Back to list Medworth Energy from Waste Combined Heat and Power Facility

Representation by Glenn David Shales

Date submitted
4 October 2022
Submitted by
Members of the public/businesses

This is a non starter for anyone with a modicum of sense and decency. The local road network, A47 and the routes leading up to the proposed site are unsuitable for the current level of traffic let alone the increased volume expected if MVV bulldoze their way pass the wishes of local residents and councils. There is no benefit to the local area in any way whatsoever and anything produced by this monstrosity has to be weighed against the carbon emissions produced by transporting the waste to the site, particulates emitted, road congestion, loss of jobs, let alone the aesthetics. There is only greed and ignorance behind this project