-
6.2 Environmental Statement Volume 2 Appendix 8.2: Cultural Heritage - Assessment Methodology
(PDF, 284KB)
O Mallard Pass Solar Farm Limited
-
6.2 Environmental Statement Volume 2 Appendix 11.2: Water Resources and Ground Conditions - Assessment Methodology
(PDF, 331KB)
O Mallard Pass Solar Farm Limited
-
Figure 6.9.A: Photograph Panel A Illustrative Viewpoint A
(PDF, 14MB)
O Mallard Pass Solar Farm Limited
-
Figure 5.3(a): Illustrative Elevations of Container Solar Station
(PDF, 917KB)
O Mallard Pass Solar Farm Limited
-
Figure 5.8: Cable Crossing Options of the East Coast Main Line
(PDF, 4MB)
O Mallard Pass Solar Farm Limited
-
6.2 Environmental Statement Volume 2 Appendix 12.7: Land Use and Soils - British Society of Soil Science 'Extract'
(PDF, 11MB)
O Mallard Pass Solar Farm Limited
-
Figure 6.7: Visual Receptor Groups (VRG) and Zone of Visual Influence (ZVI), Representative Viewpoints and Illustrative Viewpoints and Visual Receptor Groups
(PDF, 2MB)
O Mallard Pass Solar Farm Limited
-
Figure 6.5: Access and Recreation
(PDF, 4MB)
O Mallard Pass Solar Farm Limited
-
Figure 7.6: Breeding bird indicative territories (Map 6 of 6)
(PDF, 5MB)
O Mallard Pass Solar Farm Limited
-
Figure 11.4: Flood Risk Map
(PDF, 3MB)
O Mallard Pass Solar Farm Limited
-
6.1 Environmental Statement Volume 1 - Chapter 16: Interactions of Effects and Summary of Cumulative Effects
(PDF, 417KB)
O Mallard Pass Solar Farm Limited
-
6.2 Environmental Statement Volume 2 Appendix 9.6: Highways and Access - Construction Traffic Impact Assessment
(PDF, 276KB)
O Mallard Pass Solar Farm Limited
-
6.2 Environmental Statement Volume 2 Appendix 10.3: Noise and Vibration - Consultation Summary
(PDF, 302KB)
O Mallard Pass Solar Farm Limited
-
Figure 7.6: Breeding bird indicative territories (Map 5 of 6)
(PDF, 6MB)
O Mallard Pass Solar Farm Limited
-
Figure 8.1: Statutory and Non-Statutory Historic Environment Designations Plan
(PDF, 7MB)
O Mallard Pass Solar Farm Limited
-
Figure 6.8.12: Photograph Panel 12 Representative Viewpoint 12
(PDF, 19MB)
O Mallard Pass Solar Farm Limited
-
7.8 Outline Decomissioning Environmental Management Plan (inc restoration)
(PDF, 704KB)
O Mallard Pass Solar Farm Limited
-
Figure 2.2: Cumulative Developments Shortlisted for Cumulative Effects Assessment (450k)
(PDF, 3MB)
O Mallard Pass Solar Farm Limited
-
Figure 6.8.10: Photograph Panel 10 Representative Viewpoint 10
(PDF, 10MB)
O Mallard Pass Solar Farm Limited
-
Figure 7.5: Water vole evidence
(PDF, 5MB)
O Mallard Pass Solar Farm Limited
-
Figure 12.1: Agricultural Land Classification Results
(PDF, 1MB)
O Mallard Pass Solar Farm Limited
-
6.2 Environmental Statement Volume 2 Appendix 6.4: Landscape and Visual - Residential Visual Amenity Assessment
(PDF, 3MB)
O Mallard Pass Solar Farm Limited
-
6.2 Environmental Statement Volume 2 Appendix 7.5: Ecology and Biodiversity - Shadow Habitat Regulations Assessment
(PDF, 424KB)
O Mallard Pass Solar Farm Limited
-
Figure 6.4: Local Landscape Character Areas
(PDF, 4MB)
O Mallard Pass Solar Farm Limited
-
Figure 7.4: Trees with bat roost suitability (Map 2 of 2)
(PDF, 6MB)
O Mallard Pass Solar Farm Limited
-
Figure 7.6: Breeding bird indicative territories (Map 4 of 6)
(PDF, 5MB)
O Mallard Pass Solar Farm Limited
-
Figure 6.11: Green Infrastructure Strategy Plan
(PDF, 3MB)
O Mallard Pass Solar Farm Limited
-
Figure 6.8.5: Photograph Panel 5 Representative Viewpoint 5
(PDF, 15MB)
O Mallard Pass Solar Farm Limited
-
Figure 6.1: Topography
(PDF, 4MB)
O Mallard Pass Solar Farm Limited
-
Figure 6.6: Zone of Theoretical Visibility Study Representative Viewpoint and Illustrative Viewpoints
(PDF, 4MB)
O Mallard Pass Solar Farm Limited
-
Figure 6.8.15: Photograph Panel 15 Representative Viewpoint 15
(PDF, 22MB)
O Mallard Pass Solar Farm Limited
-
Figure 7.4: Trees with bat roost suitability (Map 1 of 2)
(PDF, 5MB)
O Mallard Pass Solar Farm Limited
-
Figure 10.1: Noise Monitoring Locations
(PDF, 9MB)
O Mallard Pass Solar Farm Limited
-
Figure 5.1(c): Fixed South Facing Central Inverter Illustrative Development Layout
(PDF, 19MB)
O Mallard Pass Solar Farm Limited
-
Figure 5.4: Illustrative Elevations of String Inverter
(PDF, 4MB)
O Mallard Pass Solar Farm Limited
-
Figure 6.8.7: Photograph Panel 7 Representative Viewpoint 7
(PDF, 10MB)
O Mallard Pass Solar Farm Limited
-
Figure 7.6: Breeding bird indicative territories (Map 3 of 6)
(PDF, 6MB)
O Mallard Pass Solar Farm Limited
-
Figure 6.9.H: Photograph Panel H Illustrative Viewpoint H
(PDF, 15MB)
O Mallard Pass Solar Farm Limited
-
Figure 7.3: Phase 1 habitats plan (Map 1 of 3)
(PDF, 8MB)
O Mallard Pass Solar Farm Limited
-
6.2 Environmental Statement Volume 2 Appendix 13.1: Climate Change - Policy Context
(PDF, 331KB)
O Mallard Pass Solar Farm Limited
-
Figure 6.8.8: Photograph Panel 8 Representative Viewpoint 8
(PDF, 14MB)
O Mallard Pass Solar Farm Limited
-
2.6 Location Order Limits and Grid Coordinates Plans
(PDF, 11MB)
O Mallard Pass Solar Farm Limited
-
6.2 Environmental Statement Volume 2 Appendix 9.4: Highways and Access - Transport Assessment
(PDF, 8MB)
O Mallard Pass Solar Farm Limited
-
6.2 Environmental Statement Volume 2 Appendix 13.2: Climate Change - Assessment Methodology
(PDF, 231KB)
O Mallard Pass Solar Farm Limited
-
7.13 Outline Water Management Plan
(PDF, 2MB)
O Mallard Pass Solar Farm Limited
-
7.9 Outline Landscape and Ecology Management Plan
(PDF, 18MB)
O Mallard Pass Solar Farm Limited
-
Figure 5.1(a): Fixed South Facing String Inverter Illustrative Development Layout
(PDF, 22MB)
O Mallard Pass Solar Farm Limited
-
Figure 5.2: Illustrative Elevations for Fixed South Facing and Single Axis Tracker Arrays
(PDF, 743KB)
O Mallard Pass Solar Farm Limited
-
7.1 Statement of Need
(PDF, 3MB)
O Mallard Pass Solar Farm Limited
-
6.2 Environmental Statement Volume 2 Appendix 13.3: Climate Change - Consultation Summary
(PDF, 276KB)
O Mallard Pass Solar Farm Limited
-
Figure 7.6: Breeding bird indicative territories (Map 1 of 6)
(PDF, 4MB)
O Mallard Pass Solar Farm Limited
-
Figure 9.1: Construction Access Routes and Restrictions
(PDF, 6MB)
O Mallard Pass Solar Farm Limited
-
7.14 Outline Travel Plan
(PDF, 1MB)
O Mallard Pass Solar Farm Limited
-
2.3 Illustrative/Indicative Layout Plans - Fixed South Facing String
(PDF, 47MB)
O Mallard Pass Solar Farm Limited
-
6.2 Environmental Statement Volume 2 Appendix 7.2: Ecology and Biodiversity - Assessment Methodology
(PDF, 316KB)
O Mallard Pass Solar Farm Limited
-
6.2 Environmental Statement Volume 2 Appendix 8.4: Cultural Heritage Impact Assessment
(PDF, 30MB)
O Mallard Pass Solar Farm Limited
-
Figure 6.10(c): Photomontage C
(PDF, 59MB)
O Mallard Pass Solar Farm Limited
-
6.1 Environmental Statement Volume 1 - Chapter 11: Water Resources and Ground Conditions
(PDF, 2MB)
O Mallard Pass Solar Farm Limited
-
Figure 3.1: Extents of Order Limits, Solar PV Site, Mitigation and Enhancement Areas and Potential Highway Works
(PDF, 4MB)
O Mallard Pass Solar Farm Limited
-
Figure 5.12: Locations of Primary and Secondary Temporary Construction Compounds
(PDF, 4MB)
O Mallard Pass Solar Farm Limited
-
Figure 7.1: Statutory and Non-Statutory Nature Conservation Designations Plan (Map 2 of 2)
(PDF, 6MB)
O Mallard Pass Solar Farm Limited
-
Figure 11.1: Water Resources and Ground Conditions
(PDF, 2MB)
O Mallard Pass Solar Farm Limited
-
6.2 Environmental Statement Volume 2 Appendix 14.2: Socio-Economics - Assessment Methodology
(PDF, 351KB)
O Mallard Pass Solar Farm Limited
-
Figure 4.1: Stage 1 Concept Masterplan
(PDF, 4MB)
O Mallard Pass Solar Farm Limited
-
Figure 4.3: Concept Masterplan
(PDF, 4MB)
O Mallard Pass Solar Farm Limited
-
7.12 Outline Soil Management Plan (including outline Excavated Materials Management Plan)
(PDF, 22MB)
O Mallard Pass Solar Farm Limited
-
6.1 Environmental Statement Volume 1 - Chapter 12: Land Use and Soils
(PDF, 5MB)
O Mallard Pass Solar Farm Limited
-
6.1 Environmental Statement Volume 1 - Chapter 17: Summary of Significant Effects and Mitigation
(PDF, 315KB)
O Mallard Pass Solar Farm Limited
-
Figure 6.8.11: Photograph Panel 11 Representative Viewpoint 11
(PDF, 19MB)
O Mallard Pass Solar Farm Limited
-
6.2 Environmental Statement Volume 2 Appendix 2.1: Scoping Report
(PDF, 19MB)
O Mallard Pass Solar Farm Limited
-
Figure 1.2: Administrative Boundaries
(PDF, 3MB)
O Mallard Pass Solar Farm Limited
-
7.6 Outline Construction Environmental Management Plan
(PDF, 738KB)
O Mallard Pass Solar Farm Limited
-
6.1 Environmental Statement Volume 1 - Chapter 13: Climate Change
(PDF, 621KB)
O Mallard Pass Solar Farm Limited
-
7.2 Planning Statement and Appendices
(PDF, 8MB)
O Mallard Pass Solar Farm Limited
-
Figure 6.10(d): Photomontage D
(PDF, 27MB)
O Mallard Pass Solar Farm Limited
-
Figure 6.8.16: Photograph Panel 16 Representative Viewpoint 16
(PDF, 16MB)
O Mallard Pass Solar Farm Limited
-
Figure 6.8.19: Photograph Panel 19 Representative Viewpoint 19
(PDF, 4MB)
O Mallard Pass Solar Farm Limited
-
Figure 6.8.3: Photograph Panel 3 Representative Viewpoint 3
(PDF, 15MB)
O Mallard Pass Solar Farm Limited
-
Figure 6.9.G: Photograph Panel G Illustrative Viewpoint G
(PDF, 11MB)
O Mallard Pass Solar Farm Limited
-
Figure 2.1: Cumulative Developments Shortlisted for Cumulative Effects Assessment (100k)
(PDF, 1MB)
O Mallard Pass Solar Farm Limited
-
Figure 5.11: Illustrative Access Track Cross Section
(PDF, 3MB)
O Mallard Pass Solar Farm Limited
-
Figure 11.2: Illustration of Solid Geology
(PDF, 2MB)
O Mallard Pass Solar Farm Limited
-
Figure 11.6: Water Bodies in a River Basin Management Plan
(PDF, 2MB)
O Mallard Pass Solar Farm Limited
-
Figure 6.10(a): Photomontage A
(PDF, 26MB)
O Mallard Pass Solar Farm Limited
-
Figure 7.3: Phase 1 habitats plan (Map 2 of 3)
(PDF, 8MB)
O Mallard Pass Solar Farm Limited
-
7.10 Outline Employment, Skills and Supply Chain
(PDF, 308KB)
O Mallard Pass Solar Farm Limited
-
Acknowledgement of S46 Notification
(PDF, 148KB)
-
S46 Notification
(PDF, 462KB)
-
Adopted by the Secretary of State on 18 March 2022
(PDF, 25MB)
O Scoping Opinion
-
Late response received 10 March 2022 from Natural England
(PDF, 272KB)
O Natural England
-
Errata Letter relating to Scoping Report
(PDF, 66KB)
O Mallard Pass Solar Farm Limited
-
Appendices to Scoping Report submitted to the Secretary of State on 07 February 2022
(PDF, 31MB)
O Mallard Pass Solar Farm Limited
-
Scoping Report submitted to the Secretary of State on 07 February 2022
(PDF, 19MB)
O Mallard Pass Solar Farm Limited