Back to list A303 Stonehenge

Representation by Peter Wrighton

Date submitted
11 January 2019
Submitted by
Members of the public/businesses

Representation is to cover aspects of the Countess Roundabout flyover and the impact on residents of Countess Road during construction and subsequent operation. This includes the noise mitigation measures in the design of the flyover and its approaches, minimising the impact of the contractor's site during construction particularly at night, the management of traffic flows along the A345 during construction, the effective operation of the roundabout following the opening of the flyover and reducing pollution by minimising traffic flow disturbance, retaining pedestrian access from Countess Road into Amesbury during construction and in operation.