I cannot see how Mallard Pass can be allowed. I seems that it is proposed to be built on 1st class prime agricultural land, for one thing and if it were built in London it would erase the city area. So, why should many village areas be destroyed by such a poorly thought out plan. Then on top of that, when the solar "farm" is deemed unviable, the land will become a useless brownfield site and no good for farming. My final point is that these solar panels, apparently, are made by Chinese slave labour in the Urgar (bad spelling) camps. Hence, I am totally against these plans.