Representation by Hannah Payne-Cook
- Date submitted
- 19 February 2020
- Submitted by
- Members of the public/businesses
I object to the proposed Aquind Interconnector on the following grounds: * Lack of communication, over the last 2 years. * Delay in issuing the proposed route (date on map 7/11/2019 date of issue 12/12/2019) * Access to information handed to libraries in the city excluding those in the area affected. * Portsmouth is in a high pollution zone - No consideration has been made towards zero carbon measures or damage to natural habitat in the local area. *The proposed route is through major East side of Portsmouth junctions, the current road system is already fully stretched. Closing these routes will cause chaos to city residents. * Proposed length of time for the construction * Environmental damage during the proposed construction: Traffic and transport, Noise and vibrations, Landscape and visual, Heritage and Archaeology, Ecology, Socio Economic, Water Resources and Flood Risk, Ground conditions, Carbon and climate change, Human Health, Soils and Land use, Electric and Magnetic Fields, Waste and Material resources.