Representation by Graham Bates
- Date submitted
- 10 January 2023
- Submitted by
- Members of the public/businesses
I have concerns over the A228 at North Halling through to Cuxton. The Halling Bypass ends at the new Redrow Housind Development and the A228 is a dangerous place to be at peak times. My concerns include an increase in volume of traffic as the A228 is an obvious route from the M20 to the new Lower Thames Crossing. Bush Road Cuxton is also a concern as is th roundabout at the junction of the A228 and the M2. The A228 is already at capacity at peak times and something needs doing to mitigate the increase of traffic when the new Lower Thames Crossing is introduced.