Back to list Mallard Pass Solar Project

Representation by Peter Smith

Date submitted
26 February 2023
Submitted by
Members of the public/businesses

Whilst we are in agreement of the need for renewable energy, we feel that a) the size of Mallard pass and resulting energy generated does not warrant the damage to the local arrable countryside and is therefore to big and should be reduced in size. b) there are numerous redunant airfields in the south kesteven and south lincs areas that are not used and are wasted land which could and should be converted into areas where solar power could be generated