View examination library (PDF, 312KB) containing document reference numbers
-
Section 56 Notice
(PDF, 186KB)
From Morgan Offshore Wind Limited and Morecambe Offshore Windfarm Limited
-
Response to s51 advice - B16 Onshore Historic or Scheduled Monument Sites Plan - Subject to acceptance at the discretion of the Examining Authority once appointed
(PDF, 26MB)
From Morgan Offshore Wind Limited and Morecambe Offshore Windfarm Limited
-
Response to s51 advice - F.1.5.3 ES Volume 1, Annex 5.3: Commitments Register (Tracked) - Subject to acceptance at the discretion of the Examining Authority once appointed
(PDF, 2MB)
From Morgan Offshore Wind Limited and Morecambe Offshore Windfarm Limited
-
Response to s51 advice - F1.3 ES Volume 1, Chapter 3: Project description (Tracked) - Subject to acceptance at the discretion of the Examining Authority once appointed
(PDF, 2MB)
From Morgan Offshore Wind Limited and Morecambe Offshore Windfarm Limited
-
Response to s51 advice - F2.10 ES Volume 2: Figures Part 4 of 5 - Subject to acceptance at the discretion of the Examining Authority once appointed
(PDF, 33MB)
From Morgan Offshore Wind Limited and Morecambe Offshore Windfarm Limited
-
Response to s51 advice - F1.4 ES Volume 1, Chapter 4: Site selection and consideration of alternatives (Clean) - Subject to acceptance at the discretion of the Examining Authority once appointed
(PDF, 2MB)
From Morgan Offshore Wind Limited and Morecambe Offshore Windfarm Limited
-
Response to s51 advice - F1 Non-Technical Summary (Clean) - Subject to acceptance at the discretion of the Examining Authority once appointed
(PDF, 19MB)
From Morgan Offshore Wind Limited and Morecambe Offshore Windfarm Limited
-
Response to s51 advice - 2.8 ES Volume 2, Chapter 8: Marine archaeology (Tracked) - Subject to acceptance at the discretion of the Examining Authority once appointed
(PDF, 1MB)
From Morgan Offshore Wind Limited and Morecambe Offshore Windfarm Limited
-
Response to s51 advice – J1.8 Outline Spillage and Emergency Response Plan (Tracked) – Subject to acceptance at the discretion of the Examining Authority once appointed
(PDF, 663KB)
From Morgan Offshore Wind Limited and Morecambe Offshore Windfarm Limited
-
Response to s51 advice - 2.8 ES Volume 2, Chapter 8: Marine archaeology (Clean) - Subject to acceptance at the discretion of the Examining Authority once appointed
(PDF, 1MB)
From Morgan Offshore Wind Limited and Morecambe Offshore Windfarm Limited
-
Response to s51 advice - J11 Onshore Biodiversity Benefit Statement (Clean) - Subject to acceptance at the discretion of the Examining Authority once appointed
(PDF, 4MB)
From Morgan Offshore Wind Limited and Morecambe Offshore Windfarm Limited
-
Response to s51 advice - B14 Onshore Statutory and Non-Statutory Nature Conservation Sites - Subject to acceptance at the discretion of the Examining Authority once appointed
(PDF, 14MB)
From Morgan Offshore Wind Limited and Morecambe Offshore Windfarm Limited
-
Response to s51 advice - B13 Public Rights of Way Plan - Subject to acceptance at the discretion of the Examining Authority once appointed
(PDF, 52MB)
From Morgan Offshore Wind Limited and Morecambe Offshore Windfarm Limited
-
Response to s51 advice - F1.4.3 ES Volume 1, Annex 4.3: Selection and Refinement of Onshore Infrastructure (Clean) - Subject to acceptance at the discretion of the Examining Authority once appointed
(PDF, 19MB)
From Morgan Offshore Wind Limited and Morecambe Offshore Windfarm Limited
-
Response to s51 advice - F1.5.3 ES Volume 1, Annex 5.3: Commitments Register (Clean) - Subject to acceptance at the discretion of the Examining Authority once appointed
(PDF, 2MB)
From Morgan Offshore Wind Limited and Morecambe Offshore Windfarm Limited
-
Response to s51 advice - F1 Non-Technical Summary (Tracked) - Subject to acceptance at the discretion of the Examining Authority once appointed
(PDF, 19MB)
From Morgan Offshore Wind Limited and Morecambe Offshore Windfarm Limited
-
Response to s51 advice - F2.10 ES Volume 2: Figures Part 1 of 5 - Subject to acceptance at the discretion of the Examining Authority once appointed
(PDF, 38MB)
From Morgan Offshore Wind Limited and Morecambe Offshore Windfarm Limited
-
Response to s51 advice - F2.8.1 ES Volume 2, Annex 8.1: Marine archaeology technical report (Tracked) - Subject to acceptance at the discretion of the Examining Authority once appointed
(PDF, 5MB)
From Morgan Offshore Wind Limited and Morecambe Offshore Windfarm Limited
-
Response to s51 advice - B8 Works Plans - Onshore and Intertidal Part 2 of 2 - Subject to acceptance at the discretion of the Examining Authority once appointed
(PDF, 11MB)
From Morgan Offshore Wind Limited and Morecambe Offshore Windfarm Limited
-
Response to s51 advice – F3.2.3 ES Volume 3, Annex 2.3: Flood risk assessment Part 2 of 3 (Clean) – Subject to acceptance at the discretion of the Examining Authority once appointed
(PDF, 49MB)
From Morgan Offshore Wind Limited and Morecambe Offshore Windfarm Limited
-
Response to s51 advice – J8 Outline Highway Access Management Plan (Clean) – Subject to acceptance at the discretion of the Examining Authority once appointed
(PDF, 13MB)
From Morgan Offshore Wind Limited and Morecambe Offshore Windfarm Limited
-
Response to s51 advice – J1.8 Outline Spillage and Emergency Response Plan (Clean) – Subject to acceptance at the discretion of the Examining Authority once appointed
(PDF, 1MB)
From Morgan Offshore Wind Limited and Morecambe Offshore Windfarm Limited
-
Response to s51 advice - F1.4.3 ES Volume 1, Annex 4.3: Selection and Refinement of Onshore Infrastructure (Tracked) - Subject to acceptance at the discretion of the Examining Authority once appointed
(PDF, 20MB)
From Morgan Offshore Wind Limited and Morecambe Offshore Windfarm Limited
-
Response to s51 advice - F2.8.1 ES Volume 2, Annex 8.1: Marine archaeology technical report (Clean) - Subject to acceptance at the discretion of the Examining Authority once appointed
(PDF, 16MB)
From Morgan Offshore Wind Limited and Morecambe Offshore Windfarm Limited
-
Response to s51 advice - F2.10 ES Volume 2: Figures Part 3 of 5 - Subject to acceptance at the discretion of the Examining Authority once appointed
(PDF, 52MB)
From Morgan Offshore Wind Limited and Morecambe Offshore Windfarm Limited
-
Response to s51 advice - J11 Onshore Biodiversity Benefit Statement (Tracked) - Subject to acceptance at the discretion of the Examining Authority once appointed
(PDF, 8MB)
From Morgan Offshore Wind Limited and Morecambe Offshore Windfarm Limited
-
Response to s51 advice - F3.2.3 ES Volume 3, Annex 2.3: Flood risk assessment - Part 2 of 3 (Tracked) - Subject to acceptance at the discretion of the Examining Authority once appointed
(PDF, 51MB)
From Morgan Offshore Wind Limited and Morecambe Offshore Windfarm Limited
-
Response to s51 advice - D2 Statement of Reasons (Clean) - Subject to acceptance at the discretion of the Examining Authority once appointed
(PDF, 1MB)
From Morgan Offshore Wind Limited and Morecambe Offshore Windfarm Limited
-
Response to s51 advice - D3 Book of Reference (Tracked) - Subject to acceptance at the discretion of the Examining Authority once appointed
(PDF, 50MB)
From Morgan Offshore Wind Limited and Morecambe Offshore Windfarm Limited
-
Response to s51 advice – J1.5 Outline Public Rights of Way (PRoW) Management Plan (Tracked) – Subject to acceptance at the discretion of the Examining Authority once appointed
(PDF, 21MB)
From Morgan Offshore Wind Limited and Morecambe Offshore Windfarm Limited
-
Response to s51 advice – F3.2.3 ES Volume 3, Annex 2.3: Flood risk assessment Part 1 of 3 (Tracked) – Subject to acceptance at the discretion of the Examining Authority once appointed
(PDF, 35MB)
From Morgan Offshore Wind Limited and Morecambe Offshore Windfarm Limited
-
Response to s51 advice – F3.2.3 ES Volume 3, Annex 2.3: Flood risk assessment Part 1 of 3 (Clean) – Subject to acceptance at the discretion of the Examining Authority once appointed
(PDF, 51MB)
From Morgan Offshore Wind Limited and Morecambe Offshore Windfarm Limited
-
Response to s51 advice - D2 Statement of Reasons (Tracked) - Subject to acceptance at the discretion of the Examining Authority once appointed
(PDF, 2MB)
From Morgan Offshore Wind Limited and Morecambe Offshore Windfarm Limited
-
Response to s51 advice - Schedule of Changes to BoR - Subject to acceptance at the discretion of the Examining Authority once appointed
(PDF, 618KB)
From Morgan Offshore Wind Limited and Morecambe Offshore Windfarm Limited
-
Response to s51 advice - B8 Works Plans - Onshore and Intertidal Part 1 of 2 - Subject to acceptance at the discretion of the Examining Authority once appointed
(PDF, 18MB)
From Morgan Offshore Wind Limited and Morecambe Offshore Windfarm Limited
-
Response to s51 advice – J1.5 Outline Public Rights of Way (PRoW) Management Plan (Clean) – Subject to acceptance at the discretion of the Examining Authority once appointed
(PDF, 10MB)
From Morgan Offshore Wind Limited and Morecambe Offshore Windfarm Limited
-
Response to s51 advice - B9 Works Plans - Offshore - Subject to acceptance at the discretion of the Examining Authority once appointed
(PDF, 4MB)
From Morgan Offshore Wind Limited and Morecambe Offshore Windfarm Limited
-
Response to s51 advice – F3.2.3 Volume 3, Annex 2.3: Flood risk assessment - part 3 of 3 (Clean) – Subject to acceptance at the discretion of the Examining Authority once appointed
(PDF, 31MB)
From Morgan Offshore Wind Limited and Morecambe Offshore Windfarm Limited
-
Response to s51 advice – Response to Section 51 advice – Subject to acceptance at the discretion of the Examining Authority once appointed
(PDF, 277KB)
From Morgan Offshore Wind Limited and Morecambe Offshore Windfarm Limited
-
Response to s51 advice - C3 Explanatory Memorandum (Clean) - Subject to acceptance at the discretion of the Examining Authority once appointed
(PDF, 1MB)
From Morgan Offshore Wind Limited and Morecambe Offshore Windfarm Limited
-
Response to s51 advice - Schedule of Changes to draft DCO - Subject to acceptance at the discretion of the Examining Authority once appointed
(PDF, 594KB)
From Morgan Offshore Wind Limited and Morecambe Offshore Windfarm Limited
-
Response to s51 advice – F3.2.3 Volume 3, Annex 2.3: Flood risk assessment - part 3 of 3 (Tracked) – Subject to acceptance at the discretion of the Examining Authority once appointed
(PDF, 42MB)
From Morgan Offshore Wind Limited and Morecambe Offshore Windfarm Limited
-
Response to s51 advice - F1.3 ES Volume 1, Chapter 3: Project description (Clean) - Subject to acceptance at the discretion of the Examining Authority once appointed
(PDF, 2MB)
From Morgan Offshore Wind Limited and Morecambe Offshore Windfarm Limited
-
Response to s51 advice - F1.4 ES Volume 1, Chapter 4: Site selection and consideration of alternatives (Tracked) - Subject to acceptance at the discretion of the Examining Authority once appointed
(PDF, 2MB)
From Morgan Offshore Wind Limited and Morecambe Offshore Windfarm Limited
-
Response to s51 advice - F2.10 ES Volume 2: Figures Part 5 of 5 - Subject to acceptance at the discretion of the Examining Authority once appointed
(PDF, 27MB)
From Morgan Offshore Wind Limited and Morecambe Offshore Windfarm Limited
-
Response to s51 advice - B17 Offshore Historic Environment Plan - Subject to acceptance at the discretion of the Examining Authority once appointed
(PDF, 5MB)
From Morgan Offshore Wind Limited and Morecambe Offshore Windfarm Limited
-
Response to s51 advice - A4 Application guide (Tracked) - Subject to acceptance at the discretion of the Examining Authority once appointed
(PDF, 402KB)
From Morgan Offshore Wind Limited and Morecambe Offshore Windfarm Limited
-
Response to s51 advice – J8 Outline Highway Access Management Plan (Tracked) – Subject to acceptance at the discretion of the Examining Authority once appointed
(PDF, 15MB)
From Morgan Offshore Wind Limited and Morecambe Offshore Windfarm Limited
-
Response to s51 advice - B7 Works Plans - Onshore and Offshore Part 1 of 2 - Subject to acceptance at the discretion of the Examining Authority once appointed
(PDF, 39MB)
From Morgan Offshore Wind Limited and Morecambe Offshore Windfarm Limited
-
Response to s51 advice - B7 Works Plans - Onshore and Offshore Part 2 of 2 - Subject to acceptance at the discretion of the Examining Authority once appointed
(PDF, 25MB)
From Morgan Offshore Wind Limited and Morecambe Offshore Windfarm Limited
-
Response to s51 advice - C3 Explanatory Memorandum (Tracked) - Subject to acceptance at the discretion of the Examining Authority once appointed
(PDF, 1MB)
From Morgan Offshore Wind Limited and Morecambe Offshore Windfarm Limited
-
Response to s51 advice - D3 Book of Reference (Clean) - Subject to acceptance at the discretion of the Examining Authority once appointed
(PDF, 28MB)
From Morgan Offshore Wind Limited and Morecambe Offshore Windfarm Limited
-
Response to s51 advice - J2 Outline Landscape Management Plan (Tracked) - Subject to acceptance at the discretion of the Examining Authority once appointed
(PDF, 6MB)
From Morgan Offshore Wind Limited and Morecambe Offshore Windfarm Limited
-
Response to s51 advice - J2 Outline Landscape Management Plan (Clean) - Subject to acceptance at the discretion of the Examining Authority once appointed
(PDF, 4MB)
From Morgan Offshore Wind Limited and Morecambe Offshore Windfarm Limited
-
Response to s51 advice - C1 Draft Development Consent Order including Draft Deemed Marine Licences (Clean) - Subject to acceptance at the discretion of the Examining Authority once appointed
(PDF, 4MB)
From Morgan Offshore Wind Limited and Morecambe Offshore Windfarm Limited
-
Response to s51 advice - B10 Land Plan - Onshore - Subject to acceptance at the discretion of the Examining Authority once appointed
(PDF, 34MB)
From Morgan Offshore Wind Limited and Morecambe Offshore Windfarm Limited
-
Response to s51 advice - A4 Application guide (Clean) - Subject to acceptance at the discretion of the Examining Authority once appointed
(PDF, 875KB)
From Morgan Offshore Wind Limited and Morecambe Offshore Windfarm Limited
-
Response to s51 advice - C1 Draft Development Consent Order including Draft Deemed Marine Licences (Tracked) - Subject to acceptance at the discretion of the Examining Authority once appointed
(PDF, 4MB)
From Morgan Offshore Wind Limited and Morecambe Offshore Windfarm Limited
-
Examination Library
(PDF, 312KB)
From Examination Library
-
Adequacy of Consultation Representation
(PDF, 162KB)
From Blackpool Council
-
Adequacy of Consultation Representation
(PDF, 167KB)
From Chorley Council
-
Adequacy of Consultation Representation
(PDF, 167KB)
From Wyre Borough Council
-
Adequacy of Consultation Representation
(PDF, 96KB)
From St. Helens Council
-
Notification of Decision to Accept Application
(PDF, 138KB)
-
Adequacy of Consultation Representation
(PDF, 31KB)
From Fylde Borough Council
-
Adequacy of Consultation Representation
(PDF, 248KB)
From Bradford Council
-
Adequacy of Consultation Representation
(PDF, 97KB)
From Sefton MBC
-
Adequacy of Consultation Representation
(PDF, 162KB)
From Wyre Council
-
Section 51 advice to the Applicant
(PDF, 174KB)
-
Adequacy of Consultation Representation
(PDF, 94KB)
From South Ribble Borough Council
-
Adequacy of Consultation Representation
(PDF, 167KB)
From Bolton Council
-
Adequacy of Consultation Representation
(PDF, 162KB)
From Blackburn with Darwen Borough Council
-
A3 Application Form
(PDF, 2MB)
From Morgan Offshore Wind Limited and Morecambe Offshore Windfarm Limited
-
Acceptance checklist (s55)
(PDF, 356KB)
-
F1.5.1 Volume 1, Annex 5.1: Human health
(PDF, 2MB)
From Morgan Offshore Wind Limited and Morecambe Offshore Windfarm Limited
-
F2.1.1 Volume 2, Annex 1.1: Physical processes associated modelling studies – Part 2 of 2
(PDF, 39MB)
From Morgan Offshore Wind Limited and Morecambe Offshore Windfarm Limited
-
F3.3.11 Volume 3, Annex 3.11: Bat roost survey technical report
(PDF, 11MB)
From Morgan Offshore Wind Limited and Morecambe Offshore Windfarm Limited
-
E1.8 Consultation Report Annex - Statutory Consultation 12 October - 23 November 2023 (Part 1 of 2)
(PDF, 36MB)
From Morgan Offshore Wind Limited and Morecambe Offshore Windfarm Limited
-
E1.13 Consultation Report Annex - Duty to publicise under section 48 of the Planning Act 2008
(PDF, 18MB)
From Morgan Offshore Wind Limited and Morecambe Offshore Windfarm Limited
-
A1 Cover Letter
(PDF, 225KB)
From Morgan Offshore Wind Limited and Morecambe Offshore Windfarm Limited
-
F2.7.1 Volume 2, Annex 7.1: Navigation risk assessment – Part 1 of 2
(PDF, 47MB)
From Morgan Offshore Wind Limited and Morecambe Offshore Windfarm Limited
-
E1.9 Consultation Report Annex - Consultation under section 42 of the Planning Act 2008
(PDF, 1MB)
From Morgan Offshore Wind Limited and Morecambe Offshore Windfarm Limited
-
E1.7 Consultation Report Annex - Statutory consultation - section 47 consultee list
(PDF, 600KB)
From Morgan Offshore Wind Limited and Morecambe Offshore Windfarm Limited
-
E1.2 Consultation Report Annex - Consultation compliance checklist
(PDF, 876KB)
From Morgan Offshore Wind Limited and Morecambe Offshore Windfarm Limited
-
F1.3 Volume 1, Chapter 3: Project description
(PDF, 2MB)
From Morgan Offshore Wind Limited and Morecambe Offshore Windfarm Limited
-
Adequacy of Consultation Representation
(PDF, 168KB)
From Lancashire County Council
-
Adequacy of Consultation Representation
(PDF, 162KB)
From Bury Council
-
Adequacy of Consultation Representation
(PDF, 162KB)
From Preston City Council
-
Adequacy of Consultation Representation
(PDF, 302KB)
From Calderdale
-
E1.11 Consultation Report Annex - Targeted Statutory Consultation
(PDF, 13MB)
From Morgan Offshore Wind Limited and Morecambe Offshore Windfarm Limited
-
F3.3.14 Volume 3, Annex 3.14: Invasive non-native species technical report
(PDF, 9MB)
From Morgan Offshore Wind Limited and Morecambe Offshore Windfarm Limited
-
E1.15 Consultation Report Annex - Planning Inspectorate Regulation 32 transboundary consultation
(PDF, 5MB)
From Morgan Offshore Wind Limited and Morecambe Offshore Windfarm Limited
-
E1.16 Consultation Report Annex - Statutory consultation summary of responses and Applicants’ regard (Part 2 of 2)
(PDF, 11MB)
From Morgan Offshore Wind Limited and Morecambe Offshore Windfarm Limited
-
F2.2 Volume 2, Chapter 2: Benthic subtidal and intertidal ecology
(PDF, 4MB)
From Morgan Offshore Wind Limited and Morecambe Offshore Windfarm Limited
-
F3.11 Volume 3, Chapter 11: Aviation and radar
(PDF, 1MB)
From Morgan Offshore Wind Limited and Morecambe Offshore Windfarm Limited
-
E1.12 Consultation Report Annex - Duty to notify the Secretary of State under section 46 of the Planning Act 2008
(PDF, 2MB)
From Morgan Offshore Wind Limited and Morecambe Offshore Windfarm Limited
-
F1.3.1 Volume 1, Annex 3.1: Offshore Crossing Schedule
(PDF, 1MB)
From Morgan Offshore Wind Limited and Morecambe Offshore Windfarm Limited
-
F2.10 Volume 2, Figures - Part 4 of 5
(PDF, 34MB)
From Morgan Offshore Wind Limited and Morecambe Offshore Windfarm Limited
-
F1.5.2 Volume 1, Annex 5.2: Underwater sound technical report
(PDF, 2MB)
From Morgan Offshore Wind Limited and Morecambe Offshore Windfarm Limited
-
E1.10 Consultation Report Annex - Statutory consultation - Landowner engagement under section 44 of the Planning Act 2008
(PDF, 7MB)
From Morgan Offshore Wind Limited and Morecambe Offshore Windfarm Limited