Back to list Medworth Energy from Waste Combined Heat and Power Facility

Representation by Simon Thompson

Date submitted
31 October 2022
Submitted by
Members of the public/businesses

I live very local and currently work down []in Wisbech which will only be a few feet away from where this incinerator will be built. Currently it is absolute mayhem with the current level or traffic and parking. When the children are in the local school []it can take 30 minutes to make a 20 second trip. With the increased volume of traffic this site will create it will cause unprecedented disruption to working life and soon will make the whole of Wisbech gridlocked. We also have a large refrigeration unit down the end of [] which already causes a large number of lorries to following the incorrect route and get stuck down smaller side streets, having the incinerator will just only exacerbate things 10 fold. This needs to be moved out of such a busy industrial estate that is already crammed full and built in the middle of Wisbech St Mary or a surrounding village.