Filter

A57 Link Roads (previously known as Trans Pennine Upgrade Programme)

Relevant representations (registration comments)

Search by the person or group making the submission or the content of the submission.

Showing 351 to 375 of 909 representations, newest first.

Results per page 25 | View 50 results per page | View 100 results per page

  • Steven Howarth

    I live in glossop and agree with the proposed bypass.

  • Thomas Kassar

    I've been through a lot of recruitment calls for jobs from Manchester and further and everybody who I speak to(even someone I met in London) know Mottram Moore. It's a joke that the motorway ends at... Read more

  • Allan Dyer

    Living in Tintwistle and therefore personally experiencing, almost on a daily basis, the challenges faced as a result of the increasing volumes of traffic pouring through the village, gives me endless... Read more

  • John Brandreth

    1, I lived on the A57 road for 30 years and in the area for almost 50 years. The volume of traffic on the A57 and A628 has increase tremendously causing delays and the slightest traffic problem i.e. a... Read more

  • Paul Egan

    The first part of the link is only half of what's required. We need the first part but the second must follow to make any true impact on traffic around Glossop and Tintwistle.

  • Stephen Robinson

    I have lived in Hadfield for over 20 years. I regularly need to "escape" Glossop / Hadfield for work / visit family on the Manchester side. My main points: - It’s getting worse covid gave a temp... Read more

  • Trans Pennine Trail (Trans Pennine Trail)

    The Trans Pennine Trail (TPT) is a multi-user route through 27 Local Authorities across the north of England and is used by thousands of people every day as a route to school / work or as part of... Read more

  • Christine Brandreth

    Having lived on the area for most of my life and on the A57 for 30 years of that, I have seen an enormous increase in the amount of traffic passing through small villages and causing tremendous... Read more

  • David Stirk

    The construction of the by-pass is imperative to the future growth within Glossopdale. Without it the area will simply stagnate due to the endless lines of slow moving and stationary traffic. 1995 I... Read more

  • Gordon John Gange

    I live in Hadfield, close to the A57. Like many in the Glossop area I do not want this scheme to go ahead until the Tintwistle stage is complete. A Mottram Bypass is not going to help Tintwistle,... Read more

  • Jennifer Willis

    I am deeply disappointed that this is going ahead. It will have significant environmental implications for our local wildlife. It will move the current congestion problem elsewhere, ie Hollingworth... Read more

  • Joanna Lyon

    I support the need for the Scheme. To leave the Glossop area and reach services, leisure and employment opportunities within the neighbouring Greater Manchester area, there is little choice but to use... Read more

  • Jocelyn Street

    The congestion due to a lack of bypass has been dreadful for years and should have been dealt with long ago. It has become ever more necessary.

  • Matt Hankins

    myself and my family are in total agreement for the need for this bypass to alleviate traffic and fumes in this area, we must have this bypass without delay

  • Jill Crossland

    I support the planning application. As a resident of Tintwistle for over 40 years we need this road improvement scheme more than ever before. It would appear all other areas of the country have been... Read more

  • Jocelyn Thornton

    I regularly need to drive to and from Scotland, and my preferred route is from the M60 through the outskirts of Glossop and Hayfield to Buxton. There are regularly very long queues and delays at the... Read more

  • S Walsh

    Quite simply getting in and out of Glossop is taking up an increasingly large part of my working and social days. It is not good for my state of mind.

  • Chris Lomas

    I support the building of the bypass and all the positive effects it will have. Mottram moor is a bottleneck and blighted this town for too long.

  • Christine Osborne

    I am writing to state how important it is that Glossopdale gets a Bypass. Traffic in the area has been horrific for years. I have lived here since 1978 - there have been issues about traffic not being... Read more

  • Joanna Collins

    The scheme would increase traffic on residential roads in Glossopdale, on the M67 motorway into Manchester and on roads across the Peak District National Park, bringing more congestion and climate... Read more

  • Melvyn Matthews

    The present plans will produce a further bottleneck just over a mile away at the lights at the Gunn Inn causing more delays into Glossop, and not giving any benefit to the traffic at Hollinworth, in... Read more

  • Anne Blears

    In the light of the challenge of global warming and the government’s commitment to net zero, I do not believe that the building of this link road is the most appropriate way to address the transport... Read more

  • Nigel Godding on behalf of Nigel & Elizabeth Godding

    Having this Bypass will alleviate a lot of traffic and queuing time around Mottram, Hollingworth and Tintwistle area, particularly at peak times. Studies show that it would make it significantly... Read more

  • Samantha Bennett

    The bypass is urgently required as the area becomes unusable most of the time due to exceedingly high volumes of traffic.

  • Ashley Hannay

    Glossop High Street is a traffic nightmare, the by-pass is essential.