-
2.2 - Explanatory Memorandum
(PDF, 696KB)
O EP Waste Management Limited
-
4.1 - Site Location Plan
(PDF, 1MB)
O EP Waste Management Limited
-
5.5 - Planning, Design and Access Statement
(PDF, 2MB)
O EP Waste Management Limited
-
5.7 - Fuel Availability and Waste Hierarchy Assessment
(PDF, 339KB)
O EP Waste Management Limited
-
6.2.13 - ES Vol I Chapter 13: Cultural Heritage
(PDF, 171KB)
O EP Waste Management Limited
-
6.2.15 - ES Vol I Chapter 15: Socio-Economics
(PDF, 569KB)
O EP Waste Management Limited
-
6.1 - Environmental Statement Non Technical Summary
(PDF, 2MB)
O EP Waste Management Limited
-
6.2.1 - ES Vol I Chapter 1: Introduction
(PDF, 266KB)
O EP Waste Management Limited
-
6.2.17 - ES Vol I Chapter 17: Cumulative and Combined Effects
(PDF, 329KB)
O EP Waste Management Limited
-
6.2.19 - ES Vol I Chapter 19: Sustainability and Climate Change
(PDF, 362KB)
O EP Waste Management Limited
-
6.2.3 - ES Vol I Chapter 3: Description of the Proposed Development Site
(PDF, 62KB)
O EP Waste Management Limited
-
6.2.5 - ES Vol I Chapter 5: Construction Programme and Management
(PDF, 214KB)
O EP Waste Management Limited
-
6.2.21 - ES Vol I Environmental Statement Glossary
(PDF, 247KB)
O EP Waste Management Limited
-
6.3.1 - ES Vol II Figure 1.1: Site Location Plan
(PDF, 3MB)
O EP Waste Management Limited
-
6.2.6 - ES Vol I Chapter 6: Need, Alternatives and Design Evolution
(PDF, 179KB)
O EP Waste Management Limited
-
6.2.7 - ES Vol I Chapter 7: Air Quality
(PDF, 261KB)
O EP Waste Management Limited
-
1.1 - Application Cover Letter
(PDF, 204KB)
O EP Waste Management Limited
-
6.2.11 - ES Vol I Chapter 11: Landscape and Visual Amenity
(PDF, 261KB)
O EP Waste Management Limited
-
6.3.3 - ES Vol II Figure 3.2: Residential Receptors
(PDF, 1MB)
O EP Waste Management Limited
-
4.4 - Access and Rights of Way Plan
(PDF, 609KB)
O EP Waste Management Limited
-
6.2.10 - ES Vol I Chapter 10: Ecology
(PDF, 899KB)
O EP Waste Management Limited
-
6.2.12 - ES Vol I Chapter 12: Geology, Hydrogeology and Land Contamination
(PDF, 593KB)
O EP Waste Management Limited
-
6.2.2 - ES Vol I Chapter 2: Assessment Methodology
(PDF, 52KB)
O EP Waste Management Limited
-
6.2.4 - ES Vol I Chapter 4: The Proposed Development
(PDF, 476KB)
O EP Waste Management Limited
-
6.2.0 - ES Vol I Cover and Contents
(PDF, 127KB)
O EP Waste Management Limited
-
6.3.22 - ES Vol II Figure 11.7B: Viewpoint 2 - Brickfield House (Winter)
(PDF, 677KB)
O EP Waste Management Limited
-
6.3.24 - ES Vol II Figure 11.8B: Viewpoint 3 - Carr Lane Footpath (Winter)
(PDF, 958KB)
O EP Waste Management Limited
-
6.3.26 - ES Vol II Figure 11.9B: Viewpoint 4 - Cress Cottage (Winter)
(PDF, 2MB)
O EP Waste Management Limited
-
6.3.2 - ES Vol II Figure 3.1: Parts of the Site (Order Limits and Work Numbers)
(PDF, 810KB)
O EP Waste Management Limited
-
6.3.18 - ES Vol II Figure 11.5: Final Viewpoint Locations
(PDF, 3MB)
O EP Waste Management Limited
-
6.3.20 - ES Vol II Figure 11.6B: Viewpoint 1 - Farmshop Hotel A180 (Winter)
(PDF, 724KB)
O EP Waste Management Limited
-
6.2.18 - ES Vol I Chapter 18: Human Health
(PDF, 357KB)
O EP Waste Management Limited
-
4.6 - Indicative Gas Connection Plan
(PDF, 532KB)
O EP Waste Management Limited
-
4.8 - EP Waste Management LimitedIndicative Towns Water Connection Plan
(PDF, 522KB)
O EP Waste Management Limited
-
6.2.8 - ES Vol I Chapter 8: Noise and Vibration
(PDF, 213KB)
O EP Waste Management Limited
-
6.2.9 - ES Vol I Chapter 9: Traffic and Transport
(PDF, 530KB)
O EP Waste Management Limited
-
6.2.20 - ES Vol I Chapter 20: Summary of Significant Effects
(PDF, 68KB)
O EP Waste Management Limited
-
6.2.14 - ES Vol I Chapter 14: Water Resources, Flood Risk and Drainage
(PDF, 402KB)
O EP Waste Management Limited
-
6.2.16 - ES Vol I Chapter 16: Waste Management
(PDF, 289KB)
O EP Waste Management Limited
-
6.3.23 - ES Vol II Figure 11.8A: Viewpoint 3 - Carr Lane Footpath (Summer)
(PDF, 926KB)
O EP Waste Management Limited
-
6.3.25 - ES Vol II Figure 11.9A: Viewpoint 4 - Cress Cottage (Summer)
(PDF, 2MB)
O EP Waste Management Limited
-
6.3.10 - ES Vol II Figure 7.3: Annual Mean Maximum NO2 Process Contribution - 2015 Meteorological Year
(PDF, 3MB)
O EP Waste Management Limited
-
6.3.12 - ES Vol II Figure 8.1: Noise Sensitive Receptors and Monitoring Locations
(PDF, 2MB)
O EP Waste Management Limited
-
6.3.28 - ES Vol II Figure 11.10B: Viewpoint 5 - Beechwood Farm Carvery (Winter)
(PDF, 880KB)
O EP Waste Management Limited
-
6.3.30 - ES Vol II Figure 11.11B: Viewpoint 6 - Sunk Island Footpath (Winter)
(PDF, 694KB)
O EP Waste Management Limited
-
6.3.11 - ES Vol II Figure 7.4: Short Term Maximum NO2 Process Contribution - 2014 Meteorological Year
(PDF, 3MB)
O EP Waste Management Limited
-
6.3.13 - ES Vol II Figure 8.2: Predicted Noise Levels at Ecological Receptors - Worst Case Hour 06:00 - 07:00, Height Above Ground 0.5 m
(PDF, 1MB)
O EP Waste Management Limited
-
6.3.27 - ES Vol II Figure 11.10A: Viewpoint 5 - Beechwood Farm Carvery (Summer)
(PDF, 1MB)
O EP Waste Management Limited
-
6.3.29 - ES Vol II Figure 11.11A: Viewpoint 6 - Sunk Island Footpath (Summer)
(PDF, 964KB)
O EP Waste Management Limited
-
6.3.0 - ES Vol II Cover and Contents
(PDF, 232KB)
O EP Waste Management Limited
-
6.3.14 - ES Vol II Figure 11.1: Potential Viewpoint Locations
(PDF, 3MB)
O EP Waste Management Limited
-
6.3.16 - ES Vol II Figure 11.3: Public Rights of Way and Topography
(PDF, 2MB)
O EP Waste Management Limited
-
6.3.32 - ES Vol II Figure 11.12B: Viewpoint 7 - Immingham South Footpath (Winter)
(PDF, 652KB)
O EP Waste Management Limited
-
6.3.19 - ES Vol II Figure 11.6A: Viewpoint 1 - Farmshop Hotel A180 (Summer)
(PDF, 1MB)
O EP Waste Management Limited
-
6.3.21 - ES Vol II Figure 11.7A: Viewpoint 2 - Brickfield House (Summer)
(PDF, 1MB)
O EP Waste Management Limited
-
6.3.15 - ES Vol II Figure 11.2: Landscape Types and Designations
(PDF, 3MB)
O EP Waste Management Limited
-
6.3.17 - ES Vol II Figure 11.4: Zone of Theoretical Visibility (ZTV) - Energy Centre and Stack
(PDF, 3MB)
O EP Waste Management Limited
-
6.3.31 - ES Vol II Figure 11.12A: Viewpoint 7 - Immingham South Footpath (Summer)
(PDF, 1MB)
O EP Waste Management Limited
-
6.3.5 - ES Vol II Figure 4.1: Indicative Proposed Development Layout
(PDF, 479KB)
O EP Waste Management Limited
-
6.4.2 - ES Vol III Appendix 1B: Scoping Opinion
(PDF, 4MB)
O EP Waste Management Limited
-
6.4.5 - ES Vol III Appendix 7A: Air Quality Dispersion Modelling Assessment
(PDF, 11MB)
O EP Waste Management Limited
-
6.4.7 - ES Vol III Appendix 8A: Noise Perception and Terminology
(PDF, 145KB)
O EP Waste Management Limited
-
6.3.45 - ES Vol II Figure 17.2: Electrical Connection Route Options
(PDF, 1MB)
O EP Waste Management Limited
-
6.4.0 - ES Vol III Cover and Contents
(PDF, 116KB)
O EP Waste Management Limited
-
6.4.12 - ES Vol III Appendix 9A: Transport Assessment File 6 - Annexes 16 to 28
(PDF, 17MB)
O EP Waste Management Limited
-
6.4.14 - ES Vol III Appendix 10B: Ecological Impact Assessment Methodology
(PDF, 179KB)
O EP Waste Management Limited
-
6.4.9 - ES Vol III Appendix 8C: Noise Monitoring
(PDF, 238KB)
O EP Waste Management Limited
-
6.4.11 - ES Vol III Appendix 8E: Noise Modelling
(PDF, 80KB)
O EP Waste Management Limited
-
6.4.20 - ES Vol III Appendix 11B: Potential Viewpoints for Landscape and Visual Impact Assessment
(PDF, 113KB)
O EP Waste Management Limited
-
6.4.21 - ES Vol III Appendix 12A: Phase 1 Geo-environmental and Geotechnical Desk Study Report
(PDF, 12MB)
O EP Waste Management Limited
-
6.3.41 - ES Vol II Figure 13.1: Heritage Assets within the 5 km Study Area
(PDF, 2MB)
O EP Waste Management Limited
-
6.3.43 - ES Vol II Figure 14.1: Key Watercourses and Flow Direction
(PDF, 489KB)
O EP Waste Management Limited
-
6.4.12 - ES Vol III Appendix 9A: Transport Assessment File 2 - Annexes 1 to 4
(PDF, 10MB)
O EP Waste Management Limited
-
6.4.12 - ES Vol III Appendix 9A: Transport Assessment File 4 - Annexes 6 to 14
(PDF, 19MB)
O EP Waste Management Limited
-
6.4.26 - ES Vol III Appendix 14A: Flood Risk Assessment File 2 - Annexes
(PDF, 16MB)
O EP Waste Management Limited
-
6.4.28 - ES Vol III Appendix 19A: Greenhouse Gas Emissions Assessment
(PDF, 199KB)
O EP Waste Management Limited
-
6.4.10 - ES Vol III Appendix 8D: Noise Assessment Construction Activities
(PDF, 49KB)
O EP Waste Management Limited
-
6.4.12 - ES Vol III Appendix 9A: Transport Assessment File 1 - Main Document
(PDF, 2MB)
O EP Waste Management Limited
-
6.3.4 - ES Vol II Figure 3.3: Environmental Receptors within 5 km
(PDF, 6MB)
O EP Waste Management Limited
-
6.3.36 - ES Vol II Figure 11.14B: Viewpoint 9 - Middle Drain Public Right of Way (Winter)
(PDF, 869KB)
O EP Waste Management Limited
-
6.4.4 - ES Vol III Appendix 5A: Outline Construction Environmental Management Plan
(PDF, 395KB)
O EP Waste Management Limited
-
6.4.13 - ES Vol III Appendix 10A: Ecology Legislation and Planning Policy
(PDF, 371KB)
O EP Waste Management Limited
-
6.4.23 - ES Vol III Appendix 12C: Ground Investigation Interpretive Report
(PDF, 2MB)
O EP Waste Management Limited
-
6.4.25 - ES Vol III Appendix 13B: Historical Maps and Aerial Photographs
(PDF, 557KB)
O EP Waste Management Limited
-
6.3.6 - ES Vol II Figure 4.2: Ecological Mitigation and Enhancements (Indicative)
(PDF, 2MB)
O EP Waste Management Limited
-
6.3.8 - ES Vol II Figure 7.1: Air Quality Receptors and Diffusion Tube Monitoring Locations.
(PDF, 2MB)
O EP Waste Management Limited
-
6.4.21 - ES Vol III Appendix 12A: Phase 1 Geo-environmental and Geotechnical Desk Study Report
(PDF, 4MB)
O EP Waste Management Limited
-
6.4.22 - ES Vol III Appendix 12B: Ground Investigation Factual Report
(PDF, 26MB)
O EP Waste Management Limited
-
6.3.35 - ES Vol II Figure 11.14A: Viewpoint 9 - Middle Drain Public Right of Way (Summer)
(PDF, 1MB)
O EP Waste Management Limited
-
6.4.15 - ES Vol III Appendix 10C: Preliminary Ecological Appraisal Report
(PDF, 10MB)
O EP Waste Management Limited
-
6.4.27 - ES Vol III Appendix 14B: Outline Drainage Strategy
(PDF, 7MB)
O EP Waste Management Limited
-
6.3.40 - ES Vol II Figure 11.18: Viewpoint 9 Photomontage and Wireframe for Indicative Concept Layout
(PDF, 4MB)
O EP Waste Management Limited
-
6.3.42 - ES Vol II Figure 13.2: Archaeological Events within the 5 km Study Area
(PDF, 2MB)
O EP Waste Management Limited
-
6.3.37 - ES Vol II Figure 11.15: Viewpoint 1 Farmshop Hotel, A180 - Photomontage and Wireframe for Indicative Concept Layout
(PDF, 3MB)
O EP Waste Management Limited
-
6.4.3 - ES Vol III Appendix 1C: Statement of Competence
(PDF, 159KB)
O EP Waste Management Limited
-
6.4.12 - ES Vol III Appendix 9A: Transport Assessment File 3 - Annex 5
(PDF, 13MB)
O EP Waste Management Limited
-
6.4.12 - ES Vol III Appendix 9A: Transport Assessment File 5 - Annex 15
(PDF, 20MB)
O EP Waste Management Limited
-
6.4.24 - ES Vol III Appendix 13A: Gazetteer of Cultural Heritage Assets
(PDF, 117KB)
O EP Waste Management Limited
-
6.4.26 - ES Vol III Appendix 14A: Flood Risk Assessment File 1 - Main Document
(PDF, 2MB)
O EP Waste Management Limited
-
6.3.44 - ES Vol II Figure 17.1: Cumulative Developments (Short List)
(PDF, 3MB)
O EP Waste Management Limited