Skip to main content
Find a National Infrastructure Project

This is a beta service - your feedback will help us to improve it

Back to list Viking CCS Pipeline

Representation by DDM Agriculture (DDM Agriculture) on behalf of Grainsby Farms Limited (Grainsby Farms Limited)

Date submitted
14 January 2024
Submitted by
Members of the public/businesses
  1. Agreement on unfarmable severed areas; 2. Management of severed land; 3. Control of (injurious) weeds on stored soils; 4. Maintaining on-going water supplies to residential premises; 5. Confirmation that the Traffic Management Plan (TMP) will preclude any construction traffic going through Grainsby from the A.16 or from the pipeline spread to the A16; 6. The TMP will prohibit access down Grainsby Lane from the A.18 to the pipeline spread, other than allowing a small number of LGVs and cars; 7. Initial minimum public liability insurance of not less than £10,000,000; 8. A minimum depth of pipeline cover of not less than 1.20 metres; 9. Protection of rights to install future infrastructure and/or services across the pipeline easement; 10. Security provisions to prevent unauthorised access to private property via the pipeline spread; 11. Agreement over temporary amendments to Public Rights of Way during construction works; 12. Provision of specific methods of working for all aspects of construction; 13. Agreement of all access points onto the pipeline spread; 14. Confirmation that there will be no Temporary Construction Compounds (TCC) on our property; 15. Confirmation that construction and reinstatement works will only take place when ground conditions are appropriate; 16. Pre- and post-construction drainage works will be agreed prior to first entry for construction; 17. Pre-construction drainage works will be implemented prior to first entry for construction works; 18. Agreement as to detailed boundaries of the proposed Block Valve (BV) site on our property, including possible curvature of southern corner(s); 19. Review of the most appropriate access to the BV site during construction; 20. The location of the BV site must not be so close to the existing farm track that it precludes the free movement of wide agricultural machinery; 21. Confirmation that the BV will have its own independent access from the public highway; 22. Confirmation that the Lease will be surrendered when/if the pipeline is no longer required for the transmission of carbon dioxide; and 23. Confirmation that reinstatement of the proposed Block Valve site will return the property to the same condition as shown in the pre-entry Record of Condition.