View examination library (PDF, 820KB) containing document reference numbers
-
Procedural Deadline A Submission - Request to be heard at Open Floor Hearing 1 (OFH1)
(PDF, 1KB)
From Sue Cook
-
Notice of hearings to be held the week commencing 15 May 2023
(PDF, 58KB)
From Mallard Pass Solar Farm Limited
-
Rule 6 letter - notification of the preliminary meeting and matters to be discussed
(PDF, 453KB)
-
Note of Unaccompanied Site Inspection - March 2023
(PDF, 158KB)
-
Notification of Additional Member of Panel Appointed
(PDF, 120KB)
-
Additional Submission accepted at the discretion of the Examining Authority - Response to post acceptance s51 advice: 6.2 Environmental Statement Volume 2 Appendix 5.1: Project Parameters (Clean)
(PDF, 323KB)
From Mallard Pass Solar Farm Limited
-
Certificate of Compliance with Section 56 of the Planning Act 2008
(PDF, 81KB)
From Mallard Pass Solar Farm Limited
-
Additional Submission accepted at the discretion of the Examining Authority - Response to post acceptance s51 advice: 2.5 Hedgerows Plans
(PDF, 6MB)
From Mallard Pass Solar Farm Limited
-
Additional Submission accepted at the discretion of the Examining Authority - Response to post acceptance s51 advice: 2.7 Traffic Regulation Measures - Temporary Measures
(PDF, 6MB)
From Mallard Pass Solar Farm Limited
-
Additional Submission accepted at the discretion of the Examining Authority - Response to post acceptance s51 advice: 2.4 Access Rights Way Plan
(PDF, 8MB)
From Mallard Pass Solar Farm Limited
-
Additional Submission accepted at the discretion of the Examining Authority - Response to post acceptance s51 advice: Figure 6.8.9: Photograph Panel 9 Representative Viewpoint 9
(PDF, 11MB)
From Mallard Pass Solar Farm Limited
-
Additional Submission accepted at the discretion of the Examining Authority - Response to post acceptance s51 advice: 2.2 Works Plans
(PDF, 8MB)
From Mallard Pass Solar Farm Limited
-
Additional Submission accepted at the discretion of the Examining Authority - Response to post acceptance s51 advice: 2.6 Location Order Limits and Grid Coordinates Plans
(PDF, 11MB)
From Mallard Pass Solar Farm Limited
-
Additional Submission accepted at the discretion of the Examining Authority - Response to post acceptance s51 advice: 4.1 Statement of Reasons
(PDF, 372KB)
From Mallard Pass Solar Farm Limited
-
Additional Submission accepted at the discretion of the Examining Authority - Response to post acceptance s51 advice: 2.7 Traffic Regulation Measures - Temporary Road Closures
(PDF, 7MB)
From Mallard Pass Solar Farm Limited
-
Additional Submission accepted at the discretion of the Examining Authority - Response to post acceptance s51 advice: 6.2 Environmental Statement Volume 2 Appendix 5.1: Project Parameters (Tracked)
(PDF, 319KB)
From Mallard Pass Solar Farm Limited
-
Additional Submission accepted at the discretion of the Examining Authority - Response to post acceptance s51 advice: Environmental Statement Volume 1 - Chapter 5: Project Description (Clean)
(PDF, 10MB)
From Mallard Pass Solar Farm Limited
-
Additional Submission accepted at the discretion of the Examining Authority - Response to post acceptance s51 advice: Land Referencing Methodology
(PDF, 323KB)
From Mallard Pass Solar Farm Limited
-
Certificate of Compliance with Section 59 of the Planning Act 2008
(PDF, 78KB)
From Mallard Pass Solar Project
-
Additional Submission accepted at the discretion of the Examining Authority - Response to post acceptance s51 advice: Environmental Statement Volume 1 - Chapter 5: Project Description (Tracked)
(PDF, 10MB)
From Mallard Pass Solar Farm Limited
-
Additional Submission accepted at the discretion of the Examining Authority - Applicant response to post acceptance s51 advice
(PDF, 1MB)
From Mallard Pass Solar Farm Limited
-
Certificate of Compliance with Regulation 16 Notice
(PDF, 66KB)
From Mallard Pass Solar Farm Limited
-
Regulation 32 - Transboundary Screening
(PDF, 71KB)
-
Notification of the appointment of Examining Authority
(PDF, 138KB)
-
6.2 Environmental Statement Volume 2 - Appendix 6.6 - LVIA Viewpoint Correspondence - Acceptance at the discretion of the Examining Authority
(PDF, 3MB)
From Mallard Pass Solar Farm Limited
-
Section 56 Notice
(PDF, 61KB)
From Mallard Pass Solar Farm Limited
-
Section 51 advice to the Applicant
(PDF, 174KB)
-
Adequacy of Consultation Representation
(PDF, 591KB)
From South Kesteven District Council
-
Notification of Decision to Accept Application
(PDF, 158KB)
-
Section 55 Checklist
(PDF, 324KB)
-
Adequacy of Consultation Representation
(PDF, 470KB)
From Rutland County Council
-
Adequacy of Consultation Representation
(PDF, 244KB)
From North Northamptonshire Council
-
Adequacy of Consultation Representation
(PDF, 324KB)
From Lincolnshire County Council
-
Adequacy of Consultation Representation
(PDF, 179KB)
From North East Lincolnshire Council
-
6.1 Environmental Statement Volume 1 - Chapter 9: Highways and Access
(PDF, 451KB)
From Mallard Pass Solar Farm Limited
-
6.2 Environmental Statement Volume 2 Appendix 10.4: Noise and Vibration - Baseline Noise Survey
(PDF, 3MB)
From Mallard Pass Solar Farm Limited
-
6.2 Environmental Statement Volume 2 Appendix 14.1: Socio-Economics - Policy Context
(PDF, 370KB)
From Mallard Pass Solar Farm Limited
-
Figure 4.2: Stage 2 Concept Masterplan
(PDF, 4MB)
From Mallard Pass Solar Farm Limited
-
5.2 Consultation Report - Appendices 5-6
(PDF, 35MB)
From Mallard Pass Solar Farm Limited
-
1.4 Section 55 - Acceptance of Application Checklist
(PDF, 3MB)
From Mallard Pass Solar Farm Limited
-
6.2 Environmental Statement Volume 2 Appendix 11.1: Water Resources and Ground Conditions - Policy Context
(PDF, 374KB)
From Mallard Pass Solar Farm Limited
-
6.2 Environmental Statement Volume 2 Appendix 12.3: Land Use and Soils - Consultation Summary
(PDF, 320KB)
From Mallard Pass Solar Farm Limited
-
4.1 Statement of Reasons
(PDF, 428KB)
From Mallard Pass Solar Farm Limited
-
6.2 Environmental Statement Volume 2 Appendix 12.2: Land Use and Soils - Assessment Methodology
(PDF, 389KB)
From Mallard Pass Solar Farm Limited
-
6.2 Environmental Statement Volume 2 Appendix 12.8: Land Use and Soils - Construction Methodology
(PDF, 9MB)
From Mallard Pass Solar Farm Limited
-
2.3 Illustrative/Indicative Layout Plans - Single Axis Tracker String
(PDF, 39MB)
From Mallard Pass Solar Farm Limited
-
2.7 Traffic Regulation Measures Plans - Temporary Measures
(PDF, 5MB)
From Mallard Pass Solar Farm Limited
-
6.2 Environmental Statement Volume 2 Appendix 11.6: Water Resources and Ground Conditions - Surface Water Drainage Strategy
(PDF, 37MB)
From Mallard Pass Solar Farm Limited
-
6.2 Environmental Statement Volume 2 Appendix 7.6: Ecology and Biodiversity - Biodiversity Net Gain Metric
(PDF, 944KB)
From Mallard Pass Solar Farm Limited
-
2.7 Traffic Regulation Measures Plans - Temporary Road Closures
(PDF, 5MB)
From Mallard Pass Solar Farm Limited
-
2.1 Land Plans
(PDF, 7MB)
From Mallard Pass Solar Farm Limited
-
5.2 Consultation Report - Appendices 9-13
(PDF, 20MB)
From Mallard Pass Solar Farm Limited
-
2.5 Hedgerows Plans
(PDF, 6MB)
From Mallard Pass Solar Farm Limited
-
Figure 5.1(b): Single Axis Tracker String Inverter Illustrative Development Layout
(PDF, 17MB)
From Mallard Pass Solar Farm Limited
-
1.1 Covering Letter
(PDF, 2MB)
From Mallard Pass Solar Farm Limited
-
6.2 Environmental Statement Volume 2 Appendix 1.1: Statement of Competence
(PDF, 357KB)
From Mallard Pass Solar Farm Limited
-
6.2 Environmental Statement Volume 2 Appendix 9.3: Highways and Access - Consultation Summary
(PDF, 290KB)
From Mallard Pass Solar Farm Limited
-
6.2 Environmental Statement Volume 2 Appendix 12.4: Land Use and Soils - Agricultural Land Classification Survey
(PDF, 25MB)
From Mallard Pass Solar Farm Limited
-
Figure 5.1(d): Single Axis Tracker Central Inverter Illustrative Development Layout
(PDF, 31MB)
From Mallard Pass Solar Farm Limited
-
2.3 Illustrative/Indicative Layout Plans - Single Axis Tracker Central
(PDF, 56MB)
From Mallard Pass Solar Farm Limited
-
Figure 5.3(c): Illustrative Elevations of Container Solar Station for String Inverters
(PDF, 826KB)
From Mallard Pass Solar Farm Limited
-
6.1 Environmental Statement Volume 1 - Chapter 3: Description of Order limits
(PDF, 326KB)
From Mallard Pass Solar Farm Limited
-
Draft Development Consent Order (SI Template compliant version)
(PDF, 1MB)
From Mallard Pass Solar Farm Limited
-
6.1 Environmental Statement Volume 1 - Chapter 5: Project Description
(PDF, 11MB)
From Mallard Pass Solar Farm Limited
-
6.1 Environmental Statement Volume 1 - Chapter 15: Other Environmental Topics
(PDF, 1MB)
From Mallard Pass Solar Farm Limited
-
6.1 Environmental Statement Volume 1 - Chapter 4: Alternatives and Design Development
(PDF, 572KB)
From Mallard Pass Solar Farm Limited
-
2.2 Work Plans
(PDF, 10MB)
From Mallard Pass Solar Farm Limited
-
5.1 Consultation Report
(PDF, 13MB)
From Mallard Pass Solar Farm Limited
-
5.2 Consultation Report - Appendices 1-4
(PDF, 22MB)
From Mallard Pass Solar Farm Limited
-
6.2 Environmental Statement Volume 2 Appendix 8.5: Cultural Heritage - Geophysical Survey Report
(PDF, 84MB)
From Mallard Pass Solar Farm Limited
-
6.2 Environmental Statement Volume 2 Appendix 9.1: Highways and Access - Policy Context
(PDF, 363KB)
From Mallard Pass Solar Farm Limited
-
4.3 Book of Reference
(PDF, 4MB)
From Mallard Pass Solar Farm Limited
-
6.2 Environmental Statement Volume 2 Appendix 2.3: Scoping Opinion Response Matrix
(PDF, 484KB)
From Mallard Pass Solar Farm Limited
-
6.2 Environmental Statement Volume 2 Appendix 6.2: Landscape and Visual - Assessment Methodology
(PDF, 777KB)
From Mallard Pass Solar Farm Limited
-
6.1 Environmental Statement Volume 1 - Chapter 10: Noise and Vibration
(PDF, 462KB)
From Mallard Pass Solar Farm Limited
-
Figure 6.8.1: Photograph Panel 1 Representative Viewpoint 1
(PDF, 14MB)
From Mallard Pass Solar Farm Limited
-
6.1 Environmental Statement Volume 1 - Chapter 14: Socio-Economics
(PDF, 806KB)
From Mallard Pass Solar Farm Limited
-
3.3 Consents and Licenses required under other legislation
(PDF, 325KB)
From Mallard Pass Solar Farm Limited
-
6.2 Environmental Statement Volume 2 Appendix 7.3: Ecology and Biodiversity - Consultation Summary
(PDF, 450KB)
From Mallard Pass Solar Farm Limited
-
4.4 Schedule of Negotiations and Powers Sought
(PDF, 1MB)
From Mallard Pass Solar Farm Limited
-
Figure 6.2: Non-Statutory Landscape Sites
(PDF, 4MB)
From Mallard Pass Solar Farm Limited
-
Figure 9.2: Link Overview
(PDF, 9MB)
From Mallard Pass Solar Farm Limited
-
6.1 Environmental Statement Volume 1 - Chapter 0: Glossary
(PDF, 353KB)
From Mallard Pass Solar Farm Limited
-
6.1 Environmental Statement Volume 1 - Chapter 2: Overview of Environmental Impact Assessment (EIA) Process
(PDF, 465KB)
From Mallard Pass Solar Farm Limited
-
6.4 Environmental Statement - Non-Technical Summary
(PDF, 18MB)
From Mallard Pass Solar Farm Limited
-
Figure 6.8.13: Photograph Panel 13 Representative Viewpoint 1
(PDF, 18MB)
From Mallard Pass Solar Farm Limited
-
Figure 6.9.F: Photograph Panel F Illustrative Viewpoint F
(PDF, 8MB)
From Mallard Pass Solar Farm Limited
-
Figure 7.7: CONFIDENTIAL - Locations of badger setts
(PDF, 78KB)
From Mallard Pass Solar Farm Limited
-
2.8 Claimed Public Right of Way Plan
(PDF, 1MB)
From Mallard Pass Solar Farm Limited
-
6.2 Environmental Statement Volume 2 Appendix 15.1: Other Environmental Topics - Air Quality Monitoring Data
(PDF, 731KB)
From Mallard Pass Solar Farm Limited
-
6.2 Environmental Statement Volume 2 Appendix 7.1: Ecology and Biodiversity - Policy Context
(PDF, 338KB)
From Mallard Pass Solar Farm Limited
-
6.2 Environmental Statement Volume 2 Appendix 8.3: Cultural Heritage - Consultation Summary
(PDF, 243KB)
From Mallard Pass Solar Farm Limited
-
Figure 7.3: Phase 1 habitats plan (Map 3 of 3)
(PDF, 6MB)
From Mallard Pass Solar Farm Limited
-
6.2 Environmental Statement Volume 2 Appendix 10.1: Noise and Vibration - Policy Context
(PDF, 523KB)
From Mallard Pass Solar Farm Limited
-
Figure 5.9: Illustrative Fencing and Access Gate Elevation
(PDF, 3MB)
From Mallard Pass Solar Farm Limited
-
Figure 6.9.D: Photograph Panel D Illustrative Viewpoint D
(PDF, 22MB)
From Mallard Pass Solar Farm Limited
-
6.2 Environmental Statement Volume 2 Appendix 6.5: Landscape and Visual - Amenity and Recreation Assessment
(PDF, 3MB)
From Mallard Pass Solar Farm Limited
-
6.2 Environmental Statement Volume 2 Appendix 9.5: Highways and Access - Baseline Flows
(PDF, 272KB)
From Mallard Pass Solar Farm Limited
-
6.2 Environmental Statement Volume 2 Appendix 17.1: Summary of Effects - Mitigation Schedule
(PDF, 400KB)
From Mallard Pass Solar Farm Limited
-
7.4 Grid Connection Statement
(PDF, 2MB)
From Mallard Pass Solar Farm Limited