Back to list Medworth Energy from Waste Combined Heat and Power Facility

Representation by Jacqueline Wisby

Date submitted
12 October 2022
Submitted by
Members of the public/businesses

The position that will be used to build this plant is totally unacceptable,you must realise that the residents in the locality will suffer,not only from the traffic which will cause even more air pollution,but the area already becomes gridlocked very quickly. I am an [] and suffer greatly already,surely this megastructure should be placed outside of a residential area where an infrastructure could be placed to take on the problems this will cause. I moved here because it was a town with history and beautiful buildings. Should this building go ahead ( god forbid) I fear that Wisbech will Die off completely.