Skip to main content
Dod o hyd i Brosiect Seilwaith Cenedlaethol

Gwasanaeth beta yw hwn - bydd eich adborth yn ein helpu i'w wella.

Rail Central (Strategic Rail Freight Interchange)

Gwybodaeth am y prosiect

Diweddariad diweddaraf - 24 Hydref 2019

The Applicant has formally withdrawn their application. As a result no further consideration of the application will be carried out by the Examining Authority or the Planning Inspectorate.

The Examining Authority's letter confirming the withdrawal has been published.

Gweld yr holl ddiweddariadau.

Ynglŷn â'r prosiect

Y math o gais: Cyfnewidfeydd Rheilffyrdd Cludo Nwyddau

Enw'r ymgeisydd: Ashfield Land Management Limited and Gazeley GLP Northampton s.á.r.l.

The proposed development comprises the following principal elements: • Demolition of existing buildings and structures; • An intermodal freight terminal with direct connections to the Northampton Loop Line, capable of accommodating trains of up to 775m long, including up to 3 gantry cranes, container storage, a train maintenance depot and facilities to transfer containers to Heavy Goods Vehicles (HGV); • An express freight terminal with direct connections to the West Coast Main Line, capable of accommodating trains of up to 240m long, a freight platform with associated loading and unloading facilities; • Up to 702, 097 sq m (GEA) of rail connected and rail served warehousing and ancillary service buildings including a lorry park, terminal control building and bus terminal; • New road infrastructure including a new separated access point on the A43 (T), an internal site underpass (under Northampton Road); • Strategic landscaping and open space including alterations to public rights of way, the creation of new ecological enhancement areas and publicly accessible open areas, flood attenuation, and the partial diversion of the Milton Malsor brook. • A comprehensive package of highways mitigation, including improvements to J15a of the M1.


Cam y prosiect

Mae'r prosiect hwn wedi cael ei dynnu'n ôl.

Gallwch weld unrhyw ddogfennau a gwybodaeth hyd nes bydd y prosiect yn cael ei archifo.


Lleoliad y prosiect

Land at Arm Farm, Milton Malsor, Northampton


Cael diweddariadau

Rhowch eich cyfeiriad e-bost i gael:

  • diweddariadau ar gynnydd y prosiect
  • gwybodaeth ynglŷn â sut i leisio'ch barn
  • hysbysiadau pan fydd dogfennau allweddol yn cael eu cyhoeddi
Darllenwch yr hysbysiad preifatrwydd i gael gwybod sut rydym yn trin eich gwybodaeth.
Cael diweddariadau

Cysylltu â ni

Ffoniwch

Os oes gennych rif parti â buddiant, cadwch ef wrth law pan fyddwch yn ffonio.

Rhif ffôn: 0303 444 5000

Ar agor o ddydd Llun i ddydd Gwener: 9yb i 4yp
Ar gau ar benwythnosau a gwyliau banc.

Anfonwch neges e-bost

RailCentral@planninginspectorate.gov.uk.

Pan fyddwch yn ysgrifennu neges e-bost, rhowch enw'r prosiect yn y llinell bwnc.

Ceisiwn ymateb o fewn 10 niwrnod gwaith.

Fformatau amgen

Ffoniwch neu anfonwch neges e-bost i ofyn am ddogfennau'r prosiect mewn fformat amgen fel PDF, print bras, fersiwn hawdd ei darllen, recordiad sain neu braille.