The main point I wish to make is that I know the tunnel has to be built but it has to be long enough to eleminate traffic noise from the monument and that no part of the road, cuttings and associated structures should be seen from the site. This has to be a joint venture between the road builders and the Stonehenge alliance with any findings during construction to be examined thoroughly and further construction to be delayed till Stonehenge alliance has finished with the find. This may add to the cost but as Stonehenge is the most important historical site in the country, I’m sure the general public will not mind bearing the extra.