Enquiry

From
The Royal Parks
Date advice given
27 July 2018
Enquiry type
Phone

The enquirer acknowledged that the Royal Parks had not been consulted by the Applicant and raised concerns regarding potential effects to the Longford River.

Advice given

Thank you for your call with regards to the proposed Expansion of Heathrow Airport (Third Runway) application.

As discussed, the proposed application is currently in the pre-application stage, therefore any comments or queries should be made directly to the Applicant – Heathrow Airport Limited. I also note from the Applicant’s website, accessed via the below link, that further public consultation (‘Heathrow Consultation 2’) is due to take place before formal submission to the Planning Inspectorate:

https://www.heathrowexpansion.com/the-expansion-plan/planning-process/

You may wish to sign up for email updates from the Planning Inspectorate, which, amongst other things, will notify you of when the application is formally submitted. This function is available on the overview tab of our project webpage.

Please also find links to our suite of advice notes setting out how to engage once the application has been submitted and has been accepted for Examination by the Planning Inspectorate:

Advice Note Eight: Overview of the nationally significant infrastructure planning process for members of the public and others https://infrastructure.planninginspectorate.gov.uk/wp-content/uploads/2013/04/Advice-note-8.0.pdf Advice Note 8.1: Responding to the developer’s pre-application consultation https://infrastructure.planninginspectorate.gov.uk/wp-content/uploads/2013/04/Advice-note-8-1v4.pdf Advice Note 8.2: How to register to participate in an Examination https://infrastructure.planninginspectorate.gov.uk/wp-content/uploads/2013/04/Advice-note-8-2v3.pdf Advice Note 8.3: Influencing how an application is Examined: the Preliminary Meeting https://infrastructure.planninginspectorate.gov.uk/wp-content/uploads/2014/06/Advice-note-8-3v4.pdf Advice Note 8.4: The Examination https://infrastructure.planninginspectorate.gov.uk/wp-content/uploads/2013/04/Advice-note-8-4v3.pdfAdvice Note 8.5: The Examination: hearings and site inspections https://infrastructure.planninginspectorate.gov.uk/wp-content/uploads/2013/04/Advice-note-8-5v3.pdf