View examination library (PDF, 602KB) containing document reference numbers
-
Additional Submission - Accepted at the discretion of the Examining Authority - 7.24.24.2 Environmental Statement Appendix 24-2 Transport Assessment (Revision 2)
(PDF, 53MB)
From RWE Renewables UK Dogger Bank South (West) Ltd and RWE Renewables UK Dogger Bank South (East) Ltd
-
Additional Submission - Accepted at the discretion of the Examining Authority - 10.36 Review of evidence on recovery of sandbank habitat following habitat damage (Revision 01)
(PDF, 2MB)
From RWE Renewables UK Dogger Bank South (West) Ltd and RWE Renewables UK Dogger Bank South (East) Ltd
-
Additional Submission - Accepted at the discretion of the Examining Authority - 8.13 Outline Construction Traffic Management Plan (Revision 2) (Tracked)
(PDF, 12MB)
From RWE Renewables UK Dogger Bank South (West) Ltd and RWE Renewables UK Dogger Bank South (East) Ltd
-
Additional Submission - Accepted at the discretion of the Examining Authority - 10.28 Archaeological Trial Trenching Phase 2 (Interim) Section 6
(PDF, 12MB)
From RWE Renewables UK Dogger Bank South (West) Ltd and RWE Renewables UK Dogger Bank South (East) Ltd
-
Additional Submission - Accepted at the discretion of the Examining Authority - 7.4 Environmental Statement Chapter 4 – Site Selection & Assessment of Alternatives (Revision 2) (Tracked)
(PDF, 1MB)
From RWE Renewables UK Dogger Bank South (West) Ltd and RWE Renewables UK Dogger Bank South (East) Ltd
-
Additional Submission - Accepted at the discretion of the Examining Authority - 10.12 Phase 2 2024 Archaeological Trial Trenching Technical Note (Revision 2)
(PDF, 434KB)
From RWE Renewables UK Dogger Bank South (West) Ltd and RWE Renewables UK Dogger Bank South (East) Ltd
-
Additional Submission - Accepted at the discretion of the Examining Authority - 7.4 Environmental Statement Chapter 4 – Site Selection & Assessment of Alternatives (Revision 2) (Clean)
(PDF, 1MB)
From RWE Renewables UK Dogger Bank South (West) Ltd and RWE Renewables UK Dogger Bank South (East) Ltd
-
Additional Submission - Accepted at the discretion of the Examining Authority - 8.13 Outline Construction Traffic Management Plan (Revision 2) (Clean)
(PDF, 13MB)
From RWE Renewables UK Dogger Bank South (West) Ltd and RWE Renewables UK Dogger Bank South (East) Ltd
-
Additional Submission - Accepted at the discretion of the Examining Authority - 10.6 Geophysical Assessment Report (Revision 02) - Part 3 of 6
(PDF, 51MB)
From RWE Renewables UK Dogger Bank South (West) Ltd and RWE Renewables UK Dogger Bank South (East) Ltd
-
Additional Submission - Accepted at the discretion of the Examining Authority - 10.29 Response to Rule 17 Dated 7th November and Cover Letter for additional submissions
(PDF, 338KB)
From RWE Renewables UK Dogger Bank South (West) Ltd and RWE Renewables UK Dogger Bank South (East) Ltd
-
Additional Submission - Accepted at the discretion of the Examining Authority - 10.31 Responses to Supplementary Agenda Items ISH1 (Revision 01)
(PDF, 579KB)
From RWE Renewables UK Dogger Bank South (West) Ltd and RWE Renewables UK Dogger Bank South (East) Ltd
-
Additional Submission - Accepted at the discretion of the Examining Authority - 10.6 Geophysical Assessment Report (Revision 02) (Clean) - Part 1 of 6
(PDF, 2MB)
From RWE Renewables UK Dogger Bank South (West) Ltd and RWE Renewables UK Dogger Bank South (East) Ltd
-
Additional Submission - Accepted at the discretion of the Examining Authority - 10.13 Arboricultural Survey Report, Preliminary Arboricultural Impact Assessment and Outline Arboricultural Method Statement (Revision 02) (Clean)
(PDF, 51MB)
From RWE Renewables UK Dogger Bank South (West) Ltd and RWE Renewables UK Dogger Bank South (East) Ltd
-
Additional Submission - Accepted at the discretion of the Examining Authority - 10.32 Responses to Supplementary Agenda Items CAH1 (Revision 01)
(PDF, 334KB)
From RWE Renewables UK Dogger Bank South (West) Ltd and RWE Renewables UK Dogger Bank South (East) Ltd
-
Additional Submission - Accepted at the discretion of the Examining Authority - 8.24 Outline Offshore Operations and Maintenance Plan (Revision 02) (Tracked)
(PDF, 744KB)
From RWE Renewables UK Dogger Bank South (West) Ltd and RWE Renewables UK Dogger Bank South (East) Ltd
-
Additional Submission - Accepted at the discretion of the Examining Authority - 10.6 Geophysical Assessment Report (Revision 02) - Part 2 of 6
(PDF, 51MB)
From RWE Renewables UK Dogger Bank South (West) Ltd and RWE Renewables UK Dogger Bank South (East) Ltd
-
Additional Submission - Accepted at the discretion of the Examining Authority - 10.6 Geophysical Assessment Report (Revision 02) - Part 6 of 6
(PDF, 34MB)
From RWE Renewables UK Dogger Bank South (West) Ltd and RWE Renewables UK Dogger Bank South (East) Ltd
-
Additional Submission - Accepted at the discretion of the Examining Authority - 10.6 Geophysical Assessment Report (Revision 02) - Part 4 of 6
(PDF, 52MB)
From RWE Renewables UK Dogger Bank South (West) Ltd and RWE Renewables UK Dogger Bank South (East) Ltd
-
Additional Submission - Accepted at the discretion of the Examining Authority - 8.24 Outline Offshore Operations and Maintenance Plan (Revision 02) (Clean)
(PDF, 678KB)
From RWE Renewables UK Dogger Bank South (West) Ltd and RWE Renewables UK Dogger Bank South (East) Ltd
-
Rule 17 letter issued 7 November 2024
(PDF, 179KB)
-
Additional Submission - Accepted at the discretion of the Examining Authority - Array Layout Yield Study
(PDF, 583KB)
From RWE Renewables UK Dogger Bank South (West) Limited and RWE Renewables UK Dogger Bank South (East) Limited
-
Additional Submission - Accepted at the discretion of the Examining Authority - 10.26 Location of Jocks Lodge Proposals Compared to DBS Onshore Works Submission in Response to Rule 17 Letter (Revision 01)
(PDF, 2MB)
From RWE Renewables UK Dogger Bank South (West) Limited and RWE Renewables UK Dogger Bank South (East) Limited
-
Additional Submission - Accepted at the discretion of the Examining Authority - 10.25 Proposed Yorkshire Wolds National Landscape Submission in Response to Rule 17 Letter (Revision 01)
(PDF, 14MB)
From RWE Renewables UK Dogger Bank South (West) Limited and RWE Renewables UK Dogger Bank South (East) Limited
-
Additional Submission - Accepted at the discretion of the Examining Authority - 7.16.1 Environmental Statement Chapter 16 – Infrastructure and Other Users Figure 16-2 - Volume 7 (Revision 03)
(PDF, 3MB)
From RWE Renewables UK Dogger Bank South (West) Limited and RWE Renewables UK Dogger Bank South (East) Limited
-
Additional Submission - Accepted at the discretion of the Examining Authority - Intention to Submit a Change Request re Onshore Substation Zone (Change Request 2)
(PDF, 6MB)
From RWE Renewables UK Dogger Bank South (West) Limited and RWE Renewables UK Dogger Bank South (East) Limited
-
Additional Submission - Accepted at the discretion of the Examining Authority - 10.24 Onshore Substation Refined Area of Search and Onshore Substation Zones Long List Submission in Response to Rule 17 Letter (Revision 01)
(PDF, 2MB)
From RWE Renewables UK Dogger Bank South (West) Limited and RWE Renewables UK Dogger Bank South (East) Limited
-
Additional Submission - Accepted at the discretion of the Examining Authority - Response to Rule 17 Letter Dated 24 October 2024
(PDF, 261KB)
From RWE Renewables UK Dogger Bank South (West) Limited and RWE Renewables UK Dogger Bank South (East) Limited
-
Examination Library
(PDF, 602KB)
From Examination Library
-
6.2.1 Appendix 1 - Project-Level Kittiwake Compensation Plan - Report to Inform Appropriate Assessment (RIAA) - Habitats Regulations Assessment (Revision 02) (Tracked)
(PDF, 38MB)
From RWE Renewables UK Dogger Bank South (West) Ltd and RWE Renewables UK Dogger Bank South (East) Ltd
-
Preliminary Meeting Note Part 1 dated 22 October 2024
(PDF, 584KB)
-
Response to the Rule 9 and 17 Letter issued on 22 October 2024
(PDF, 160KB)
From Natural England
-
Response to the Rule 9 and 17 Letter issued on 22 October 2024
(PDF, 82KB)
From National Trust
-
10.20 Guillemot and Razorbill Compensation Site Shortlist Refinement Report (Revision 01)
(PDF, 3MB)
From RWE Renewables UK Dogger Bank South (West) Ltd and RWE Renewables UK Dogger Bank South (East) Ltd
-
6.2.2 Appendix 2 - Guillemot [and Razorbill] Compensation Plan - Habitats Regulations Derogation: Provision of Evidence (Revision 02) (Clean)
(PDF, 2MB)
From RWE Renewables UK Dogger Bank South (West) Ltd and RWE Renewables UK Dogger Bank South (East) Ltd
-
Response to the Rule 9 and 17 Letter issued on 22 October 2024
(PDF, 196KB)
From RSPB
-
Applicants’ Response to Rule 9 and Rule 17 Letter issued on 22 October 2024
(PDF, 207KB)
From RWE Renewables UK Dogger Bank South (West) Ltd and RWE Renewables UK Dogger Bank South (East) Ltd
-
10.19 Project-Level Kittiwake Artificial Nesting Structure (ANS) Site Selection Report (Revision 01)
(PDF, 8MB)
From RWE Renewables UK Dogger Bank South (West) Ltd and RWE Renewables UK Dogger Bank South (East) Ltd
-
10.18 Response to Natural England's Relevant Representations (Appendix G & H) (Revision 01)
(PDF, 993KB)
From RWE Renewables UK Dogger Bank South (West) Ltd and RWE Renewables UK Dogger Bank South (East) Ltd
-
6.2.1 Appendix 1 - Project-Level Kittiwake Compensation Plan - Report to Inform Appropriate Assessment (RIAA) - Habitats Regulations Assessment (Revision 02) (Clean)
(PDF, 38MB)
From RWE Renewables UK Dogger Bank South (West) Ltd and RWE Renewables UK Dogger Bank South (East) Ltd
-
6.2.2 Appendix 2 - Guillemot [and Razorbill] Compensation Plan - Habitats Regulations Derogation: Provision of Evidence (Revision 02) (Tracked)
(PDF, 899KB)
From RWE Renewables UK Dogger Bank South (West) Ltd and RWE Renewables UK Dogger Bank South (East) Ltd
-
Regulation 32 - consultation response from the Netherlands
(PDF, 4MB)
-
Response to the Rule 9 and 17 Letter issued on 22 October 2024
(PDF, 324KB)
From Marine Management Organisation
-
Transcript of Preliminary Meeting (PM) - Session 2 - 22 October 2024
(PDF, 148KB)
-
Transcript of Preliminary Meeting (PM) - Session 1 - 22 October 2024
(PDF, 243KB)
-
Recording of Preliminary Meeting (PM) - Session 2 - 22 October 2024
(HTML, 4KB)
-
Recording of Preliminary Meeting (PM) - Session 1 - 22 October 2024
(HTML, 4KB)
-
Rule 17 Letter - Request for further information 24 October 2024
(PDF, 176KB)
-
Rule 9 and 17 Letter - Procedural Decision and Request for further information dated 22 October 2024
(PDF, 168KB)
-
Action Points from Preliminary Meeting
(PDF, 130KB)
-
Additional Submission has been accepted at the discretion of the Examining Authority - Response to Rule 17 Letter
(PDF, 10MB)
From RSPB
-
Additional Submission has been accepted at the discretion of the Examining Authority - Response to Rule 17 Letter
(PDF, 157KB)
From Natural England
-
Additional Submission has been accepted at the discretion of the Examining Authority - Response to Rule 17 Letter
(PDF, 282KB)
From RWE Renewables UK Dogger Bank South (West) Ltd and RWE Renewables UK Dogger Bank South (East) Ltd
-
Rule 17 Letter - Request for Further Information dated 15 October 2024
(PDF, 153KB)
-
Agenda for Compulsory Acquisition Hearing 1 (CAH1)
(PDF, 253KB)
-
Revised Agenda for Preliminary Meeting
(PDF, 187KB)
-
Agenda for Issue Specific Hearing 1 (ISH1)
(PDF, 368KB)
-
Response to the Rule 6 Letter
(PDF, 438KB)
From Marine Management Organisation
-
10.6 August 2024 Geophysical Assessment Report Part 2 of 9 (Revision 1)
(PDF, 50MB)
From RWE Renewables UK Dogger Bank South (West) Ltd and RWE Renewables UK Dogger Bank South (East) Ltd
-
10.11 Archaeological Trial Trenching Phase 2 (Interim) Section 11 (Revision 1)
(PDF, 9MB)
From RWE Renewables UK Dogger Bank South (West) Ltd and RWE Renewables UK Dogger Bank South (East) Ltd
-
Response to the Rule 6 Letter
(PDF, 149KB)
From Natural England
-
10.10 Archaeological Trial Trenching Phase 2 (Interim) Section 10 (Revision 1)
(PDF, 9MB)
From RWE Renewables UK Dogger Bank South (West) Ltd and RWE Renewables UK Dogger Bank South (East) Ltd
-
10.6 August 2024 Geophysical Assessment Report Part 7 of 9 (Revision 1)
(PDF, 50MB)
From RWE Renewables UK Dogger Bank South (West) Ltd and RWE Renewables UK Dogger Bank South (East) Ltd
-
2.18 Tree Preservation Order and Hedgerow Plan (Revision 2)
(PDF, 24MB)
From RWE Renewables UK Dogger Bank South (West) Ltd and RWE Renewables UK Dogger Bank South (East) Ltd
-
10.6 August 2024 Geophysical Assessment Report Part 3 of 9 (Revision 1)
(PDF, 49MB)
From RWE Renewables UK Dogger Bank South (West) Ltd and RWE Renewables UK Dogger Bank South (East) Ltd
-
10.6 August 2024 Geophysical Assessment Report Part 6 of 9 (Revision 1)
(PDF, 51MB)
From RWE Renewables UK Dogger Bank South (West) Ltd and RWE Renewables UK Dogger Bank South (East) Ltd
-
10.6 August 2024 Geophysical Assessment Report Part 9 of 9 (Revision 1)
(PDF, 21MB)
From RWE Renewables UK Dogger Bank South (West) Ltd and RWE Renewables UK Dogger Bank South (East) Ltd
-
10.6 August 2024 Geophysical Assessment Report Part 1 of 9 (Revision 1)
(PDF, 49MB)
From RWE Renewables UK Dogger Bank South (West) Ltd and RWE Renewables UK Dogger Bank South (East) Ltd
-
Response to the Rule 6 Letter
(PDF, 203KB)
From RSPB
-
10.12 Phase 2 2024 Archaeological Trial Trenching Technical Note (Revision 1)
(PDF, 443KB)
From RWE Renewables UK Dogger Bank South (West) Ltd and RWE Renewables UK Dogger Bank South (East) Ltd
-
10.6 August 2024 Geophysical Assessment Report Part 8 of 9 (Revision 1)
(PDF, 50MB)
From RWE Renewables UK Dogger Bank South (West) Ltd and RWE Renewables UK Dogger Bank South (East) Ltd
-
10.6 August 2024 Geophysical Assessment Report Part 4 of 9 (Revision 1)
(PDF, 50MB)
From RWE Renewables UK Dogger Bank South (West) Ltd and RWE Renewables UK Dogger Bank South (East) Ltd
-
10.14 Landfall Temporary Construction Compound (TCC) Zone Options 01B and 01D (Revision 1)
(PDF, 4MB)
From RWE Renewables UK Dogger Bank South (West) Ltd and RWE Renewables UK Dogger Bank South (East) Ltd
-
2.6 Works Plan (Onshore) (Revision 3)
(PDF, 13MB)
From RWE Renewables UK Dogger Bank South (West) Ltd and RWE Renewables UK Dogger Bank South (East) Ltd
-
10.6 August 2024 Geophysical Assessment Report Part 5 of 9 (Revision 1)
(PDF, 50MB)
From RWE Renewables UK Dogger Bank South (West) Ltd and RWE Renewables UK Dogger Bank South (East) Ltd
-
2.7 Land Plans (Onshore) (Revision 2)
(PDF, 12MB)
From RWE Renewables UK Dogger Bank South (West) Ltd and RWE Renewables UK Dogger Bank South (East) Ltd
-
10.7 Archaeological Trial Trenching Phase 1 (Final) Part 2 of 4 (Revision 1)
(PDF, 50MB)
From RWE Renewables UK Dogger Bank South (West) Ltd and RWE Renewables UK Dogger Bank South (East) Ltd
-
10.7 Archaeological Trial Trenching Phase 1 (Final) Part 3 of 4 (Revision 1)
(PDF, 50MB)
From RWE Renewables UK Dogger Bank South (West) Ltd and RWE Renewables UK Dogger Bank South (East) Ltd
-
10.8 Archaeological Trial Trenching Phase 2 (Interim) Section 3 (Revision 1)
(PDF, 9MB)
From RWE Renewables UK Dogger Bank South (West) Ltd and RWE Renewables UK Dogger Bank South (East) Ltd
-
10.7 Archaeological Trial Trenching Phase 1 (Final) Part 1 of 4 (Revision 1)
(PDF, 52MB)
From RWE Renewables UK Dogger Bank South (West) Ltd and RWE Renewables UK Dogger Bank South (East) Ltd
-
2.9 Crown Land Plan (Revision 2)
(PDF, 6MB)
From RWE Renewables UK Dogger Bank South (West) Ltd and RWE Renewables UK Dogger Bank South (East) Ltd
-
10.13 Arboricultural Survey Report, Preliminary Arboricultural Impact Assessment and Outline Arboricultural Method Statement Part 2 of 2 (Revision 1)
(PDF, 47MB)
From RWE Renewables UK Dogger Bank South (West) Ltd and RWE Renewables UK Dogger Bank South (East) Ltd
-
1.4 Guide to the Application (Revision 2)
(PDF, 2MB)
From RWE Renewables UK Dogger Bank South (West) Ltd and RWE Renewables UK Dogger Bank South (East) Ltd
-
2.8 Special Category Land Plan (Revision 2)
(PDF, 3MB)
From RWE Renewables UK Dogger Bank South (West) Ltd and RWE Renewables UK Dogger Bank South (East) Ltd
-
2.5 Works Plan (Offshore) (Revision 3)
(PDF, 17MB)
From RWE Renewables UK Dogger Bank South (West) Ltd and RWE Renewables UK Dogger Bank South (East) Ltd
-
10.3 The Applicants’ Responses to Relevant Representations (Revision 1)
(PDF, 2MB)
From RWE Renewables UK Dogger Bank South (West) Ltd and RWE Renewables UK Dogger Bank South (East) Ltd
-
10.13 Arboricultural Survey Report, Preliminary Arboricultural Impact Assessment and Outline Arboricultural Method Statement Part 1 of 2 (Revision 1)
(PDF, 49MB)
From RWE Renewables UK Dogger Bank South (West) Ltd and RWE Renewables UK Dogger Bank South (East) Ltd
-
10.9 Archaeological Trial Trenching Phase 2 (Interim) Section 17 (Revision 1)
(PDF, 12MB)
From RWE Renewables UK Dogger Bank South (West) Ltd and RWE Renewables UK Dogger Bank South (East) Ltd
-
10.7 Archaeological Trial Trenching Phase 1 (Final) Part 4 of 4 (Revision 1)
(PDF, 16MB)
From RWE Renewables UK Dogger Bank South (West) Ltd and RWE Renewables UK Dogger Bank South (East) Ltd
-
10.5 Soil Resource Assessment Survey Results (Revision 1)
(PDF, 21MB)
From RWE Renewables UK Dogger Bank South (West) Ltd and RWE Renewables UK Dogger Bank South (East) Ltd
-
2.17 Water Bodies in a River Basin Management Plan and Coastal Waterbodies (Revision 2)
(PDF, 31MB)
From RWE Renewables UK Dogger Bank South (West) Ltd and RWE Renewables UK Dogger Bank South (East) Ltd
-
2.13 Offshore Statutory and Non-statutory Nature Conservation Sites Plan (Revision 2)
(PDF, 5MB)
From RWE Renewables UK Dogger Bank South (West) Ltd and RWE Renewables UK Dogger Bank South (East) Ltd
-
10.4 Land Rights Tracker (Revision 1)
(PDF, 595KB)
From RWE Renewables UK Dogger Bank South (West) Ltd and RWE Renewables UK Dogger Bank South (East) Ltd
-
7.23.1 Environmental Statement Chapter 23 – Landscape and Visual Impact Assessment - Figure 23-1 to Figure 23-15 (Revision 2)
(PDF, 39MB)
From RWE Renewables UK Dogger Bank South (West) Ltd and RWE Renewables UK Dogger Bank South (East) Ltd
-
Additional Submission - Accepted at the discretion of the Examining Authority
(PDF, 124KB)
From Iain Wolkowski
-
10.2 Change Notification Letter (Revision 1)
(PDF, 386KB)
From RWE Renewables UK Dogger Bank South (West) Ltd and RWE Renewables UK Dogger Bank South (East) Ltd
-
10.1 Response to Rule 6 Letter (Revision 1)
(PDF, 587KB)
From RWE Renewables UK Dogger Bank South (West) Ltd and RWE Renewables UK Dogger Bank South (East) Ltd
-
Response to the Rule 6 Letter
(PDF, 155KB)
From East Riding of Yorkshire Council
-
Other - Gas assets and pipelines
(PDF, 988KB)
From Northern Gas Networks
-
Rule 17 Letter - Request for further information dated 10 October 2024
(PDF, 151KB)
-
Regulation 32 notification response from Denmark
(PDF, 179KB)
From Regulation 32 - notification response from Denmark