Back to list Viking CCS Pipeline

Representation by Malcolm Grebby

Date submitted
29 November 2023
Submitted by
Members of the public/businesses
  1. I attended 2 seminars at both I was told that the co2 produced was going to be the by product of Blue hydrogen. This is not the case. 2 Original plans did not show the ( pumping stations on route. The use of Diesel to operate them is not really acceptable, plus the King granted the area a place of natural beauty, 3) One of the pipelines in America fractured,, fortunately no one was in proximity what’s to stop this happening here . The trench is only 6 foot deep carrying a 2 foot diameter pipe