Back to list Bramford to Twinstead

Representation by David Hopps

Date submitted
13 June 2023
Submitted by
Members of the public/businesses

There are several aspects about this project that concerns us: 1. In a previous report our house was described as being trapped between two railway lines of power lines. However as no infrastructure lands on our property we are entitled to no compensation despite the likelihood that our house will lose up to £250,000 of its value as a result of the new lines. 2. That the quality of life of birds and bees takes a higher priority to humans, otherwise the alternative (preferred route) would have been selected. 3. No information is being linked to the massive increase in power line requirements to move the power from Sizewell C.