16 Tachwedd 2022

The Secretary of State has today granted development consent for this application. For further information please refer to the following decision documentation:

16 Tachwedd 2022

Decision made by the Secretary of State

10 Hydref 2022

The Secretary of State has exercised their discretion to accept further late submissions from the Applicant (PDF, 152 KB) and DWF Law LLP on behalf of Severn Trent Water (PDF, 368 KB) in response to the Secretary of State’s consultation letter of 2 September 2022 (PDF, 135 KB). This is in addition to the late responses previously published from both parties dated 30 September 2022.

7 Hydref 2022

The Secretary of State has exercised their discretion to accept late submissions from the Applicant (PDF, 120 KB) and DWF Law LLP on behalf of Severn Trent Water (PDF, 279 KB) in response to the Secretary of State’s consultation letter of 2 September 2022 (PDF, 135 KB).

2 Medi 2022

The Secretary of State for the Department for Transport has written to the Applicant and Severn Trent Water (PDF, 135 KB) seeking further information.

The deadline for responses is 16 September 2022.

16 Awst 2022

Recommendations given by the Planning Inspectorate

18 Mai 2022

The Deadline 9 submissions have been published.

The Examination closed at 23:59 on 16 May 2022. Notification of the completion of the Examination (PDF, 96 KB) has been issued.

If you have any questions, please contact the Case Team: A417MissingLink@planninginspectorate.gov.uk.

16 Mai 2022

The Examination closed at 23:59 on 16 May 2022.

10 Mai 2022

The Deadline 8 submissions have been published.

The Examining Authority (ExA) has issued a Rule 17 – Request for Further Information (PDF, 115 KB) to the Applicant. The ExA requires a response to this request by Deadline 9 (16 May 2022).

4 Mai 2022

The video recordings and transcripts from Compulsory Acquisition Hearing 3 (CAH3), Issue Specific Hearing 5 (ISH5) and Open Floor Hearing 2 (OFH2) have been published.

29 Ebrill 2022

No submissions were received in respect of Deadline 7a.

The video recordings and transcripts from Compulsory Acquisition Hearing 3 (CAH3), Issue Specific Hearing 5 (ISH5) and Open Floor Hearing 2 (OFH2) will be published on the project webpage shortly.

The Action Points arising from CAH3 (PDF, 83 KB) have been published.

28 Ebrill 2022

Instructions for those wishing to participate in Compulsory Acquisition Hearing 3 (CAH3), Issue Specific Hearing 5 (ISH5) and Open Floor Hearing 2 (OFH2) have been sent. These Hearings will take place during the same virtual event.

The Livestream of CAH3, ISH5 and OFH2 is available for those wishing to observe in real-time.

Please note that the livestream will start broadcasting LIVE once it opens at 10.00am on Friday 29 April 2022. If the Livestream does not initially work, it may be resolved by refreshing the page.

The Examining Authority has exercised its discretion to accept an Additional Submission from Royal Mail (PDF, 752 KB).

26 Ebrill 2022

The Examining Authority has exercised its discretion to accept an Additional Submission from Carter Jonas LLP on behalf of Hanson Quarry Products Europe Limited (PDF, 208 KB).

25 Ebrill 2022

The Examining Authority has issued the following letters:

The ExA requires responses to these requests by Deadline 8 (Friday 6 May 2022).

The ExA has exercised its discretion to accept an Additional Submission from Mr & Mrs de Lisle Wells (PDF, 113 KB).

21 Ebrill 2022

The agendas for the following Hearings have been published:

14 Ebrill 2022

The Examining Authority (ExA) has exercised its discretion to accept an Additional Submission from Climate Emergency Planning and Policy (PDF, 130 KB).

The ExA has published the Report on the Implications for European Sites (RIES) (PDF, 232 KB) and the ExA’s proposed schedule of changes to the draft Development Consent Order (dDCO) (PDF, 105 KB). Any responses to these documents should be submitted at Deadline 8 (Friday 6 May 2022).

13 Ebrill 2022

The Examining Authority (ExA) has published the Report on the Implications for European Sites (RIES) (PDF, 232 KB) and the ExA’s proposed schedule of changes to the draft Development Consent Order (dDCO) (PDF, 105 KB).

Any responses to the above documents should be submitted at Deadline 8 (Friday 6 May 2022).

12 Ebrill 2022

The Deadline 7 submissions have been published.

6 Ebrill 2022

The Examining Authority (ExA) has exercised its discretion to accept an Additional Submission from Bruce Fowler on behalf of Mr and Mrs D Field (PDF, 115 KB).

The ExA has published a letter notifying parties of Procedural Decisions taken following the acceptance of the Applicant’s change request (PDF, 174 KB), including revisions to the Examination Timetable and notification of further Hearings to be held on Friday 29 April 2022.

5 Ebrill 2022

The Examining Authority has published a letter notifying parties of Procedural Decisions taken following the acceptance of the Applicant’s change request (PDF, 174 KB), including revisions to the Examination Timetable and notification of further Hearings to be held on Friday 29 April 2022.

4 Ebrill 2022

Comments received by 3 April 2022 on the Applicant’s request to make changes to the Application have now been published on the Relevant Representations page. They can also be viewed on the updated Examination Library under references RR-111 and RR-112.

The Examination Library (PDF, 1 MB) has been updated.

31 Mawrth 2022

Following the Examining Authority’s (ExA) decision to accept the Applicant’s request for changes to the Proposed Development for examination (PDF, 140 KB), comments are now invited on the Applicant’s proposed provisions by 23:59 on Sunday 3 April 2022.

Please note that any comments must be made on the Registration and Relevant Representation Form and must relate to the Applicant’s change request (PDF, 362 KB) only; any submissions that are not in relation to this, or are not on the prescribed form, will not be seen by the ExA and will be disregarded. Comments submitted after the deadline will also be disregarded.

The Deadline 6 submissions have been published.

17 Mawrth 2022

Following the Examining Authority’s (ExA) decision to accept the Applicant’s request for changes to the Proposed Development for examination (PDF, 140 KB), comments are now invited on the Applicant’s proposed provisions by 23:59 on Sunday 3 April 2022.

Please note that any comments must be made on the Registration and Relevant Representation Form and must relate to the Applicant’s change request (PDF, 362 KB) only; any submissions that are not in relation to this, or are not on the prescribed form, will not be seen by the ExA and will be disregarded. Comments submitted after the deadline will also be disregarded.

The ExA’s Further Written Questions (ExQ2) (PDF, 329 KB) have been published. Responses are sought by Deadline 6 (Wednesday 30 March 2022).

10 Mawrth 2022

Following the Examining Authority’s (ExA) decision to accept the Applicant’s request for changes to the Proposed Development for examination (PDF, 140 KB), comments are now invited on the Applicant’s proposed provisions by 23:59 on Sunday 3 April 2022.

Please note that any comments must be made on the Registration and Relevant Representation Form and must relate to the Applicant’s change request (PDF, 362 KB) only; any submissions that are not in relation to this, or are not on the prescribed form, will not be seen by the ExA and will be disregarded. Comments submitted after the deadline will also be disregarded.

The Deadline 5 submissions have been published.

7 Mawrth 2022

Following the Examining Authority’s (ExA) decision to accept the Applicant’s request for changes to the Proposed Development for examination (PDF, 140 KB), comments are now invited on the Applicant’s proposed provisions by 23:59 on Sunday 3 April 2022.

Please note that any comments must be made on the Registration and Relevant Representation Form and must relate to the Applicant’s change request (PDF, 362 KB) only; any submissions that are not in relation to this, or are not on the prescribed form, will not be seen by the ExA and will be disregarded. Comments submitted after the deadline will also be disregarded.

The video recordings and transcripts from Issue Specific Hearing 4 have been published.

4 Mawrth 2022

Following the Examining Authority’s (ExA) decision to accept the Applicant’s request for changes to the Proposed Development for examination (PDF, 140 KB), comments are now invited on the Applicant’s proposed provisions by 23:59 on Sunday 3 April 2022.

Please note that any comments must be made on the Registration and Relevant Representation Form and must relate to the Applicant’s change request (PDF, 362 KB) only; any submissions that are not in relation to this, or are not on the prescribed form, will not be seen by the ExA and will be disregarded. Comments submitted after the deadline will also be disregarded.

The Action Points arising from Issue Specific Hearing 4 (PDF, 468 KB) have been published.

The ExA has exercised its discretion to accept an Additional Submission from ESP Utilities Group Limited (PDF, 168 KB).

4 Mawrth 2022

Following the Examining Authority’s (ExA) decision to accept the Applicant’s request for changes to the Proposed Development for examination (PDF, 140 KB), comments are now invited on the Applicant’s proposed provisions by 23:59 on Sunday 3 April 2022.

Please note that any comments must be made on the Registration and Relevant Representation Form and must relate to the Applicant’s change request (PDF, 362 KB) only; any submissions that are not in relation to this, or are not on the prescribed form, will not be seen by the ExA and will be disregarded. Comments submitted after the deadline will also be disregarded.

3 Mawrth 2022

The Examining Authority’s (ExA) letter dated 31 January 2022 (PDF, 158 KB) reserved Friday 4 March 2022 for the continuation of Issue Specific Hearing 4 (ISH4) if required. This reserve date is no longer required and has been cancelled.

The notes of the ExA’s Unaccompanied Site Inspections (USI) on 28 February 2022 (USI2) (PDF, 135 KB) and 1 March 2022 (USI3) (PDF, 121 KB) have been published.

2 Mawrth 2022

Instructions for those wishing to participate in Issue Specific Hearing 4 (ISH4) have been sent.

The Livestream of ISH4 is available for those wishing to observe in real-time.

Please note that ISH4 will start broadcasting LIVE once it opens at 10.00am on Thursday 3 March 2022. If the Livestream does not initially work, it may be resolved by refreshing the page.

24 Chwefror 2022

The Examining Authority (ExA) has exercised its discretion to accept an Additional Submission from Hanson Quarry Products Europe Limited (PDF, 226 KB).

The ExA does not consider it necessary to hold Issue Specific Hearing 3 (ISH3) on the draft Development Consent Order or Compulsory Acquisition Hearing 2 (CAH2) on Wednesday 2 March 2022, and therefore these Hearings have been cancelled.

The agenda for Issue Specific Hearing 4 (ISH4) on Environmental Matters has been published (PDF, 136 KB).

17 Chwefror 2022

The Examining Authority (ExA) has made a Procedural Decision to accept the Applicant’s request to make changes to the application. Copies of the documents containing further information can be found here:

The ExA does not consider it necessary to hold Issue Specific Hearing 3 (ISH3) on the draft Development Consent Order or Compulsory Acquisition Hearing 2 (CAH2) on Wednesday 2 March 2022, and therefore these Hearings have been cancelled. Please refer to the above documents for further information.

The agenda for Issue Specific Hearing 4 (ISH4) on Environmental Matters has been published (PDF, 136 KB).

15 Chwefror 2022

The Deadline 4 submissions have been published.

The Deadline 4 submissions include a request from the Applicant to make changes to the application (PDF, 362 KB). Please note that the publication of this request and any supplementary information referred to therein does not indicate that the proposed change has been accepted by the Examining Authority.

7 Chwefror 2022

The Examining Authority (ExA) has issued a response to the Applicant’s notice of intention to make changes to the application (PDF, 129 KB). Please note that this letter does not indicate that the proposed change has been accepted by the ExA.

4 Chwefror 2022

The Deadline 3 submissions have been published and include a notification of intention to make a change request from the Applicant (PDF, 7 MB). Please note that the publication of this letter does not indicate that the proposed change has been accepted by the Examining Authority.

2 Chwefror 2022

The Examining Authority (ExA) has exercised its discretion to accept an Additional Submission from the Applicant (PDF, 120 KB) regarding site inspections.

The ExA has now issued a written Procedural Decision (PDF, 109 KB) to all Interested Parties addressing the conduct of planned site inspections.

The Examination Library (PDF, 1,008 KB) has been updated.

31 Ionawr 2022

28 Ionawr 2022

The Examining Authority has exercised its discretion to accept Additional Submissions from Cotswolds Conservation Board (PDF, 137 KB), Council for British Archaeology (PDF, 148 KB) and The Woodland Trust (PDF, 113 KB).

The video recordings and transcripts from Issue Specific Hearing 2 (ISH2) have been published. The video recordings and transcripts from Compulsory Acquisition Hearing 1 (CAH1), and any Action Points arising from the Hearings held during the w/c 24 January 2022, will be published on the project webpage shortly.

27 Ionawr 2022

The Examining Authority’s letter dated 17 December 2021 (PDF, 179 KB) reserved Friday 28 January 2022 for the continuation of Issue Specific Hearing 2 (ISH2) if required. This reserve date is no longer required and has been cancelled.


 


The video recordings and transcripts from Compulsory Acquisition Hearing 1 (CAH1) and ISH2, and any Action Points arising from the Hearings held during the w/c 24 January 2022, will be published on the project webpage shortly.

26 Ionawr 2022

Instructions for those wishing to participate in Issue Specific Hearing 2 (ISH2) have been sent.

The Livestream of ISH2 is available for those wishing to observe in real-time.

Please note that ISH2 will start broadcasting LIVE once it opens at 10.00am on Thursday 27 January 2022. If the Livestream does not initially work, it may be resolved by refreshing the page.

The video recordings and transcripts from Issue Specific Hearing 1 (ISH1) have now been published.

25 Ionawr 2022

Instructions for those wishing to participate in Compulsory Acquisition Hearing 1 (CAH1) have been sent.

The Livestream of CAH1 is available for those wishing to observe in real-time.

Please note that CAH1 will start broadcasting LIVE once it opens at 10.00am on Wednesday 26 January 2022. If the Livestream does not initially work, it may be resolved by refreshing the page.

The video recordings and transcripts from Open Floor Hearing 1 (OFH1) have now been published.

24 Ionawr 2022

The Examining Authority has exercised its discretion to accept an Additional Submission from The Woodland Trust (PDF, 62 KB).

Instructions for those wishing to participate in Issue Specific Hearing 1 (ISH1) have been sent.

The Livestream of ISH1 is available for those wishing to observe in real-time.

Please note that ISH1 will start broadcasting LIVE once it opens at 10.00am on Tuesday 25 January 2022. If the Livestream does not initially work, it may be resolved by refreshing the page.

21 Ionawr 2022

Instructions for those wishing to participate in Open Floor Hearing 1 (OFH1) have been sent.

The Livestream of OFH1 is available for those wishing to observe in real-time.

Please note that OFH1 will start broadcasting LIVE once it opens at 10.00am on Monday 24 January 2022. If the Livestream does not initially work, it may be resolved by refreshing the page.

21 Ionawr 2022

The Examining Authority has exercised its discretion to accept an Additional Submission from Natural England (PDF, 130 KB).

19 Ionawr 2022

The Examining Authority has exercised its discretion to accept Additional Submissions from Cellnex UK (PDF, 114 KB) and National Trust (PDF, 156 KB).

17 Ionawr 2022

The Deadline 2 submissions have been published. This includes a late submission from Anju Ahuja (PDF, 2 KB) which the Examining Authority (ExA) has exercised its discretion to accept.

The ExA has issued a Rule 17 – Request for Further Information (PDF, 117 KB) to the Applicant, Natural England, Cotswolds Conservation Board, and Gloucestershire County Council.

The ExA requires responses to this request by Deadline 3 (2 February 2022).

14 Ionawr 2022

The Examining Authority (ExA) has issued a Rule 17 – Request for Further Information (PDF, 117 KB) to the Applicant, Natural England, Cotswolds Conservation Board, and Gloucestershire County Council.

The ExA requires responses to this request by Deadline 3 (2 February 2022).

10 Ionawr 2022

21 Rhagfyr 2021

The Examining Authority has exercised its discretion to accept the following late Deadline 1 submissions from Gloucestershire Ramblers:

These documents update and supersede information previously submitted by Gloucestershire Ramblers at Deadline 1.

17 Rhagfyr 2021

The Examining Authority’s (ExA) letter notifying parties of Hearings to be held during the week commencing 24 January 2022 (PDF, 179 KB) has been published.

This letter includes a request for further information from the Applicant. The ExA requires responses to this request by Deadline 2 (13 January 2022).

17 Rhagfyr 2021

The Deadline 1 submissions have been published.

The Examining Authority (ExA) has exercised its discretion to accept the following Deadline 1 submissions from non-Interested Parties:

The ExA has also exercised its discretion to accept a late Deadline 1 submission from Gloucestershire Ramblers (PDF, 1 MB).

16 Tachwedd 2021

The following documents have been published:

The Examination Library (PDF, 730 KB) has been updated.

16 Tachwedd 2021

Examination begins

16 Tachwedd 2021

The Examination Timetable (Rule 8 letter) has been sent to Interested Parties.

Procedural decision following Preliminary Meeting.

12 Tachwedd 2021

Preliminary Meeting Part 2, Tuesday 16 November 2021 – Update

The Examining Authority (ExA) has considered the comments and representations made at Procedural Deadline B and has decided that there are no procedural matters which need to be explored orally. As a result, in accordance with paragraph 7.5 of the Planning Inspectorate’s Advice Note 8.6 (Virtual Events), the ExA does not consider there is a need to reconvene the Preliminary Meeting (PM) and will instead formally close the PM through a written Procedural Decision sent to all Interested Parties on Tuesday 16 November 2021.

This means that a virtual meeting (PM Part 2) will no longer be held on Tuesday 16 November 2021 and the Examination will start following the written close of the PM.

3 Tachwedd 2021

The video recording and transcript from the Preliminary Meeting Part 1 have now been published.

2 Tachwedd 2021

Instructions for those wishing to participate in the Preliminary Meeting (PM) Part 1 have been sent.

The Livestream of PM Part 1 is available for those wishing to observe in real-time.

Please note that the PM will start broadcasting LIVE once it opens at 10:00am on Tuesday 2 November 2021. If the Livestream does not initially work, it may be resolved by refreshing the page.

We would remind those observing the PM that there will be an opportunity to provide any written responses to matters raised at the PM by Procedural Deadline B (Wednesday 10 November 2021).

2 Tachwedd 2021

Preliminary Meeting takes place

26 Hydref 2021

The responses to Procedural Deadline A have now been published.

The Examining Authority has exercised its discretion to accept Additional Submissions from the Applicant in response to the section 51 advice and section 55 checklist issued on 29 June 2021.

Submissions from Dr Stephen Hill (PDF, 90 KB) and Dr William Rimington (PDF, 6 KB) have also been accepted as Additional Submissions.

6 Hydref 2021

The Examining Authority has exercised its discretion to accept Additional Submissions from various parties.

The Rule 6 letter (PDF, 351 KB) notifying of the Preliminary Meeting (PM) has been issued. This includes details of the PM, the draft Examination Timetable and other related matters.

30 Medi 2021

The notification of Preliminary Meeting (Rule 6 letter) has been sent.

The letter also includes the draft Examination Timetable and Initial Assessment of Principal Issues.

10 Medi 2021

The Examining Authority has exercised its discretion to accept Additional Submissions from:

10 Medi 2021

Relevant representations published on the website

2 Medi 2021

Registration of interested parties closes

22 Gorffennaf 2021

Registration of interested parties begins

29 Mehefin 2021

The application has been accepted for examination

1 Mehefin 2021

This application was received by the Planning Inspectorate on Tuesday 1 June 2021.

The application documents will be made available if the application is accepted for examination.

It is for the Applicant to decide whether or not application documents can be published upon submission (see government’s Planning Act 2008: guidance on the Pre-application process).

1 Mehefin 2021

Application received by the Planning Inspectorate