Back to list Lower Thames Crossing

Representation by Keith Banks

Date submitted
9 January 2023
Submitted by
Members of the public/businesses
  1. That every effort will be made to recruit workers locally 2. That if there is a toll levied all residents within a 10 mile radius will be given a preferential pass. 3. Every care will be taken to ensure that the additional wear and tear to existing roads due to construction traffic will be both maintained and made good during and at the end of the project