electricity Transmission plc and EE Limited and Hutchison 3G UK Limited Final Version 3 (Clean)
(PDF, 1MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 8.5.11(C) Statement of Common Ground between National Grid and Network Rail Infrastructure Limited Draft Version 3 (Tracked)
(PDF, 1MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 3.1(D) Draft Development Consent Order (Clean) - Final Issue D
(PDF, 2MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 8.27.2 Application under section 127 and 138 Planning Act 2008 – National Highways Limited - Final Issue A
(PDF, 988KB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 1.3(G) Navigation Document and Application Guide (Clean) - Final Issue G
(PDF, 2MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 8.5.1(C) Statement of Commonality for Statements of Common Ground Final Version C (Clean)
(PDF, 1MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 8.27.4 Application under section 127 and 138 Planning Act 2008 – Northern Gas Networks Limited - Final Issue A
(PDF, 990KB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 3.2(D) Explanatory Memorandum (Tracked) - Final Issue D
(PDF, 2MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 8.24 Applicant's Comments on Interested Parties' Deadline 4 Submissions
(PDF, 4MB)
From National Grid Electricity Transmission (NGET)
-
Deadline 5 Submission - 8.5.20(B) Statement of Common Ground between National Grid Electricity Transmission plc and Northern Gas Networks Limited Draft Version 2 (Tracked)
(PDF, 1MB)
From National Grid Electricity Transmission (NGET)