View examination library (PDF, 568KB) containing document reference numbers
-
4.6 Immingham Facilities Plot Plan, Routing and Elevations
(PDF, 4MB)
From Chrysaor Production (UK) Limited
-
6.8 Outline Landscape and Ecological Management Plan
(PDF, 5MB)
From Chrysaor Production (UK) Limited
-
3.2 Statement of Reasons
(PDF, 1MB)
From Chrysaor Production (UK) Limited
-
6.4.6.6 Environmental Statement - Volume IV - Appendix 6-6: Aquatic Ecology Report
(PDF, 11MB)
From Chrysaor Production (UK) Limited
-
7.2 Consents and Agreements Position Statement
(PDF, 322KB)
From Chrysaor Production (UK) Limited
-
6.4.13.1 Environmental Statement - Volume IV - Appendix 13-1: Noise Baseline Data
(PDF, 2MB)
From Chrysaor Production (UK) Limited
-
4.1 Location Plan
(PDF, 3MB)
From Chrysaor Production (UK) Limited
-
6.2.12 Environmental Statement - Volume II - Chapter 12: Traffic and Transport
(PDF, 6MB)
From Chrysaor Production (UK) Limited
-
4.4 Crown Land Plans
(PDF, 15MB)
From Chrysaor Production (UK) Limited
-
1.2 Section 55 Checklist
(PDF, 372KB)
From Chrysaor Production (UK) Limited
-
6.4.11.4 Environmental Statement - Volume IV - Appendix 11-4: Water Framework Directive (WFD) Assessment
(PDF, 7MB)
From Chrysaor Production (UK) Limited
-
4.14 Washingdales Lane Block Valve Station Plan and Elevations
(PDF, 1MB)
From Chrysaor Production (UK) Limited
-
6.4.3.6 Environmental Statement - Volume IV - Appendix 3-6: Operational Phase Mitigation
(PDF, 363KB)
From Chrysaor Production (UK) Limited
-
6.3.3 Environmental Statement - Volume III - Figures: Part 3 of 3 - High Resolution
(PDF, 51MB)
From Chrysaor Production (UK) Limited
-
6.4.8.1 Environmental Statement - Volume IV - Appendix 8-1: Historic Environment Desk Based Assessment
(PDF, 38MB)
From Chrysaor Production (UK) Limited
-
5.2.3 Consultation Report - Appendix C - Appendices to Chapter Four
(PDF, 36MB)
From Chrysaor Production (UK) Limited
-
6.2.6 Environmental Statement - Volume II - Chapter 6: Ecology and Biodiversity
(PDF, 10MB)
From Chrysaor Production (UK) Limited
-
6.4.8.2 Environmental Statement - Volume IV - Appendix 8-2: Aerial Review and Light Detection and Ranging (LiDAR)
(PDF, 8MB)
From Chrysaor Production (UK) Limited
-
6.4.11.2 Environmental Statement - Volume IV - Appendix 11-2: Site Visit Technical Note - Water
(PDF, 29MB)
From Chrysaor Production (UK) Limited
-
1.5 Guide to the Application
(PDF, 406KB)
From Chrysaor Production (UK) Limited
-
6.2.19 Environmental Statement - Volume II - Chapter 19: Major Accidents and Disasters
(PDF, 839KB)
From Chrysaor Production (UK) Limited
-
2.2 Explanatory Memorandum to the Draft Development Consent Order
(PDF, 463KB)
From Chrysaor Production (UK) Limited
-
4.10 Indicative Central Construction Compound Layout
(PDF, 363KB)
From Chrysaor Production (UK) Limited
-
5.2.5 Consultation Report - Appendix E - Appendices to Chapter Six
(PDF, 2MB)
From Chrysaor Production (UK) Limited
-
6.2.18 Environmental Statement - Volume II - Chapter 18: Materials and Waste
(PDF, 7MB)
From Chrysaor Production (UK) Limited
-
6.4.3.5 Environmental Statement - Volume IV - Appendix 3-5: Decommissioning Strategy
(PDF, 6MB)
From Chrysaor Production (UK) Limited
-
6.4.6.10 Environmental Statement - Volume IV - Appendix 6-10: Arboriculture Report
(PDF, 33MB)
From Chrysaor Production (UK) Limited
-
4.8 Theddlethorpe Facilities Option 2, Plot Plan, Routing and Elevations
(PDF, 5MB)
From Chrysaor Production (UK) Limited
-
6.2.8 Environmental Statement - Volume II - Chapter 8: Historic Environment
(PDF, 12MB)
From Chrysaor Production (UK) Limited
-
6.4.9.1 Environmental Statement - Volume IV - Appendix 9-1: Geology Summary Tables
(PDF, 1MB)
From Chrysaor Production (UK) Limited
-
6.5 Report to Inform the Habitats Regulations Assessment
(PDF, 16MB)
From Chrysaor Production (UK) Limited
-
1.1 Covering Letter
(PDF, 367KB)
From Chrysaor Production (UK) Limited
-
6.4.11.1 Environmental Statement - Volume IV - Appendix 11-1: Water Environment Supporting Baseline Information
(PDF, 11MB)
From Chrysaor Production (UK) Limited
-
4.18 Temporary Flume Design
(PDF, 621KB)
From Chrysaor Production (UK) Limited
-
4.20 Public Access and Rights of Way Plan
(PDF, 26MB)
From Chrysaor Production (UK) Limited
-
4.2 Works Plans (Part 1 of 2)
(PDF, 51MB)
From Chrysaor Production (UK) Limited
-
6.2.14 Environmental Statement - Volume II - Chapter 14: Air Quality
(PDF, 27MB)
From Chrysaor Production (UK) Limited
-
2.1 Draft Development Consent Order
(PDF, 2MB)
From Chrysaor Production (UK) Limited
-
4.15 Thoroughfare Block Valve Station Plan and Elevations
(PDF, 13MB)
From Chrysaor Production (UK) Limited
-
6.4.6.7 Environmental Statement - Volume IV - Appendix 6-7: Ornithology Baseline Report
(PDF, 24MB)
From Chrysaor Production (UK) Limited
-
6.4.11.5 Environmental Statement - Volume IV - Appendix 11-5: Flood Risk Assessment
(PDF, 25MB)
From Chrysaor Production (UK) Limited
-
6.12 Viking CCS Bridging Document
(PDF, 10MB)
From Chrysaor Production (UK) Limited
-
Statutory Instrument template validation report
(PDF, 1MB)
From Chrysaor Production (UK) Limited
-
6.4.6.3 Environmental Statement - Volume IV - Appendix 6-3: Otter and Water Vole Survey Report
(PDF, 14MB)
From Chrysaor Production (UK) Limited
-
4.9 Indicative Northern Construction Compound Layout
(PDF, 302KB)
From Chrysaor Production (UK) Limited
-
6.4.14.1 Environmental Statement - Volume IV - Appendix 14-1: Construction Dust Methodology
(PDF, 415KB)
From Chrysaor Production (UK) Limited
-
6.4.20.1 Environmental Statement - Volume IV - Appendix 20-1: Cumulative Effects Assessment Long List
(PDF, 782KB)
From Chrysaor Production (UK) Limited
-
6.2.5 Environmental Statement - Volume II - Chapter 5: Environmental Impact Assessment (EIA) Methodology
(PDF, 582KB)
From Chrysaor Production (UK) Limited
-
6.4.10.1 Environmental Statement - Volume IV - Appendix 10-1: Outline Soil Management Plan
(PDF, 5MB)
From Chrysaor Production (UK) Limited
-
5.2.6 Consultation Report - Appendix F - Appendices to Chapter Seven
(PDF, 8MB)
From Chrysaor Production (UK) Limited
-
7.3 Need Case for the Scheme
(PDF, 804KB)
From Chrysaor Production (UK) Limited
-
6.4.11.6 Environmental Statement - Volume IV - Appendix 11-6: Outline Surface Water Management Plan
(PDF, 8MB)
From Chrysaor Production (UK) Limited
-
6.4.12.3 Environmental Statement - Volume IV - Appendix 12-3: Construction Traffic Profiles
(PDF, 943KB)
From Chrysaor Production (UK) Limited
-
6.2.2 Environmental Statement - Volume II - Chapter 2: Design Evolution and Alternatives
(PDF, 16MB)
From Chrysaor Production (UK) Limited
-
3.3 Book of Reference
(PDF, 18MB)
From Chrysaor Production (UK) Limited
-
6.4.13.4 Environmental Statement - Volume IV - Appendix 13-4: Habitats Regulations Assessment (HRA) Noise Assessment
(PDF, 21MB)
From Chrysaor Production (UK) Limited
-
1.3 Application Form
(PDF, 154KB)
From Chrysaor Production (UK) Limited
-
6.4.6.1 Environmental Statement - Volume IV - Appendix 6-1: Phase 1 Habitat Survey Report
(PDF, 27MB)
From Chrysaor Production (UK) Limited
-
6.4.6.2 Environmental Statement - Volume IV - Appendix 6-2: Bat Survey Report
(PDF, 14MB)
From Chrysaor Production (UK) Limited
-
5.2.1 Consultation Report - Appendix A - Appendices to Chapter Two
(PDF, 16MB)
From Chrysaor Production (UK) Limited
-
6.4.6.5 Environmental Statement - Volume IV - Appendix 6-5: Hedgerow Survey Report
(PDF, 16MB)
From Chrysaor Production (UK) Limited
-
Adequacy of Consultation Representation
(PDF, 182KB)
From North Lincolnshire Council
-
Adequacy of Consultation Representation
(PDF, 514KB)
From North Kesteven District Council
-
Adequacy of Consultation Representation
(PDF, 205KB)
From North East Lincolnshire Council
-
6.2 Environmental Statement - Volume II - Abbreviations, Glossary and Contents
(PDF, 696KB)
From Chrysaor Production (UK) Limited
-
6.4.7.2 Environmental Statement - Volume IV - Appendix 7.2: Visualisations
(PDF, 49MB)
From Chrysaor Production (UK) Limited
-
6.4.9.2 Environmental Statement - Volume IV - Appendix 9-2: The Coal Mining Authority - Coal Mining Report
(PDF, 3MB)
From Chrysaor Production (UK) Limited
-
6.4.11.3 Environmental Statement - Volume IV - Appendix 11-3: Drainage Strategy
(PDF, 1MB)
From Chrysaor Production (UK) Limited
-
5.2.2 Consultation Report - Appendix B - Appendices to Chapter Three
(PDF, 2MB)
From Chrysaor Production (UK) Limited
-
7.1 Planning Design and Access Statement
(PDF, 2MB)
From Chrysaor Production (UK) Limited
-
6.2.16 Environmental Statement - Volume II - Chapter 16: Socio- economics
(PDF, 5MB)
From Chrysaor Production (UK) Limited
-
6.3.1 Environmental Statement - Volume III - Figures: Part 1 of 3
(PDF, 50MB)
From Chrysaor Production (UK) Limited
-
6.4.5.3 Environmental Statement - Volume IV - Appendix 5-3: Response to Scoping Opinion
(PDF, 1MB)
From Chrysaor Production (UK) Limited
-
6.4.8.3 Environmental Statement - Volume IV - Appendix 8-3: Written Scheme of Investigation (WSI) for Archaeological Evaluation. Superseded by AS-001
(PDF, 40MB)
From Chrysaor Production (UK) Limited
-
6.4.12.2 Environmental Statement - Volume IV - Appendix 12-2: Construction Traffic Flows
(PDF, 1MB)
From Chrysaor Production (UK) Limited
-
6.2.1 Environmental Statement - Volume II - Chapter 1: Introduction
(PDF, 7MB)
From Chrysaor Production (UK) Limited
-
Adequacy of Consultation Representation
(PDF, 180KB)
From South Holland District Council
-
6.4.12.5 Environmental Statement - Volume IV - Appendix 12-5: Draft Construction Traffic Management Plan
(PDF, 3MB)
From Chrysaor Production (UK) Limited
-
4.12 Welfare and Parking Layout
(PDF, 378KB)
From Chrysaor Production (UK) Limited
-
6.2.21 Environmental Statement - Volume II - Chapter 21: Summary of Likely Significant Effects
(PDF, 438KB)
From Chrysaor Production (UK) Limited
-
6.4.9.3 Environmental Statement - Volume IV - Appendix 9-3: Hydrogeological Risk Assessment
(PDF, 13MB)
From Chrysaor Production (UK) Limited
-
6.4.6.4 Environmental Statement - Volume IV - Appendix 6-4: Badger Survey Report (Confidential)
(PDF, 80KB)
From Chrysaor Production (UK) Limited
-
6.10 Plans showing Statutory / Non-Statutory Features of the Historic Environment
(PDF, 14MB)
From Chrysaor Production (UK) Limited
-
1.6 Application Glossary
(PDF, 341KB)
From Chrysaor Production (UK) Limited
-
4.13 Laydown, Welfare and Parking Area
(PDF, 377KB)
From Chrysaor Production (UK) Limited
-
6.2.4 Environmental Statement - Volume II - Chapter 4: Consultation
(PDF, 443KB)
From Chrysaor Production (UK) Limited
-
Adequacy of Consultation Representation
(PDF, 391KB)
From West Lindsey District Council
-
Adequacy of Consultation Representation
(PDF, 600KB)
From Bassetlaw District Council
-
Adequacy of Consultation Representation
(PDF, 132KB)
From Newark and Sherwood District Council
-
4.2 Works Plans (Part 2 of 2)
(PDF, 22MB)
From Chrysaor Production (UK) Limited
-
6.2.15 Environmental Statement - Volume II - Chapter 15: Climate Change
(PDF, 891KB)
From Chrysaor Production (UK) Limited
-
6.4.12.1 Environmental Statement - Volume IV - Appendix 12-1: Transport Baseline Survey Data
(PDF, 5MB)
From Chrysaor Production (UK) Limited
-
6.4.19.3 Environmental Statement - Volume IV - Appendix 19-3: Draft Emergency Response Plan
(PDF, 409KB)
From Chrysaor Production (UK) Limited
-
6.2.20 Environmental Statement - Volume II - Chapter 20: Cumulative Effects Assessment
(PDF, 3MB)
From Chrysaor Production (UK) Limited
-
6.4.3.2 Environmental Statement - Volume IV - Appendix 3-2: Crossing Schedule
(PDF, 682KB)
From Chrysaor Production (UK) Limited
-
6.4.3.3 Environmental Statement - Volume IV - Appendix 3-3: Indicative Plant and Equipment List
(PDF, 342KB)
From Chrysaor Production (UK) Limited
-
6.4.9.4 Environmental Statement - Volume IV - Appendix 9-4: Conceptual Site Model
(PDF, 477KB)
From Chrysaor Production (UK) Limited
-
6.4.19.1 Environmental Statement - Volume IV - Appendix 19-1: Major Accidents and Disasters Long List
(PDF, 548KB)
From Chrysaor Production (UK) Limited
-
6.7.2 Draft Biodiversity Net Gain Strategy
(PDF, 464KB)
From Chrysaor Production (UK) Limited
-
6.9.3 Waterbodies in a River Basin Management Plan
(PDF, 13MB)
From Chrysaor Production (UK) Limited