Back to list Lower Thames Crossing

Representation by John England

Date submitted
9 January 2023
Submitted by
Members of the public/businesses

Why destroy large portions of South Essex and North Kent, when the relief is required 10 miles away. Its a simple fix that if it had been your preferred option would probably be well under construction by now. A deep pair of tunnels for M25 traffic Only entering from the south of the A2 junction and emerging north of the A13 junction. The existing crossings would then be for local traffic only. this would also alleviate local congestion at seasonal periods. just about every road layout you people design is useless before its put into service. two major shopping outlets with inadequate road systems and a major Hospital you should hang your heads in shame. A child playing with cars on a carpet could come up with a better thought out plan than all your educated heads have managed and caused major delays in getting it off the ground, and its still no nearer all the time the costs are escalating. Surveys done along the route how much has this cost, un certainty for residents along its entire route. you should have been characters in only fools and Horese