Willington C Gas Pipeline

Section 51 advice

The list below includes a record of advice we have provided for this project.

There is a statutory duty, under section 51 of the Planning Act 2008, around an application or potential application. This includes recording the name of the person who requested advice and the advice given. This information has to be made publicly available.

Search advice

Search by key words or the name of person the advice was given to.

Showing 1 to 25 of 49 documents, newest first.

Results per page 25 | View 50 results per page | View 100 results per page

  • View advice to Derby Aero Club

    Query regarding original submissions to the applicant.

  • View advice to K Howell

    Query about the accompanied site visit

  • View advice to Sheffield Metropolitan Council

    After receiving the Rule 8 letter dated 20 January 2014, Sheffield Metropolitan Council queried whether it was correct that they were contacted in regards to the Willington C Gas Pipeline.

  • View meeting with RWE npower

    Teleconference between RWE npower and The Planning Inspectorate

  • View advice to RWE npower - Hugh Morris

    Please see attached meeting note.

  • View meeting with RWE npower

    Pre-submission update meeting between the Planning Inspectorate and the applicant.

  • View advice to RWE npower

    Mr Morris submited a query regarding the required level of pre-application consulation in relation to potential changes in the pipeline?s limit of deviation at the A515 Yoxall road crossing.

  • View advice to RWE npower

    Comments on draft DCO and s127 applications

  • View meeting with Hugh Morris RWE

    Please see attachment.

  • View advice to RWE npower

    You asked us to try to make the Consultation Report as 'user friendly' as possible and we are looking at making the signposts as clear as possible so that appended documents can be located. Also, wher... Read more

  • View meeting with RWE Npower

    Pre-Submission Update and Review

  • View meeting with Willington C Project team

    Tele-conference to update the Planning Inspectorate on the Willington C team?s progress and discuss technical queries in relation to application documents.

  • View advice to Reynolds Porter Chamberlain LLP

    We have been discussing the Article relating to Statutory undertakers' equipment and the insertion of protective provisions into the order i.e as a back up in case we fail to agree something with the ... Read more

  • View advice to RWE Npower

    we are planning our Stage 2 consultations to start in mid July and wish to confirm the requirements of S46. We served our initial S46 notification on the 7th of July 2010, in advance of our Stage ... Read more

  • View advice to Adriana Gasparini

    The planning inspectorate letter of advice to us dated 03/05/2012 refers to the use of a font size and numbering consistent with SI drafting and points us to the Rookery South DCO. Although NID g... Read more

  • View advice to RWE npower

    Could the Inspectorate provide RWE with the list of the s43 local authorities taking account of the amendments introduced by the Localism Act

  • View advice to RWE nPower

    Is it acceptable for the Inspectorate to receive the information in support of s 127 as part of the Statement of Reasons?

  • View advice to RWE npower

    N/a

  • View advice to RWE Npower, RPC, Bruton Knowles

    Please see attached meeting note, letter confirming the advice provided in the meeting and follow up clarification email.

  • View advice to RWE npower

    As a result of changes to the WCGP application program, the actual consultation process will be different to that described in the SOCC. The main difference is that in the SOCC, we proposed holding th... Read more

  • View advice to RPC LLP

    Please advise me about the MP16 survey rights which we spoke about with regard to the drafting of our article 16 and whether NID are likely to be concerned about the extent of land covered by that pr... Read more

  • View advice to RWE npower

    I would like to request your advice regarding the appropriate terminology to describe the submission to Natural England of a GCN license application, during the pre application stage, in order to esta... Read more

  • View meeting with RWE Npower

    To discuss RWE?s application schedule.

  • View advice to RWE npower

    On the 3rd of October, I raised a question regarding the actual process for the transfer of benefit. You advised me to contact DECC regarding this issue and DECC have now responded that they expect th... Read more

  • View meeting with East Staffordshire BC

    At a meeting with the relevant local authorities and RWEnpower for this project on 23 June 2011, RWEnpower asked to which degree an application could be changed following submission