After the original 13 proposals were reduced down to the two bridge proposals in summer 2018, Pains Hill residents have not been part of the consultation process and yet during that time the new access point onto the slip road was put forward as the favoured proposal. The earlier proposal of a bridge over the A3 is fundamentally a better alternative on the grounds of security and safety in that it is potentially dangerous to have an entrance to a new access road off the slip road so close to the Pains Hill roundabout.In the alternative, there are other proposals that have been dismissed that would have had less adverse effects on the Pains Hill Grade 1 landscape. The proposed scheme negates the security of the Pains Hill estate and the security and the economic viability of Pains Hill Park.