Representation by Grahame Parsons

Date submitted
20 August 2021
Submitted by
Members of the public/businesses

My representation main points are: 1. Currently the traffic flow between the end of the M67 and Mottram and beyond is absolutely abysmal for commuters in both directions causing major regular hold-ups and traffic back-up. 2. Travel through Mottram from Glossop for onward journeys to Stalybridge/Ashton for visits to Tameside Hospital for example is currently a horrendous experience due to the unacceptable hold-ups caused by the volume of traffic passing through Mottram. 3. For residents of Mottram points 1 and 2 above are making life a misery.