Filter

A12 Chelmsford to A120 Widening Scheme

Relevant representations (registration comments)

Search by the person or group making the submission or the content of the submission.

Showing 1 to 25 of 213 representations, newest first.

Results per page 25 | View 50 results per page | View 100 results per page

  • Allan J Baker

    Due to the fact the new scheme will be directly behind our property and our neighbours The noise and the Veiw will be changed also the possible depreciation Of our property Values Are all concerns... Read more

  • Colchester Cycling Campaign (Colchester Cycling Campaign)

    I wish to draw the attention of the Inspectorate to the submission by Colchester Cycling Campaign which calls for a separate layer on the scheme so that cycling improvements and issues can be seen... Read more

  • Councillor William Sunnucks

    I am interested in a number of issues surrounding this scheme which is important to residents in my Rural North ward. One area of particular concern is linkage with the a120. Modelling needs to... Read more

  • Gerald Wells

    The proposals for junction25 will not work, having meet with representatives of Jacobs they have not process the traffic data sufficiently to appreciate the impact the proposed changes will make. They... Read more

  • Ian Mackenzie Scott-Thompson

    I live in Marks Tey, near the A120, which is a traffic bottleneck. I am also a keen walker and cyclist, and hope that safe and pleasant routes for pedestrians and cyclists can be planned around the... Read more

  • Mark East

    I am gravely concerned that the scheme as presented has not adequately considered the risk to human health in respect of residents living in Hatfield Peverel through increased traffic. The reports... Read more

  • Councillor Ross Playle

    [Redacted] many of the parishes and communities I represent have an interest in the plans being proposed.

  • Geraldine suskins

    Moving to feering impact of a12 on my property

  • Nigel Free

    We live next to A12 current and proposed. have lots of concerns of access and drainage. along with the control and upkeep of the old A12 when its de trunked etc.

  • Stephen Butcher

    the project is going to take away all of our garden causing our lives to be disrupted and stressed .

  • Dave Thompson

    The widening and changes to the A12 are long overdue. But they must fit within a plan for the A120 extension from Braintree to A12 as well as the proposed new house build along the existing A120 to... Read more

  • Tim Olley

    Concerned on the impact on local roads due to the changes to junctions on the A12, this suggests that the scheme fails in its stated aim to put traffic on appropriate roads

  • Sonya Louise Clover

    [Redacted] How will The widening affect my back garden ? And also the traffic whilst you are working in the widening through The Street.

  • Graham Peter Womack

    My main concerns relate to: 1. the ecological impact of the scheme (both during construction and when in operation); 2. The impacts of the proposed changes to junctions around Kelvedon and Feering; 3.... Read more

  • James Willis

    If the plans were approved the road works themselves would take a considerable amount of time and cause motorists increased journey times than already present. As we have seen with other road projects... Read more

  • john triston

    i am concerned about the additional traffic through Boreham on the B1137 with the closure of junction 20A.

  • John Walkinton

    One of my main concerns is how the Witham South junction is dealt with. Currently the local traffic from Witham to Hatfield Peverel and vice versa, has to join the north bound A12. This, in my mind,... Read more

  • Neil Edwin Osborne

    I think in general the proposal will be positive, as a daily user of the A12 to Chelmsford I think the changes will improve safety and traffic flow which will support Economic Growth. My only point of... Read more

  • Mike Sullivan

    I am concerned with how residents of Oak Road will gain access the A12 once the new plans are in place. For example- are we expected to drive through the already congested Witham town centre to access... Read more

  • John Alastair Lindsay

    Our small, 250 year old country cottage is now completely surrounded by this enormous project, with the red line delineating “order limits” abutting our boundary. We have been shown little or no... Read more

  • Mary Ann Lindsay

    Our small, 250 year old country cottage is now completely surrounded by this enormous project, with the red line delineating “order limits” abutting our boundary. We have been shown little or no... Read more

  • Chris Stevenson

    Interested in commenting on sustainable transport provision and also public rights of way and repurposing of bypassed sections of the current A12 alignment.

  • North East Essex Badger Group (North East Essex Badger Group)

    NEEBG has a log of badger setts (collected over many years) that may be impacted. We are keen to ensure that these have picked up during ecological surveys and ensure that mitigation will be planned... Read more

  • Steven Peake

    I use this section of the A12 virtually every day. I am keen for the infrastructure to be improved but am concerned about the impact of the construction phase.

  • Freddie Hacker

    I am in support of the project. I use the A12 at least 5 times a week, and due to the location of my home relative to my job I am unable to use public transport, therefore have to drive. On my 1 hour... Read more